光伏系统不是一张设备清单。
发电、储能、变换与配电必须围绕同一套负载、同一个运行范围来定义。
左右滑动查看完整示意图 →
图示为示意。实际配置取决于现场条件、并网协议与约定范围。
围绕你的现场,做一份方案。
节省与韧性取决于配置、运行条件与约定的范围。我们先评估,再定义配置。
Assess
Load profile, tariff, existing electrical arrangement and critical loads. For residential: roof, consumption pattern and backup priorities.
Design
System size, storage duration, protection and interfaces — against the operating conditions of the site, not a template.
Validate
Approved configurations only. Ratings, compatibility and protection settings are checked against product evidence — not assumed.
Deliver
The proposal defines equipment, installation responsibilities, compatibility and support — including what the partner supplies.
Know exactly what is included.
Your proposal defines equipment, installation responsibilities, compatibility and support. The table below states which parts we supply, which are optional and which sit with your installer or developer.
Where a project crosses these boundaries, we document the interface rather than assuming it. Scope is confirmed per project in writing.
说说你的现场。
我们在一个工作日内确认收到询价。技术评估的时间安排,将在审阅你的需求后确认。