电力电子 · 中压至 800 VDC

为家庭与企业提供更智能的能源。
为数据中心提供一体化供电。

探索光伏与储能方案,以及面向关键数字基础设施的先进供电架构。

Singapore office · +65 6514 1618 · sales@lumivoltenergy.com

自有研发与制造 认证状态完全公开 一个工作日内确认
Global operations

Coordinated from Singapore. Delivered by our own engineering team.

Our Singapore office handles commercial enquiries, partner onboarding and project coordination for international buyers. Design, testing and manufacturing stay in one technical team — so the engineer who answers your first question is the one accountable at shipment.

Regional office
Singapore

International sales, partner onboarding and project coordination.

Address18 Kaki Bukit Road 3, #05-17
Entrepreneur Business Centre
Singapore 415978
Time zoneGMT+8 · Asia/Singapore
Talk to the Singapore office →
What happens after you contact us
  1. Confirmed within one business dayYour enquiry goes to a named engineer, who reviews the application, target market and applicable standard.
  2. A scoped answer, in writingConfiguration, interface boundary and lead time — stated before you commit to anything.
  3. Proposal, and where it fits a validation unitFor pilots we ship a unit built to your operating envelope, not a brochure.

Markets: Southeast Asia · Europe · Middle East · North America

共享工程底座

为协同工作而设计的电力系统。

一体化在这里不是口号 —— 它决定了方案必须界定什么,以及由谁负责。

接口协同

储能、变换与配电按同一个运行边界来定义,而不是从不同产品目录里拼起来。

范围清晰

方案在项目开始前就明确:我们交付什么、合作方交付什么、接口在哪里。

应用导向设计

起点是负载曲线与现场约束,产品配置由它推导而来。

固态变压器

一台设备。没有工频变压器,也没有独立变流器。

我们的 SST 开发项目,评估中压变换、高频隔离与协同控制。它可以合并多个传统环节 —— 但并非所有功能都已商业化验证,我们会如实标注状态。

查看 SST 架构 →

经得起验证。

认证状态、测试数据、供应链可追溯 —— 我们公开,而不是承诺。

查看质量与合规 →

告诉我们你的需求。

报价 · OEM / ODM · 渠道合作。我们在一个工作日内确认收到询价。

了解合作方式 →
首页 / 解决方案

解决方案

我们按应用场景而不是产品型号来组织方案。先找到与你项目匹配的场景,再和我们的工程师谈细节。

首页 / 太阳能方案

让每一度太阳能都用得上。

面向家庭与企业,提供光伏、储能与能量管理的协同方案。

系统如何协同

光伏系统不是一张设备清单。

发电、储能、变换与配电必须围绕同一套负载、同一个运行范围来定义。

光伏发电 电网接入 混合逆变器 / PCS 变换与控制 电池储能 低压配电 保护与计量 用电负载 家庭或企业

左右滑动查看完整示意图 →

图示为示意。实际配置取决于现场条件、并网协议与约定范围。

从评估到交付

围绕你的现场,做一份方案。

节省与韧性取决于配置、运行条件与约定的范围。我们先评估,再定义配置。

01

Assess

Load profile, tariff, existing electrical arrangement and critical loads. For residential: roof, consumption pattern and backup priorities.

02

Design

System size, storage duration, protection and interfaces — against the operating conditions of the site, not a template.

03

Validate

Approved configurations only. Ratings, compatibility and protection settings are checked against product evidence — not assumed.

04

Deliver

The proposal defines equipment, installation responsibilities, compatibility and support — including what the partner supplies.

What is in the scope

Know exactly what is included.

Your proposal defines equipment, installation responsibilities, compatibility and support. The table below states which parts we supply, which are optional and which sit with your installer or developer.

PV modules Partner-supplied If your project includes PV, it is supplied by you or your installer — or we can introduce a partner.
Inverter / PCS Included Hybrid inverter or PCS selected from approved models, matched to the storage configuration.
Battery system Included LFP modules with integrated BMS, enclosure and thermal design for the target market.
LV distribution & protection Optional Optional integrated low-voltage distribution, so storage and protection are specified together.
EMS & monitoring Included Energy management and monitoring, with data the household can read and the installer can act on.
Installation & commissioning Partner-supplied Carried out by your approved installer. We provide commissioning checklists and technical support.
Grid connection application Customer / developer Usually the customer’s or developer’s responsibility. We supply the technical documentation to support it.

Where a project crosses these boundaries, we document the interface rather than assuming it. Scope is confirmed per project in writing.

说说你的现场。

我们在一个工作日内确认收到询价。技术评估的时间安排,将在审阅你的需求后确认。

申请光伏评估 →
首页 / 太阳能方案 / 户用储能系统

把自家发的电,更多地用在家里。

按家庭的用电方式,匹配光伏发电、电池储能与备电优先级。

家里会有什么不同

一套协同系统要交付的三个结果。

每一项都取决于配置与现场条件,而不是宣传册上的一句话。

✓

更高的自发自用

把白天多余的发电存起来,晚上再用,而不是以低价上网。可用比例取决于用电曲线、电价与电池容量。

✓

看得见的运行

监控分别显示发电、储能与用电,你能直接看到系统在做什么,而不是靠账单反推。

✓

备电范围先定义,再承诺

先列出哪些负载需要备电、需要多久,再确定切换方案。备电是设计决策,不是一句笼统承诺。

找到适合你家的配置

已批准的型号按市场发布。

每份方案都会写明具体型号与下列五项参数。仍在测试中的数字,方案会明确说明。

✓

可用容量(kWh)

写可用容量,不写标称容量 —— 按约定的放电深度与寿命终止标准标明。

✓

持续功率(kW)

在标称环境温度下的持续输出;过载能力单独说明。

✓

相数与接入

单相或三相,以及该型号获批的并网接入方式。

✓

备电上限

可备电的负载、切换时间与最大备电功率。

✓

市场可用性

型号已发布的市场、认证状态与交期依据。

✓

我们不会做的事

不会报价未经你所在市场批准的参数。仍在测试中的数字,方案会明确说明。

典型配置
可用容量多规格可选(按项目)
电芯体系LFP
安装方式壁挂式 / 落地式
接线制式单相 / 三相
认证状态

详见我们公开的认证路线图 —— 包括仍在进行中的项目。

我们交付什么
  • 电池模组与电池包,集成 BMS
  • 混合逆变器 / 变流器,支持并网与备电运行
  • 可选的一体化低压配电
  • 监控与能量管理
  • 规格书、安装文档与技术支持
面向客户

服务住宅市场的安装商、经销商与 OEM 合作伙伴。

深入解读

决定户用储能项目成败的,到底是什么

户用储能在市场上有个通病:宣传口径过于简单。纸面上看逻辑很清楚——把发的电存起来,需要时再用,少从电网买电。但现实中,多数装了电池的家庭在头一个月里会发现三件事:安装比宣传册上说的麻烦得多、实际功能比预期少、而且没人愿意清楚地告诉他们到底能省多少钱。

对经销商和安装商来说,后果更具体:返修率上升、调试时间超过报价、一旦出问题,安装商就被夹在电池供应商、逆变器供应商和配电柜厂家之间——而三方都认为问题不属于自己。

这个通病背后有个结构性原因:户用储能是作为商品卖出去的,却是作为系统交付的——电芯、变流器、配电接口、监控层,再加上安装。商品在展厅里被选中,系统在车库里被调试。而决定结果的大部分事情都发生在系统这一侧,恰恰是买家看得最少的地方。

本文说明户用储能项目真正依赖哪些条件,以及一体化方案在哪些环节改变了结果。

Read the detailed engineering discussion

我们最常看到的三种失败模式

接口问题

电池、逆变器和低压配电通常来自三家不同厂商。单看每一台都没问题,问题都出现在边界上:通讯协议不匹配、保护定值互相冲突、充放电限值缺乏协调。一旦暴露出来,每一家都能合理地质疑不是自己的问题。

容量匹配问题

储能容量常常按经验值拍定,而不是按家庭真实负荷曲线算。容量太小,每天都会撞到限值循环,衰减比预期快;容量太大,则永远达不到经济的放电深度。这两种情况在规格书上都看不出来。

售后问题

系统由多个部件拼装时,保修责任是割裂的。第十四个月出故障,意味着住户、安装商和三家供应商必须先就「谁的部件坏了」达成一致,然后才谈得上维修。

一体化方案改变了什么

单一责任主体

储能、变换与低压配电来自同一家供应商,一份保修,一个技术联系人。住户和安装商各自只需要打一个电话。

接口在设计阶段就定好

由于电池、变流器和配电级由同一个工程团队定义,通讯与保护配合在设计阶段就解决了,而不是留到现场。调试变成一张检查表,而不是一场谈判。

按负荷曲线定容

我们会索要 12 个月的用电数据,或先装监测,然后才推荐容量。目标不是「屋顶能装多大就装多大」,而是「能实现住户真正想要的结果的最小系统」。

如实告知预期收益

如果储能对某个家庭并非合适的投资——比如用电量低、电价是固定费率、或屋顶朝向限制了发电——我们会直说。一个本不该成交的项目,对声誉的损害大于它带来的利润。

典型配置

单相,5–10 kWh

公寓或小户型,配阳台光伏。壁挂式、单相,按晚间与夜间负荷转移来定容,而非追求完全独立。

三相,10–20 kWh

独立住宅,配屋顶光伏和电动汽车。三相接入、更高持续输出功率,并集成低压配电,使储能与主配电一起作为一个协调包交付。

在既有光伏系统上加装

适合已有组件但没有储能的家庭。这里的关键是逆变器兼容性——我们会在报价前(而不是报价后)索要既有逆变器型号与发电数据。

技术细读:决定这些数字能否成立的四个参数

决定循环寿命的是放电深度,而不是标称容量

一款在 80% 放电深度下标称数千次循环的电芯,在 100% 放电深度下实际循环次数会明显减少。这也是为什么我们报出的可用容量是一个设计决策而不是宣传数字,也是为什么备用下限由我们刻意设定,而不是交给逆变器里的算法去决定。

温度同时驱动日历老化与循环老化,而且两者叠加

持续工作在 35 度的电池包,即使吞吐量完全相同,老化速度也数倍于 20 度环境。因此安装位置是一个电气参数,而不是方便与否的问题。在推荐化学体系或容量之前,我们会先问设备装在哪里。

循环效率报出的是曲线上的最优点,而不是系统真实工作点

实际效率取决于部分负荷特性、待机功耗,以及系统有多少时间停留在低电量状态。我们公开效率曲线而不是单一峰值数字,因为峰值数字恰恰是运行中几乎遇不到的那个点。

备电切换时间必须与关键负载相匹配

一台服务器机柜、一台排水泵、一个供暖控制器,对供电中断的容忍度完全不同。与其宣称一个毫秒级的单一数字,我们先把关键负载摸清楚,再据以确定真正能保护它们的切换方案。

集成考量

保护配合

在表后加装储能会改变故障电流水平和保护要求。这必须在设计阶段评估,而不是在调试时才发现。

热环境

装在哪里和装什么同样重要。寒冷气候下装在无供暖车库里的设备,与装在通风设备间的表现完全不同——我们会在推荐配置前先问清楚安装位置。

并网规则

上网功率限制、防孤岛要求、备案义务各国不同且经常变化。我们会在方案定稿前确认目标市场的适用规则。

监测与数据

系统产生的数据应该是住户看得懂、安装商能据以行动的,而不是只有工程师才读得懂的仪表盘。

常见问题

没有光伏,储能还能用吗?
可以,但经济性差别很大。没有发电,储能只能把用电从高价时段挪到低价时段。这在峰谷价差大的动态电价下可能划算;在固定电价下通常不划算。
安装需要多久?
插电式或壁挂式配置,现场条件具备后通常半天。三相安装含配电作业,需预留一整天。我们会提供调试检查表,让安装商提前知道需要准备什么。
产品寿命到期后怎么办?
我们公开发布停产支持政策,明确最后一批出货后的备件供应与固件支持期限。这件事我们宁愿现在写清楚,而不是让合作伙伴日后自己发现。
支持哪些市场?
我们按市场逐一确认,依据是该市场适用的认证状态与并网规则。认证路线图发布在「质量与合规」页面,状态变化时会同步更新。
首页 / 太阳能方案 / 工商业储能系统

让现场的能源真正发挥作用。

围绕用电曲线、能源成本与关键负载,协同光伏发电与储能。

在哪些场景产生价值

三个常见起点。

由评估决定适用哪一种,以及储能到底是不是正确答案。

需量削峰

把负荷从计费峰值移开,把需量窗口控制在约定阈值以内。

电能质量与穿越

在定义的运行范围内,帮助电压敏感工艺穿越电压暂降与短时中断。

容量与扩容

在具备条件的受限节点增加储能,推迟或避免上游扩容。

围绕你的现场做方案

我们先评估,再定义配置。

把负荷数据、电价、电气结构与项目目标发给我们。我们会说明哪些可以直接报价、哪些需要现场评估。

01

评估

间隔负荷数据、电价、单线图、保护设置与项目目标。

02

设计

依据现场实际运行条件,确定系统容量、时长、保护配合与接口。

03

验证

只用已批准配置。参数与保护设置对照产品证据核对。

04

交付

供货范围表、安装责任、调试清单与支持。

围绕你的现场,做一份方案。

节省与韧性取决于配置、运行条件与约定的范围。我们先评估,再定义配置。

申请现场评估 →
收益测算取决于什么

提供有据可查的测算,而不是一个醒目的节省数字。

任何数字都附带输入与假设。

用电曲线

间隔数据与运行小时数,而不是一张月度账单。

电价结构

电量、需量与上网电价,包括分时区间。

发电量

当地辐照、朝向、倾角与遮挡。

衰减

评估期内的电芯衰减与系统可用率。

投资

设备、安装与并网范围。

运维

例行维护、更换与监控成本。

在签订合同、明确运行周期之前,不承诺任何节省数字。

按用途分档容量

只有按真实工况选型,省下来的钱才留得住。

容量区间取决于储能要承担的任务,而不是报价单。三种常见用途,以及我们在给出任何收益数字之前必须做的校核。

用途 容量范围 典型应用
削峰填谷 100 kWh – 1 MWh 需量高峰明显的制造与物流园区。柜式安装、低压接入,依据分时计量数据控制。
电能质量与备电 200 kWh – 2 MWh 一次电能质量事件就会让产线停摆的现场。储能承担需量管理,并提供电压跌落与短时中断穿越。
集装箱式储能 1 MWh 及以上 较大的工业现场与园区,通常中压接入、包含多个负荷中心。
收益背后的工程校核
  • 15 分钟需量窗口
  • 簇间均衡与环流
  • 冷却与环境、工况匹配
  • 变压器与保护的过载能力边界

冷却方式的选择包括温度均匀性、泵与冷却液的维护,以及本地服务能力。

典型配置
容量范围kWh 至 MWh 级(按项目)
柜体形式柜式 / 集装箱式
冷却方式风冷 / 液冷(按项目)
并网方式低压接入,可选中压
认证状态

详见我们公开的认证路线图 —— 包括仍在进行中的项目。

我们交付什么
  • 柜式或集装箱式电池系统
  • 变流器与能量管理系统
  • 低压成套与配电集成
  • 站点级监控与远程诊断
  • 调试与售后支持
面向客户

EPC 总包、系统集成商与工业终端用户。

深入解读

工商业储能项目为什么容易卡住

工商业储能的商业逻辑比户用储能更强——负荷更大、电价结构更复杂、收益更容易量化。但同时,它失败的路径也更多。

多数工商业项目失败,不是因为电池选错了,而是失败在专业之间的缝隙里:从未认真做过的电气校核、没人协调的保护定值、估算而非实测的负荷曲线,以及一次性把这三个问题全部暴露出来的调试环节。

这类项目的销售方式有一个共同套路:收益是按电价表——一份公开文件——建模的,而不是按现场实测的用电行为建模的,后者既不公开、也未必被采集过。基于电价表的模型总能算出一个漂亮的数字。这个数字能否经受真实负荷曲线的检验,是另一个问题,而且往往在设备下单之后才得到回答。

本文说明工商业项目的风险真正在哪里,以及一体化供货范围如何降低这些风险。

Read the detailed engineering discussion

工商业项目真正出问题的地方

负荷曲线靠估不靠测

峰值需量既决定系统价值,也决定其背后每一个部件的选型。当曲线来自电费单加估计时,得到的方案是在为一个不存在的现场做优化。我们在定容之前会索要分时计量数据。

保护配合被当作后话

在既有低压装置上加装储能会改变短路电流水平,可能需要调整上级保护。如果设计阶段没做分析,它会在调试时暴露出来——此时修复成本高,工期也已经耽误了。

范围边界不明确

成套设备谁供?EMS 谁配?并网申请谁签?在三四个供应商的项目里,每一条边界都可能变成责任被丢掉的地方。单一供货范围的项目里,没有地方可丢。

我们的做法

先做电气校核,再谈设备

我们从现场真实负荷曲线、短路水平和既有保护配置入手。设备清单跟着校核走,而不是反过来。

储能与配电同一供货范围

电池系统、变流器与低压成套来自同一家供应商、同一份保修。这消除了工商业项目最常见的边界失效。

接口文档化

涉及第三方设备时——既有变压器、发电机、楼宇管理系统——我们明确记录接口:协议、数据点、配置责任归属。

调试计划前置

调试检查表在设计阶段就编制,而不是到现场才写。检查表中发现的问题是工程问题;交付后才发现的问题就是索赔问题。

典型配置

削峰填谷,100 kWh 至 1 MWh

适用于需量高峰明显的制造与物流园区。柜式安装、低压接入,依据现场分时计量数据控制。

电能质量与备电,200 kWh 至 2 MWh

适用于电能质量事件会造成生产损失的现场。储能同时承担需量管理与电压跌落、短时中断的穿越支撑。

集装箱式,1 MWh 及以上

较大型工业现场与园区,通常为中压接入、多负荷中心。

技术细读:四件会悄悄毁掉工商业收益账的事

需量电费是按滚动时间窗口计量的,不是按瞬时峰值

15 分钟的需量窗口意味着控制器的目标是把整段窗口内的平均值压在阈值之下,而不是削掉最高的那根尖峰。按削瞬时尖峰来整定的系统,在降低需量电费上会不达标,而这个偏差在第一张电费单来之前一直看不见。

并联电池簇必须把均流设计进去

多个电池簇并联在同一直流母线上时,内阻或荷电状态的微小差异会产生环流,而环流不会体现在总功率数字上。簇级管理与逐簇限流是让整个阵列保持均衡的手段;没有它们,最弱的那一簇会决定整个系统的寿命。

液冷与风冷交换的是不同的问题,而不是解决同一个问题

风冷更简单、更便宜,但在炎热气候下难以让大电池包维持较小的温差。液冷能把电芯间温差控制得更紧,代价是水泵、冷却回路,以及一项需要培训现场人员掌握的维护内容。这个选择应该跟随工作制与环境条件,而不是价目表。

变流器的过载能力与变压器容量必须一起定

一台能带 110% 负载持续十秒的变流器,只有当上级变压器和保护能承受该电流而不跳闸时才有意义。两者分开采购时,过载数字常常由一方报出、又被另一方默默作废。

集成考量

并网与审批

多数市场的并网申请需要电气图纸、保护定值,有时还需电网研究。这是关键路径,应尽早启动。

既有保护配置

现场已设置选择性配合时,加装储能可能需要重新整定。我们会在提出方案前摸清既有配置。

消防安全与间距

柜体位置、防火间距、探测要求由当地规范以及系统化学体系与容量共同决定。我们会按你所在司法辖区确认要求,而不是想当然。

运维与监控

工商业系统需要现场人员可操作。我们明确哪些信息由现场人员查看和处理,哪些升级到我们这边。

常见问题

定容需要哪些数据?
至少 12 个月的分时计量数据、现场单线图、既有保护定值与并网协议。缺了这些,任何定容数字都只是估算,也应当被当作估算对待。
现场已有发电机组,还能加储能吗?
可以,但发电机组与储能的控制必须显式协调——否则在切换过程中两者会互相冲突。这是控制设计问题,我们在规格定义阶段就会处理。
性能如何衡量?
以现场自身计量数据形成的约定基线为基准,计算方法在调试前记录在案。如果基线没有事先约定,收益数字就无法验证。
跨国多站点怎么办?
我们按市场逐一确认认证状态与并网规则。公开的认证路线图列明已完成与仍在进行中的项目,便于你安排计划。
首页 / 解决方案 / 微网与离网供电

微网与离网供电

在电网薄弱、电价高昂或无电网的场景 —— 我们把储能、电力变换与配电整合为一个协同系统,整体交付,单一责任主体。

应用场所
偏远通信基站—
海岛与沿海社区—
农业与灌溉场景—
矿山与施工营地—
关键设施备电—
认证状态

构网能力:请与我们的工程团队确认具体需求。

我们交付什么
  • 电池储能系统
  • 电力变换,按需提供构网能力
  • 低压配电与保护
  • 能量管理与远程监控
  • 针对现场条件的方案设计
面向客户

通信运营商、项目开发商、EPC 总包,以及开展离网项目的机构。

深入解读

为电网到不了的现场做设计

离网与弱电网项目和储能行业的其他业务都不一样。通常没有电网可以兜底,没有第二次调试的机会,也不可能下周再派工程师到现场。系统要么在设计工况下正常工作,要么整个项目以高昂的代价公开失败。

这类项目还最容易充满乐观假设:负荷增长被低估、柴油消耗被少算、环境温度取自区域平均值而不是设备柜内实测值、燃料物流只规划第一年然后就忘了。

更棘手的是反馈周期很长。并网项目里,设计错误一个月内就会以不达标的电费单形式暴露出来。而在偏远现场,同样的错误可能要两年后才浮现,那时调试团队早已离场,维护团队手里只有交接时侥幸留下来的那点文档。

本文说明我们如何做离网方案设计,以及在哪些情况下我们会说不。

Read the detailed engineering discussion

离网项目失败在哪里

负荷假设描述的是一个没人去过的现场

离网负荷常常按模板估算——每户多少度、每个基站多少度。真实现场有季节波动、有新增负荷、有没人预料到的用电时段。我们在确定方案前坚持要有实测数据或一段监测试运行。

运维只按第一年建模

按投运当年设计的系统,到第四年就会不够用。负荷会增长、组件会衰减、电池会掉容量。方案必须考虑现场的发展轨迹,而不是它的初始状态。

没有明确的升级处置路径

很多偏远现场距离最近的有资质技术人员数百公里。如果方案假设一周内能到现场,那它就不是离网设计,而是放在偏远地区的并网设计。远程诊断与指导性本地处置必须从设计之初就内建。

我们的做法

先测量,后设计

我们倾向于先给现场装监测、采一段时间数据,再确定任何容量。确实无法监测时,我们按明确的余量设计,并把假设写在图纸上。

按第五年设计,按第一年投运

容量规划考虑预期负荷增长与衰减。增长不确定时,我们按模块化扩容设计,而不是一开始就超配。

单一范围,单一责任

储能、变换与配电来自同一家供应商。在偏远现场,两家供应商之间边界扯皮的成本是以月计的,不是以天计。

远程优先的服务模式

无需到场即可诊断、给本地人员清晰指引,并如实说明哪些问题能远程解决、哪些不能。

我们会拒绝支持不了的项目

如果物流、气候或服务距离让一个项目超出我们能负责的范围,我们在订单之前说,而不是之后。

典型配置

通信与偏远基础设施

中小型储能配光伏,目标是替代既定比例的柴油发电时长,而非完全替代。明确维护周期与远程监控是方案的一部分。

海岛与沿海社区系统

较大型系统,由储能构成电网主体。负荷管理、用户分批接入与明确的操作培训,与设备规格同等重要。

农业与生产性用电现场

支撑灌溉、加工或冷链的储能——停电会直接造成农产品损失或产量下降。工作制与季节波动是定容的主导因素。

技术细读:离网设计必须回答的四个控制问题

构网控制不是换了个标签的跟网

构网型变流器建立电压与频率,还必须提供保护方案所预期的故障电流;跟网型则是测量既有的参考并跟随它。在由储能构成电网主体的系统里,变流器必须合成一个刚性参考,并在大电机启动时保持稳定。下垂设置与虚拟惯量正是实现这一点的关键。

替代柴油是一个比例,不是一个开关

发电机仍在的系统里,有用的问题是储能能替代多少运行小时。发电机的小时数通常被低负载运行占据,而这个工况下机组效率低、磨损快。优先瞄准这部分小时数,能用一小部分储能容量拿到大部分节油效果。

荷电状态运行窗口是设计出来的,不是默认值

每天充满放空的系统撑不过服务协议期。为光伏吸纳预留上段、为意外负荷预留下段,能让电池保持在有利于寿命的区间内;代价是损失一些可用容量,而那些容量在实践中本来就靠不住。

黑启动是一项规格,不是一个假设

系统需要在完全停机后重新启动时,顺序必须写下来并测试:谁给谁送电、按什么顺序、带哪些负载。一个只能在天亮时成功的黑启动是一种受限能力,现场运维人员在依赖它之前应该知道这一点。

集成考量

是构网,不是跟网

当储能建立电压与频率基准时,控制策略与并网系统有本质区别。突加负荷、电机启动、多电源切换都必须分析。

多电源协调

柴油发电保留时,发电机与储能之间的切换正是多数故障发生的地方。这必须在受控条件下测试,而不是到现场才发现。

热与环境条件

热带直射阳光下,柜内温度可能远高于环境温度。基于区域气象平均值的方案会表现不佳。

备件与耗材

哪些部件应本地储备、哪些可以发货?这是设计决策,不是后话,而且会影响推荐配置。

操作人员能力

现场运维人员可能不是电气技术人员。系统的界面与文档必须匹配他们的真实能力,而不是我们希望他们有的能力。

常见问题

能做完全无柴油的方案吗?
通常可以——但这取决于负荷曲线、光照资源与可接受的可靠性水平。如果现场完全不能容忍停电,保留发电机作为后备往往是更诚实的工程答案,哪怕听起来没那么漂亮。
没有可靠数据的现场怎么办?
我们先给现场装监测、观察一段时间,再定稿方案。这会推迟项目,但我们宁愿一开始就说清楚,也不愿按假设设计、然后投运后才发现假设错了。
实际交期是多久?
这类项目的瓶颈很少是制造。物流、清关、现场准备与合格调试人员的到位时间,通常才是决定工期的因素。我们按真实的关键路径排计划。
维护怎么安排?
远程诊断优先,配套明确的升级路径与给本地人员的清晰指引。现场走访按计划安排,而非被动响应。我们公开说明哪些问题能远程解决、哪些不能。
首页 / 解决方案 / 中低压配电

中低压配电

与储能系统一体化设计的中低压配电与保护设备 —— 一个供应商、一个接口、一个责任主体。为那些受够了协调三家供应商才能交付一个站点的伙伴而做。

产品范围
低压成套开关与配电柜—
保护、计量与控制元件—
中压接口设备按项目定制
OEM 与项目定制配置—
认证状态

按目标市场的要求设计,例如 IEC 61439、GB 7251。

为什么要一体化
  • 更少的供应商、更少的接口问题
  • 工厂级协同储能与配电
  • 单一保修责任与单一技术联系人
  • 清晰的升级路径:从低压成套到基于 SST 的中压架构
面向客户

EPC 总包、成套厂、系统集成商与 OEM 合作伙伴。

深入解读

为什么应该把储能和配电交给同一家

多数项目里,储能与低压配电是分开采购的。这看似合理:两者都是专业产品,各有自己的合格供应商。问题要到后期才显现,而且总是出现在两个包之间的边界上。

电池系统的保护定值必须与配电屏的配合;通讯接口要两个工程团队达成一致;物理安装要塞进一个谁都不完全掌控的空间。当调试暴露出不匹配时,两家供应商都能合理地指出自己的设备符合规格。

有必要把比较的对象说清楚。问题不在于分开的供应商能否各自交付一个能用的产品——通常都可以。问题在于:他们之间那个接缝归谁管,以及在设备下单之前有没有落到纸面上。

本文不是说分开采购永远不对,而是说协调成本是真实存在的,应该被计入。

Read the detailed engineering discussion

协调成本,逐项拆开看

保护与选择性校核

加装储能会改变接入点的短路电流水平,必须有人按新工况复核上下级保护定值。涉及两家供应商时,这项校核常常被双方都认为该由对方做。

接口约定

协议、数据点、控制信号、配置责任,都必须在设计冻结前敲定。两家供应商之间的每一个接口,都是一份必须有人编写并维护的文件。

工期敞口

两条供应链意味着两个交期,晚的那个决定日期。也意味着有两次延误机会,去影响另一方的安装窗口。

保修与故障归因

边界处发生故障时,必须先由各方就归属达成一致,维修才能开始。单一供货范围的项目里,这一步根本不存在。

我们提供什么

储能与配电出自同一个工程团队

电池系统、变流器与低压成套一起定规格,保护配合与接口定义在一个团队内部完成,而不是跨两个组织。

接口文档作为交付物

涉及第三方设备时,我们出具接口文件,而不是留到现场去解决。

明确的升级路径

从今天的低压成套,到未来可用的、基于固态变压器的中压架构。合作伙伴应该能规划一条演进路线,而不只是一次采购。

诚实的范围边界

确实不该由我们供的部分——比如土建、或电网侧接入——我们明确说明,而不是含糊地兜下来。

典型配置

储能与低压成套一体化

储能柜与配套配电屏作为一个协调包交付,保护定值合并校核。

配电屏改造

在已有成套设备的现场加装储能。这里的工作量,了解既有装置不比新设备本身少。

中压接口

接入点在中压时,接口设备及其与低压侧的配合作为一套设计来定。

技术细读:藏在两个包接缝里的四项校核

短路电流是算出来的,不是估出来的

在接入点加装储能变流器会改变该母线的预期短路电流,进而改变既有保护是否仍具备正确选择性。按 IEC 60909 方法做的校核,在设计阶段是几小时的事;等到现场出现误跳闸再补做,就是几周的事。

温升与内部电弧是成套装置实测出来的属性

IEC 61439 规定了低压成套如何在额定电流下验证温升,以及发生内部电弧时成套应能承受什么。这些品质无法从所用元件之和推断出来;它们属于成套装置整体,这也是成套必须有一个责任主体的原因。

现代装置里中性线电流并不为零

LED 照明、变频驱动、开关电源等非线性负载注入的三次谐波电流在中性线上是叠加的,不会抵消。按平衡线性负载假设选定的中性线,在一栋负荷构成早已发生变化的楼里可能过热。

接入点决定了保护问题

储能接在主母线、接在分配电箱、还是接在某一馈线的负荷侧,产生的配合问题各不相同。接入位置应与保护配置一起确定,因为这两件事无法各自独立决定。

集成考量

既有装置评估

提出方案前,必须弄清既有单线图、保护定值与备用容量。忽略既有条件的方案,就是一个必然会在现场被改的方案。

形态与空间

储能与配电设备的物理位置会影响电缆走向、热管理和检修通道。这些是设计决策,不是安装细节。

标准与审批

适用标准因市场和电压等级而异。我们按你的目标市场确认要求,而不是套用默认值。

工序与责任

谁装什么、按什么顺序、每个阶段谁验收。单一范围下这是一份计划;多供应商下这是一场谈判。

常见问题

这是不是意味着不能用我们现有的成套厂?
完全不是。很多合作伙伴有想维持的既有关系。关键在于接口要有文档、协调要有明确的责任人。我们可以只供储能、只供配电、或两者都供——但我们会清楚说明自己覆盖了哪些边界、没覆盖哪些。
进入新市场时标准怎么处理?
我们按目标市场确认适用标准并体现在规格中。认证仍在进行中的,会在公开的认证路线图上注明,而不是暗示已经完成。
能配合我们指定的设备吗?
多数情况可以——只要接口能正确定义、协调责任清晰。如果某个组合会产生我们无法管控的风险,我们会提前说明。
电网接入怎么办?
并网申请通常是客户或项目开发方的责任,但我们提供支持申请所需的技术文件。需要做电网研究时,这是关键路径项,应尽早启动。
首页 / 解决方案 / 数据中心与关键电源

面向下一代数据中心的集成供电。

围绕关键负载需求,协同变换、储能、配电与控制 —— 从电网接入到关键负载。

讨论你的供电架构 →
Reference architecture

From the grid interface to the critical load.

Define the power path as one system. Conversion, storage, distribution and controls are specified against the same operating envelope — not assembled from separate packages.

01 · GRID INTERFACE Grid interface MV connection Available now
02 · CONVERSION Conversion SST option / isolation Available
03 · DISTRIBUTION Distribution DC bus + protection Project-specific
04 · CRITICAL LOAD Critical load Downstream interfaces Project-specific
Storage + DC/DC Energy buffering connected at the defined conversion stage. Available now
Controls + monitoring across the defined system scope

Illustrative architecture. The actual configuration depends on voltage class, isolation requirements and the target market’s certification path. Scope boundaries — LumiVolt supply, partner supply and third-party interfaces — are defined in the project documentation.

800 VDC and AI workloads

Planning for 800 VDC? Start with the system architecture.

800 VDC is an option, subject to interface, grounding and protection assessment. Evaluate conversion, energy buffering and controls against your load requirements before the bus voltage is fixed.

Concept Development Validated

Each project states which stage applies to which function — conversion, buffering, protection and recovery. No function is presented as validated before the test evidence exists.

Operating requirement What we discuss Status
Load transients Step size, repetition and recovery time against the conversion stage. Project-specific
Ride-through Duration, depth and the loads held up during a supply disturbance. Project-specific
Backup duration Critical load list, autonomy target and the transition between sources. Available now
Recovery sequence Restart order, source hand-back and who authorises each stage. Project-specific
为什么架构重要

瓶颈在变换环节,不在发电。

传统供电链路要经过工频变压器、AC/DC、DC/AC 和配电柜 —— 每一级都有损耗、占用空间,也有各自的故障模式。SST 用一级可控的电力电子变换替代了其中大部分环节。

体积更小、重量更轻

没有工频变压器铁芯,也没有油箱。在占地面积与楼板承重是真正约束的场景尤其有价值。

精确控制

电压、频率与功率潮流由电子方式控制 —— 不再被变压器的变比锁死。

天然双向

无需额外变换级即可双向流动 —— 对储能接入与 V2G 类应用尤其重要。

集成低压配电

低压输出级属于同一台设备 —— 一个柜体,替代变压器加若干配电柜。

原生直流接口

SST 输出端的直流环节适配储能、快充,以及越来越多采用直流供电的 IT 负载。

电网友好功能

无功补偿、电压调节,以及在合适配置下提供构网能力。

先变的是负载

单柜功率六年从 8 kW 走到 1 MW。

上游配电没有为这个变化重新设计过。现在限制一栋楼能装多少算力的,是供电链路本身。

年份 GPU 代次 单机柜功率 单柜功率
2024 Blackwell 约 130–250 kW 约 40–100 kW
2025 Blackwell Ultra 约 250–500 kW 约 100–350 kW
2028 Rubin Ultra 约 900–1000+ kW 约 350–500 kW

区间覆盖风冷与液冷配置。源路线图中机柜与柜体是分开统计的 —— 设计定稿前请与厂商确认两者的定义。这些是客户正在对标的路线图,不是我们的预测。

150×2024→2029 机柜功率增长
800 VDC正在被写入规格的直流配电电压
1 MW+供电链路允许时的单机柜功率
6 years从单柜 8 kW 走到 1 MW
老方案为什么失效

密度到兆瓦级,四件事同时崩塌。

每一件在 100 kW 都有变通办法,到 1 MW 就一个都不剩了。

01

机房面积被吃掉

单个机柜 8 kW 时,配套电力设备占半平方米。到 500 kW,配电间的增速超过机房本身 —— 楼变成了一个装了服务器的变电站。

02

铜的用量失控

低压配电做到每柜 800 A,母线要用吨来算。光铜就可能比它供的电还重,而且都要承重、散热、买单。

03

变换级数层层叠加

中压变压器、低压开关柜、UPS、电源模块 —— 每多一级就损失 1–2 个点的效率,再吃掉一个柜的位置。到 10 MW,就是几百 kW 没人算过的热量。

04

负荷不再可预测

AI 训练负荷在毫秒级上从空载跳到满载。按平滑商业负荷设计的电网接入,会把这当成故障,而不是当成用电需求。

提高配电电压,是唯一能同时消掉铜、面积和变换级数的做法。

适用场景

围绕 SST 我们能服务的应用。

AI 与超大规模数据中心

高密度机柜需要高密度供电。SST 缩短变换链路,降低每兆瓦的电气占用面积。

电动汽车充电枢纽

中压直接接入,集成直流输出 —— 电网到车辆之间的变换级数更少。

关键设施与工业场景

电能质量、冗余能力与占用空间需要同时满足的场景。

⚠

商用记录与开发状态 —— 如实说明

我们的 SST 平台既不是样机,也还不是批量产品。两个等级可报价:13.8 kV / 3.5 MW(Rev. A7)与 10 kV / 2.5 MW。三台 10 kV / 2.42 MVA / 800 VDC 机组自 2023 年 9 月起在一座数据中心园区运行,四台 13.8 kV 机组正随 2026 年出口订单交付,另有 750 V 系列在园区并网。认证仍在推进,质量页会写明哪些标准尚未完成。如果你的项目现在就需要已做型式试验的机型,请告诉我们,我们会在出方案前说明是否合适。

查看 SST 产品详情 → 洽谈项目
深入解读

数据中心的供电架构为什么正在改变

数据中心供电设计几十年来一直很稳定:中压进线、工频变压器降压、不间断电源调理、再以低压分配到机柜。这套架构行得通,是因为它服务的负荷可预测,约束条件是每兆瓦成本。

情况已经不同了。机柜密度提升了一个数量级;负荷越来越多是直流原生;现场受制于可用建筑面积与电网接入容量,而不是能源供给;电气基础设施现在占每兆瓦 IT 容量成本的相当比例。

推动这一变化的是负荷侧,而不是电源侧。只要负荷还是交流且可预测,传统链路对一个已经解决的问题而言就是够用的答案。一旦负荷变得高密度且直流原生,这条链路就不再是回答该问题最经济的方式,替代架构才开始值得投入工程精力。

本文说明传统链路为什么正在成为约束,以及固态变压器架构在哪些环节改变了账算。

Read the detailed engineering discussion

传统链路卡在哪

占地

工频变压器是体积大、重量重、充油的设备。在给定兆瓦容量下,它占用的空间本可以放 IT 设备——而在高密度设施里,建筑面积才是稀缺资源。

变换级数

电力经过 AC/DC 和 DC/AC 各级,每一级都有损耗。在数据中心规模下,效率的小幅改善会在设施全生命周期中累积成可观的运营成本。

控制颗粒度

变压器输出电压由变比固定,无法动态调节电压、无法控制功率流向、也无法在无额外设备的情况下提供无功支撑。

直流原生负荷

机柜、储能与快充越来越原生工作在直流。传统链路把交流变直流再变回来,而一条直流母线本可以省掉这些变换。

SST 架构改变了什么

更少级数、更少柜体

固态变压器用更少、更小、电子可控的级数,替代了工频变压器、独立功率变换级与低压配电级。

主动控制

电压、频率与功率潮流由电子方式控制,而不是由物理结构决定。这使得原本需要独立设备才能实现的功能成为可能。

默认双向

无需额外变换器即可双向流动,这对储能接入以及既用电又上网的场景都很重要。

在有用的地方提供直流接口

储能、快充与直流供电的 IT 负载可以接入输出级的直流环节,避免两侧各做一次变换。

状态,如实说明

两个等级已发布、可报价,而且已有在运机组 —— 三台 10 kV 等级 AIDC 机组自 2023 年起运行,另有四台出口订单在交付中。认证尚未完成,我们逐项公开,而不是让你自己去发现。除产品之外,我们还提供架构评审、参考设计,以及针对仍缺证据部分的联合验证计划。

适用场景

AI 与高密度算力设施

机柜密度是核心约束、每兆瓦电气占位直接决定楼内能放多少算力的场景。

电动汽车充电枢纽

直接中压接入、总充电需求高的站点。减少变换级可同时改善效率与设备数量。

具备直流基础设施的关键设施

已经运行直流母线基础设施、再走交流变换链路属于可避免低效的现场。

技术细读:定义一套 SST 设计的四个参数

拓扑的本质是一串变换,而级数就是关键

典型的固态变压器先把中压交流整流到直流环节,经隔离型中频变压器传输,然后要么逆变为工频交流,要么直接输出直流。每一级都可以基于碳化硅器件构建,从而允许更高的开关频率,进而让隔离变压器体积大幅缩小。

频率替代了铁芯

变压器铁芯的体积大致与其工作频率成反比。把链路频率从 50 Hz 提高到几十 kHz,正是让原本占满一个房间的变压器能装进一台柜体的原因——在计算任何控制收益之前,这个体积变化本身就是这套架构的全部理由。

穿越能力是设计参数,不是固有属性

由于直流环节储存能量,固态变压器能在一段确定的时长内维持输出以穿过供电扰动。能撑多久由母线电容与负载决定,必须在规格里写成一个具体数字,而不是笼统地当成一种保证。

冗余必须是架构层面的

用一台有源设备替代多台无源设备会集中失效模式。如果设施要求 N+1,冗余必须由并联单元或从一开始就设计进去的旁路通道来提供,无法事后作为选件补上。可靠性要在系统层面论证,而不是在器件层面。

集成考量

控制与保护理念

电力电子变换在故障工况下的行为与电磁式变压完全不同。保护策略与穿越行为必须刻意设计,不能沿用传统做法。

可靠性与冗余

用一台设备替代多台时,必须在系统层面评估其失效模式。需要冗余的地方,架构必须显式提供。

认证路径

中压电力电子设备的认证路径与传统成套设备不同,会影响时间表,应尽早规划。

更高密度下的热管理

去掉变压器减小了占地,但把损耗集中在更小的体积里。冷却设计变得更关键,而不是更简单。

常见问题

SST 真的已经落地投运了吗?
有。三台 10 kV / 2.42 MVA / 800 VDC 机组自 2023 年 9 月起在一座数据中心园区运行;四台 13.8 kV 机组于 2026 年被海外 AI 算力园区订购,目前正在交付。没有完成的是认证:IEC 62477-1 的型式试验与目标市场准入仍在推进,质量页逐项列出。已商用投运和已做型式试验是两句话,我们分开说。
那今天能和你们做什么?
储能与配电需求,我们现在就可以报价供货。SST 方面,两个等级可报价,其中一个已在运行 —— 部署案例与型式试验记录可在保密协议下提供,市场准入哪些还没拿到,我们也会直说。我们不会做的,是在认证完成之前把一个配置说成已认证。
怎么判断 SST 是否适合我的现场?
通常的判断标准是:传统链路是否真的构成约束。如果建筑面积、变换损耗或控制颗粒度确实是约束,就值得评估这套架构。如果都不是,传统方案在经济上可能更优——我们也会直说。
预计需要哪些认证?
中压电力电子变换设备适用 IEC 62477、IEC 61800 系列等标准,同时需满足目标市场的并网要求。我们的认证路线图页面列明当前状态,并会随进展更新。
首页 / 产品中心

产品中心

以下每款产品均提供完整规格、认证状态与可下载的规格书。如果需要目录之外的产品,直接问我们 —— 定制配置是我们的常规业务。

电池模组与电池包

磷酸铁锂模组与电池包,集成 BMS,适用于户用与工商业系统。

电池管理系统 BMS

电芯监测、均衡、保护与通讯。

变流器与混合逆变器

双向电力变换,适用于并网与离网场景。

储能一体柜

电池、变换、热管理与保护集成于同一柜体。

低压成套与配电设备

配电、保护与计量设备。

★ 新品

SST — 固态变压器

中压电力变换,把传统变压器、变流器与低压配电链路整合为一台可控设备 —— 需满足隔离、保护与接口要求。

Product documentation

The right configuration starts with clear specifications.

Every product page follows the same seven sections, in the same order. If a figure is not approved for your market, the page says so instead of leaving a gap you have to interpret.

ApplicationWhich applications and configurations the model is intended for.
RatingsUsable capacity, continuous power, voltage range and phase — approved figures only.
InterfacesElectrical, communication and mechanical interfaces, with the partner-side requirement stated.
EnvironmentInstallation location, ambient temperature range, IP rating and cooling.
AvailabilityWhich markets it is released in, lead time basis and order conditions.
CertificationStatus against every applicable standard, linked to the evidence register — including what is outstanding.
DownloadsDatasheet, installation manual, declaration documents — each with a revision date.
Home / Products / SST

Solid-State Transformer

A medium-voltage to DC conversion platform for AI data centres, EV charging, renewable integration and smart grids. Medium-voltage AC in, 800 VDC out, through one controllable power interface.

Discuss an SST project →
Product family

四个功率等级,两个已发布 —— 其中一个从 2023 年就在运行。

Ratings are released separately. A released rating means the design is frozen at the stated revision and can be quoted for a project — it does not by itself imply certification, which is tracked separately on the Quality page.

Available

13.8 kV · 3.5 MW

Rev. A7 product, 800 VDC output. The rating with a full published parameter set.

在运

10 kV · 2.5 MW

本等级首次落地:三台 10 kV / 2.42 MVA / 800 VDC 的 AIDC 机组,自 2023 年 9 月投运,至今仍在运行。

Planned

10 kV · 1 MW

Planned for a future release. Parameters are not frozen and are not quoted.

Planned · Jul 2027

34.5 / 35 kV · 10 MW

Planned timing, subject to product plan. Not a contractual delivery commitment.

商用记录

不是实验室样机。既有在运机组,也有在建订单。

我方产品线背后的 SST 平台自 2017 年起已走过数代现场应用。对今天评估它的买家来说,有三个落地最关键:数台已连续运行数年的机组、一笔正在交付的出口订单,和一次证明直流输出等级在机房之外同样成立的并网。

2023 · 数据中心

3 × 10 kV / 2.42 MVA / 800 VDC

三台商用 AIDC 机组,2023 年 9 月在一座数据中心园区投运,此后持续运行。据我们所知,这属于 AI 数据中心里最早的一批商用固态变压器投运,并且至今仍在运行。

2026 · 出口订单

4 × 13.8 kV / 800 VDC

2026 年,一家海外 AI 算力开发方为其自有园区订购四台 13.8 kV 机组。这是该平台的首笔出口订单,目前正在生产与交付中。

园区并网

10 kV / 2 MVA / 750 V

另有 750 V 系列,在一座光储充一体化园区并网运行。它不是 AI 数据中心项目,我们如实列示:这证明同一套变换平台在机房之外同样可以并网运行。

2023首批商用 AIDC 机组投运
2.42 MVA在运最大单机容量
4 units2026 年出口订单,交付中
750–800 V已投运验证的直流输出等级

这份记录意味着什么,不意味着什么

这些是真实机组、真实订单和真实供应链,不是实验室样机。但它也不是批量生产。平台处于示范与小批量商用阶段:单台成本仍然偏高,云厂商尚未把它纳入批量采购,产业化仍在早期。这句话我们宁愿现在自己说,而不是让客户以后才发现。

责任归属

四种状态分开写。一家公司对全部负责。

可报价、已投运、交付中、已做型式试验是四件不同的事,而供应商常常有意把水搅浑。下面逐项说明,以及本平台真正处在哪一步。

状态 含义 本平台所处位置
可报价 设计冻结在标注的修订版。可以报价、签约、交付。 13.8 kV / 3.5 MW(Rev. A7)· 10 kV / 2.5 MW
已投运 在客户现场带电并带负荷运行。 自 2023 年 9 月起 3 台在运 —— 10 kV 等级,数据中心
交付中 已下单、在生产、准备发往现场。 四台 13.8 kV 机组,2026 年出口订单
已型式试验 按目标市场适用标准取得的第三方证书。 尚未 —— IEC 62477-1 仍在推进

一个配置可以既已报价、已投运,又尚未做型式试验。我们不会让第二件事盖住第三件事 —— 质量页逐项跟踪认证状态,并列明每项现有证据。

我方负责什么

一份合同、一份保修、一位具名工程师。应用研究、单线图与保护定值。市场准入文件、调试、远程诊断,以及本地备件。接口上出了问题,只需要打一个电话。

我们依托的平台提供什么

2017 年以来的生产历史。中压制造与试验设施。SiC 器件与高频磁件。在数据中心与园区的多代现场应用。型式试验记录可对合格买家在保密协议下提供。

平台能力与某一具体配置的认证状态是两份不同的证据,我们也是这样对待它们的。

用在哪里

四个应用场景,一个电能接口。

同一条变换链路,四种配法。变的是端口数量和控制方式。

AI 数据中心

10–35 kV 进 · 800 VDC 出

机柜级或列级配电。省掉低压开关柜与 UPS,直流母线直接给机柜供电。

充电枢纽

10–35 kV 进 · 800–1000 VDC 出

兆瓦级充电不需要单独的变电站建筑。V2G 与光储在同一根直流母线上集成。

新能源并网

光伏与储能共用直流母线

大型光伏与储能在中压侧通过一级变换接入,而不是两级。

电网接口

构网与穿越能力

中压交流与直流网络之间可控、双向的接口 —— 包含弱电网与微电网运行。

SST cabinet — light grey enclosure with dark doors and panel
Unified design language: light grey cabinets, dark grey doors, blue accent line. Marketing concept only — final appearance is subject to approved drawings.
Electrical architecture

Cascaded AFE, isolated high-frequency DC/DC, parallel DC output.

Medium-voltage AC is actively rectified in a cascaded arrangement, buffered per module, then isolated and converted at high frequency before the parallel low-voltage output stage. Control targets are regulated input current, stable output voltage, module voltage balance, and coordinated protection and bypass.

← Swipe to see the full diagram
13.8 kV AC Three-phase, 50/60 Hz MV input Cascaded AFE Active rectification Power factor and current control Module DC link Segmented buffering Condition monitoring DAB + HF transformer Isolated high-frequency DC/DC Galvanic isolation and ratio 800 VDC · 4375 A Low-voltage rectification Parallel output Rated operating point (Rev. A7) Core control variables Input current · power factor · module voltage balance · output voltage · protection and bypass

Simplified for clarity, based on the Rev. A7 block diagram. Topology, switching frequency and control parameters depend on the project and the product revision.

Main electrical parameters

13.8 kV / 3.5 MW, Rev. A7

Rated power / voltage / current3.5 MW / 800 V / 4375 A
Steady-state accuracy / transient deviation±1% / ±5%
Voltage regulationRipple ≤0.5% / static ≤1% / dynamic ≤3%
Phases / frequency / input voltageThree-phase / 50–60 Hz (±3 Hz) / 13.8 kV
Permissible voltage variation−10% ~ +10%
Peak efficiency / THDi / power factor98.5% 峰值 / 50% 负载以上 <3% / >0.98
Output overload105% continuous / 110% 60 min / 125% 10 min / 150% 0.2 s
Short-circuit fault clearing150% / 180 ms
Insulation level (BIL)>95 kV
Partial discharge<10 pC
Ambient temperature−30 °C to +50 °C
Altitude≤2000 m
Cooling / ingress protectionAir cooled / IP20 (main unit)
Container ratingNEMA 3R / C5
CommunicationRS485 / Ethernet · Modbus RTU/TCP · IEC 104 · IEC 61850

以上为标称值。98.5% 为峰值效率。部分负荷下效率更低;收益测算应采用所供机组效率曲线上对应实际工作点的数值,而不是这个峰值。谐波、过载与故障穿越需在约定条件下实测,且故障穿越需与储能系统协同。未列出的参数不应假定已满足。

Protection and monitoring
Protection functions Overcurrent · overvoltage · undervoltage · short circuit · overtemperature
Surge protection Both AC input and DC output
Operating mode Voltage source mode
Monitoring Voltage, current, module faults, bus voltage
Certification status
IEC 62477-1 进行中
IEC 61800 series Not started
Target-market approval Not started

A released rating can be quoted before certification is complete. Where a project requires a certified unit, we say so in the proposal rather than afterwards.

Modular configuration

Built from modules, with one spare in every string.

Each phase is a chain of nine two-in-one modules, each containing two identical submodules — 18 submodules per phase, one of them redundant. Per-phase cascading is what lets a single failed module be bypassed instead of taking the unit offline.

17 + 1 per phase

18 submodules per phase including one redundant module. Redundancy is a module count, not a claim about availability — actual availability depends on the redundancy strategy in your design.

Two-in-one modules

Nine two-in-one modules per phase, each containing two identical submodules. Fewer connectors and a shorter power path than discrete modules.

Online bypass

The design aims to reduce the effect of a module fault on delivery. Bypass conditions, derating and protection logic must be validated per project.

SST cabinet — dark grey enclosure variant
Dark door variant of the same enclosure family. Appearance is subject to approved drawings.
Formats and dimensions
Indoor core cabinet4700 × 1450 × 2300 mm · approx. 6 t · IP20
20-foot container solution6058 × 2438 × 2591 mm · NEMA 3R / C5
Container contentsSST, fire protection, HVAC cooling
Derating above 40 °C−0.5 MW per further 5 °C

Final enclosure, weight, lifting points and interfaces follow approved customer drawings.

AIDC system application

The SST is one layer, not the whole answer.

In an AI data centre the SST handles primary conversion, while storage, static var generation, high-voltage drives and an EMS coordinate around it. Each function sits in its own layer with its own protection boundary.

SST — primary conversion

MV AC to 800 VDC, with voltage regulation, power factor control and modular protection.

Energy storage PCS / BESS

Dynamic buffering and backup support. Capacity and connection point configured per project — and required for fault ride-through.

SVG — power quality

Campus-level reactive power and voltage support at the point of common coupling.

Drives + EMS

Energy efficiency for chiller pumps and fans, plus unified monitoring and energy dispatch.

Solution boundary: this layered view is a concept, not a standard scope of supply. Protection zones, the 2N strategy, storage connection points and emergency power logic require joint design with the customer.

Deployment models

Three ways to place an SST in a live facility.

The choice follows your POD design, redundancy strategy and retrofit scope — not a vendor preference. These are discussion models; the final architecture depends on your reliability target and site conditions.

01 · Distributed PODs

One SST per POD

Dedicated conversion close to the load. Smaller fault domain, and capacity can be added POD by POD as phases come online.

02 · High-density campus

Several SSTs, one DC bus

Multiple units feed a centralised DC bus. Requires parallel operation, coordinated protection and an availability design that is agreed up front.

03 · Existing 2N retrofit

Keep one path conventional

Retain one side of the existing 2N pair and add SST on the other. Limits the risk of a one-time retrofit while the new path proves itself.

充电枢纽

中压直接充电,中间不需要变电站。

SST 直接吃 10–35 kV,输出可调直流。工频变压器和它那栋房子从图纸上消失。

1–2.5 MW单台 SST 充电功率
60%+相比低压架构的占地减少
800–1000 V直流输出电压
1,500 A最大输出电流

中压直连

10 kV 或 35 kV 进,可调高压直流出。不需要降压变压器,不需要单独的低压间。

天生双向

V2G 是一种控制模式,不是多加的硬件。高峰时段能量可以直接回送电网。

光伏与储能在直流侧接入

光伏和电池接在同一组直流端口上,整个站是一个能源枢纽,而不是三套系统三个表。

兆瓦级充电典型配置。实际功率、电压与端口数按站点确定。

平台历程

一个平台,从 2017 年起就在现场。

我们供货的 SST 不是新设计。它已经走过几代现场应用,每一代都在稳定交付。

2017

首台中压 SST
国家级科研项目样机,±10 kV / ±375 V / 1 MW

2019

直流变压器
±10 kV/±375 V/2 MW 示范电网

2022

多端口路由器
3 MW IGCT 直流变压器,园区投运

2023

数据中心 SST
3 × 10 kV / 2.42 MVA / 800 VDC,2023 年 9 月投运

2025

SiC 代际
10 kV SiC 器件,开关频率提升

2026

800 VDC 平台
面向 AI 数据中心的兆瓦级柜体 · 首笔出口订单:四台 13.8 kV 机组,交付中

怎么读这张表
  • 每一条都是我方 SST 背后平台的研发与投运历程。
  • Our own engineering, warranty, commissioning and service sit in front of that platform; the record above is why we can stand behind it.
  • 部署案例与型式试验记录可对合格项目在保密协议下提供。
  • 今天能报哪些等级,本页上文已逐个修订版列明。
系统配置

这些部件怎么连。

三种参考配置。每一种都是系统研究的起点,不是目录上的标准品。

AIDC

数据中心

中压电网 10–35 kV
↓
SST 柜
↓
DC 800 V 母线
↓
机柜供电 + BBU
光伏 + 储能

新能源电站

光伏阵列 1.5 kV DC
↓
SST / 直流汇集
↓
中压电网 10–35 kV
↓
储能在直流侧接入
充电枢纽

充电 + 光伏 + 储能

中压电网 10–35 kV
↓
SST 多端口
↓
充电机 800–1000 VDC
↓
光伏与储能在直流端口

端口数、电压等级与保护定值由系统研究确定。研究没做完之前,我们不报组合配置。

Evidence chain

Six steps from design target to operating data.

A new platform closes reliability risk step by step. We publish which step each item has reached, so you can see where a claim is backed by a test report and where it is still a design target.

01

Design & failure analysis

Failure modes identified at design level, before hardware exists.

02

Component / module testing

Critical components and the module itself validated on the bench.

03

System-level testing

Full converter behaviour: control, protection, thermal path and bypass.

04

Third-party validation

Type testing against the standard that applies to the target market.

05

Demonstration data

Operating record from a live site, over a defined period and load profile.

06

Failure closure & consistency

Field failures closed out, and production consistency demonstrated across units.

Before deployment
  • Voltage and short-circuit capacity at the point of connection
  • Load profile, including the transient envelope
  • POD and redundancy strategy
  • Storage interface and control coordination
  • Communication points and protocol list
  • Environmental and fire protection requirements
  • Certification path and acceptance criteria
How we engage
  • Feasibility discussion — whether the architecture suits your site
  • Reference design — system configuration, interfaces and protection zones
  • Joint validation plan — agreed milestones where evidence is still missing
  • Or an honest "not yet" — if the timing does not work, we say so

关于这款产品真实状态,说明一下

两个等级已发布、可报价,平台也有在运机组和一笔在交付的出口订单。它还没有的,是型式试验证书,以及在云厂商批量采购清单上的位置。这两句话我们宁愿写在同一段里,而不是让你先看到前一句、之后才发现后一句。如果你的项目本季度就需要一台已做型式试验的 SST,我们会直说还没到那一步。

首页 / 质量与合规

质量与合规

我们公开认证状态、测试能力与供应链做法。尚未取得的认证我们照实说 —— 并告知预计完成时间。

我们认为,新供应商应该用"能证明什么"来评判,而不是"声称什么"。

认证路线图

认证路线图

下表列出与我们产品相关的全部标准、当前状态与预计完成时间。有变化我们会同步更新。

← 左右滑动查看完整表格

台账最近一次复核:2026年11月11日。每行在对应证据签发后补充修订日期。

标准 说明 适用型号 / 范围 目标市场 状态 已有证据 修订
IEC 62619 工业锂电池安全要求 储能 欧盟 · 英国 · 澳洲 进行中 尚未取得证书 —— 测试报告待出 —
UN 38.3 锂电池运输测试 储能 全部出口市场 待启动 暂无测试概要 —
IEC 62477-1 电力电子变换设备安全 变流器 · SST 欧盟 · 英国 进行中 尚未取证 —— 13.8 kV / 3.5 MW 与 10 kV / 2.5 MW 的型式试验进行中 —
IEC 61439 低压成套开关设备 低压成套 欧盟 · 英国 · 中东 按标准设计 尚未取证 —— 成套设备按 IEC 61439 / GB 7251 设计;验证按项目进行 —
CE Marking 欧盟符合性 全线产品 欧盟 · 欧洲经济区 待启动 尚未出具符合性声明 —
ISO 9001 质量管理体系 公司 全公司 待启动 尚未取得证书 —
已认证  已获证书。编号与扫描件可在下载中心或按需索取。 进行中  已在具名第三方实验室进行测试或申报中。 计划中  已排期,并注明目标季度。 待启动  尚未排期。目标市场需求确认后,我们会公布时间。

文件一经签发即在此公布。在证书尚不存在时,表内会明确写明,而不是留空 —— 留空是供应商暗示自己有认证的最常见做法。如需索取特定型号与市场对应的可用文件,请联系我们。

测试与验证

我们按照客户真实运行的条件来验证产品 —— 而不只是挑容易通过的工况。

  • 自有测试能力 —— 按产品线配置测试设备
  • 第三方实验室 —— 按认证项目选择具名实验室
  • 验证项目 —— 循环寿命、容量保持率、热行为、EMC、绝缘强度、保护与故障隔离

质量管理

来料、过程、出货各阶段均设质量控制,并保留记录,任何一台设备都能追溯到其元器件批次。

ISO 9001待启动
现场故障率目标按客户要求设定
出货合格率逐台出厂检验
记录保存年限按客户与法规要求

供应与保修

合作伙伴需要围绕我们做计划。这一页写明我们能承诺什么,方便你准确排期。

月产能按已确认订单排产
采购策略关键器件在可行范围内双供应商
标准交期按订单确认
保修按产品与项目约定
停产支持政策每条产品线均提供备件与固件支持,具体年限按产品约定。

如果某条产品线停产,我们承诺在最后一批出货后,按产品约定的期限继续提供备件与固件支持。这件事我们宁愿现在就写清楚,而不是让合作伙伴日后被动。

Reference projects

How a project is documented — and what we can share today.

我们目前还没有具名客户案例。我方 SST 产品线背后的平台确实有在运机组,也有一笔在交付的出口订单 —— 这些写在 SST 页面上,但不出现客户名称。与其用图库照片和匿名 logo 填满这一页,我们选择说明每个项目文件遵循的结构;一旦客户同意具名,我们就会在这里发布有据可查的案例。

01Requirement

The load, the site and the constraint that makes the project worth doing.

02Scope

What LumiVolt supplies, what the partner supplies, and where the interface sits.

03Architecture

The power path, drawn against the operating envelope rather than a catalogue.

04Validation

Which items are type-tested, which are project-specific, and what evidence exists.

05Result

Measured against an agreed baseline, with the calculation method documented first.

Diagrams on this site are illustrative architectures, not photographs of commissioned installations. Any figure in a proposal states its conditions.

项目如何形成证据

这是示意路径,不是客户案例。

只有在获得客户许可、并附上实测结果时,我们才会发布案例。

需求 → 范围 → 架构 → 验证 → 实测结果

这里不出现客户名称、现场或结果。这条路径说明一个案例需要包含哪些证据。

首页 / 关于我们

关于我们

曜驰能源成立于 2026 年。我们做储能、配电与电力电子 —— 并且把它们造成一个协同工作的系统。

我们的故事

We are an export-first company. Commercial coordination runs from our Singapore office, which puts us in the same time zone as most of our buyers and one working day closer to them than a mainland-only setup would be. Engineering, testing and manufacturing sit with our own team, so the people who answer your first question are the people accountable at shipment.

我们是一家年轻的公司,这一点我们不回避。合作伙伴迟早会知道,与其如此,不如让大家用"我们能做什么"来评判,而不是"我们做了多久"。

我们带来的不是历史,而是一支专注的团队、清晰的产品方向,以及把真实进度讲清楚的意愿 —— 包括还没做完的部分。

我们服务的,是那些更看重响应速度与坦率答案、而不是公司规模的国际合作伙伴。如果这符合你的做事方式,我们应该聊聊。

团队与能力

创始团队在本产品所需的关键领域具备实践经验,覆盖:

  • 电池系统与 BMS 开发
  • 电力电子与变换技术
  • 中压电力变换与 SST 架构
  • 中低压配电技术
  • 国际项目交付与出口业务
  • 质量管理与产品认证

我们的核心职能划分为:研发 · 质量 · 供应链 · 出口销售。工程决策由工程师做,技术问题直接到工程师手上。

使命与愿景

我们的使命,是让能源系统更容易被采用、集成与运维 —— 从光伏建筑到关键数字基础设施。

我们的愿景,是让清洁能源与关键基础设施,通过高效、可适应变化的电力系统连接起来。

简化

集成

验证

性能

共建

伙伴关系

支持

长期运行

How We Build

From requirement to shipment, in five stages

This is the sequence every project follows. It is short on purpose — each stage has one owner and one output, and nothing moves forward until the previous stage is signed off.

01

Requirement

Target market, applicable standard, operating envelope, and delivery boundary are agreed before design starts.

02

Architecture

Electrical topology, thermal path, and control strategy are decided together, not one after another.

03

Prototype

Critical components are validated first, then the prototype is assembled — so defects surface in the lab, not in the field.

04

Validation

Bench testing first, then type testing at an accredited laboratory against the standard that applies to your market.

05

Delivery

Production is scheduled against confirmed orders, and every shipment leaves with its documentation, labelling, and technical handover.

3Product lines on one engineering platform
1 day询价确认,按工作日计
IEC · GBDesign basis, applied per target market
2×Sourcing on critical components where viable
发展历程
2026.09

曜驰能源成立

2026.10

官网上线,出口渠道开启

这份清单会继续增长。每达成一个里程碑,我们就更新一次。

我们的做事原则

1. 我们能做什么、不能做什么,都说清楚。

2. 我们在一个工作日内确认收到询价。

3. 绝不让承诺的交期落空。

4. 公开认证状态,包括尚未取得的。

5. 处于开发阶段的产品,就明确标注为开发阶段。

首页 / 新闻与洞察

新闻与洞察

公司动态、认证进展、展会信息,以及关于储能、配电与固态变压器架构的技术札记。

首页  /  新闻与洞察  /  技术札记

为什么去掉工频变压器会改变数据中心的供电设计

变压器并没有出问题。它只是除了变压之外什么都不做——而在今天的机柜密度下,这已经不够了。

一台对一个世纪以来都正确的设备

工频变压器只做一件事:按匝数比变换电压。它没有控制环、没有固件、没有冷却风扇。它是无源的、极其可靠的,而且按它所做的事情来衡量,便宜得惊人。任何主张取代它的论证,都必须先承认这一点。理由不是变压器会坏,而是它周围的一切都变了。

变的是负荷。过去一个机柜取 5 kW,现在是 60 kW。原本统一是交流的负荷,越来越多是直流原生。而新建设施的约束,往往不再是能源供给,而是留给电气设备的建筑面积,以及电网愿意批的接入容量。当约束从成本转向体积,账算就变了。

数一数有几级变换

传统数据中心供电要经过一串环节:中压交流经变压器降到低压交流,由不间断电源的整流器转为直流,再经其输出逆变回交流,以交流形式分配到机柜,最后在每台服务器的电源里再变回直流。从中压交流到芯片真正消耗的直流之间,一共四次变换。

每一级损失百分之二到三。逐级相乘,即使每一台设备都标称百分之九十六效率,系统效率仍然只有八成多。在 10 MW 的 IT 负载下,系统效率每提高一个百分点,都相当于每天数百千瓦时,而且持续整个设施生命周期。

在链路中间引入一条直流母线,能省掉其中两次变换。这才是论证的实质,而且它与变压器本身好坏无关。

频率替代了铁芯

变压器铁芯截面积大致与其工作频率成反比。正是这一条关系,构成了固态变压器可以做小的全部原因。把链路频率从 50 Hz 提升到 20 kHz——四百倍——隔离变压器就从占一个房间的设备缩小到占一层搁板的设备。

让高频率成为可能的是开关器件。碳化硅 MOSFET 相比硅基 IGBT,能承受更高电压、更高温度和更高开关频率,同时开关损耗更低。没有宽禁带器件,这个拓扑只存在于纸面上、算不过账;有了它,这笔交换才划得来。

有必要把收益的先后顺序说清楚。变压器先变小,这是物理规律决定的。控制上的好处随后才来,因为变换改由可以被指令的电子器件完成。

这套架构解决不了什么

用一台有源设备替代多台无源设备,会把失效模式集中起来。变压器故障时动静大但极少发生;电力电子变流器的失效路径更多,其中一些还是静默的。因此冗余必须是架构层面的:设施要求 N+1,就必须由并联单元或专门设计的旁路通道来提供,而不能指望设备「足够可靠」。

保护理念也会随之改变。电力电子变流器会有意限制故障电流,这意味着上级保护不能再假设它当初设计所依据的那个短路电流水平。这是一项设计任务,不是调试细节。

认证路径也不同。中压电力电子变换设备适用的标准与传统成套设备不同,而这项评估需要时间。把这件事排晚了的项目,会发现设备已经就绪,而文件还没跟上。

什么时候划算,什么时候不划算

有用的判断标准是:传统链路是否真的构成约束。如果建筑面积紧张、变换损耗是实质性的运营成本、或者现场需要以固定变比设备做不到的方式控制功率潮流——这套架构就值得按数据评估一番。

如果这些都不成立,传统链路很可能就是更便宜的答案;此时若供应商说不是,那他是在卖架构,而不是在解决问题。一个更现代、但更贵且什么都没解决的拓扑,没有什么值得夸耀的。

要点

  • 变压器本身可靠;它的局限在于无法被控制。
  • 从中压交流到芯片消耗的直流之间有四次变换;一条直流母线可省掉两次。
  • 铁芯体积与频率成反比,因此隔离变压器的尺寸取决于开关器件,而不只取决于拓扑。
  • 可靠性、保护理念与认证都必须重新设计,不能沿用。

这对合作伙伴意味着什么

这就是我们 SST 平台背后的架构。目前有两个等级可供货 —— 13.8 kV / 3.5 MW(Rev. A7)与 10 kV / 2.5 MW —— 本文讲的是它们共用的工程原理。认证是独立的另一条线,尚未完成;质量页逐项列明各标准的状态。

如果你的设施目前还感受不到上述约束,那么传统链路现在对你可能就是对的答案。我们宁愿这样说,也不愿把架构卖给一个并不存在的问题。

首页  /  新闻与洞察  /  技术札记

构网与跟网:决定一台变流器可以被信任做什么的分野

这两个词描述的是控制行为,不是营销分级。差别体现在接入点上,出现在电网不会提前通知的那些工况下。

两者究竟在做什么

跟网型变流器把电网当作基准。它测量电压波形,用锁相环锁定其相位,然后与之同步地注入电流。从电气行为上看,它就像一个被指定了输出电流的电流源。几乎所有并网光伏逆变器和大多数储能变流器都是这样工作的,在强电网上表现极好。

构网型变流器则相反。它自行合成电压与频率基准,行为上相当于一个串接确定阻抗的电压源。它不需要被告知电网在做什么,而是自己定义了本地电网是什么。这正是它能在一张无网可跟的系统中运行的原因。

这个区分常被当成离网话题来介绍。其实不是。在任何电网较弱、逆变器电源占比很高、或现场需要穿越扰动的接入点上,它都重要。

跟网型在哪里遇到麻烦

锁相环是薄弱环节,而这个薄弱程度与电网的强弱成比例。一个有用的度量是短路比:可用短路电流与变流器额定电流之比。当这个比值下降时——因为电网偏远,或因为逆变器电源取代了过去提供短路电流的同步机组——锁相环可锁定的东西就变少,稳定裕度随之收窄。

在一个有许多逆变器共同跟随同一张正在变弱的电网的系统里,问题会叠加。单台行为正确的机组,可能通过电网阻抗相互作用,以任何单台控制都未曾整定过的频率一起振荡。这是系统层面的现象,靠改进单台变流器解决不了。

实际后果是:随着逆变器电源占比上升,「总有一个强基准可跟随」这一跟网假设,变得越来越不宜依赖。

故障电流:没人提前规划的那部分

同步电机在故障时会输出数倍额定电流,而继电保护装置正是照着这个特征设计的。跟网型逆变器不会。它是限流源:输出会被控制在额定电流附近,不会更高,因为超出额定值会把它烧掉。对一个按传统故障水平整定的保护继电器而言,仅由逆变器供给的故障,看起来可能只是一次轻微的过载。

构网型变流器可以被设计成提供确定的故障电流贡献——在确定时长内输出额定电流的若干倍——因为它控制的是电压而非电流。这使得在仅有电流受限电源时无法实现的保护配合成为可能。

这也是为什么这个问题要在设计阶段问,而不是之后。保护定值、电缆选型和变流器控制方式都取决于这个答案;而在设备下单之后改变答案,就等于要换设备。

惯量,以及它究竟代表什么

旋转电机把动能储存在自身质量里,从而抵抗频率的突变。当同步电源被逆变器取代,这种自然惯量下降,扰动后的频率变化率随之上升。构网型变流器可以模拟惯量,按频率变化率的大小释放直流环节储存的能量,从而减缓频率下滑。

诚实的提醒是:模拟惯量受限于所储存的能量。它可以减缓频率偏移,但无法无限期替代大型机组本可提供的动能。当要求是一个确定的穿越时长时,必须把它写成一个具体数字并与直流环节电容相匹配,而不能笼统假设它自然具备。

该问供应商什么

问它在电网消失时做什么,而不是问它叫什么名字。问它提供的故障电流是额定电流的几倍、能持续多久。问它能否在没有任何其他电源的情况下建立基准,以及在什么条件下交还给发电机或电网。还要问,当两台机组对频率的看法不一致时,控制会怎么做。

用数字回答这些问题的供应商,描述的是产品。用形容词回答的,描述的是宣传册。

要点

  • 跟网=跟随实测基准的电流源;构网=建立基准的电压源。
  • 电网越弱(短路比越低),跟网假设就越不安全。
  • 电流受限的逆变器会让按传统故障水平整定的保护「看不到」故障。
  • 模拟惯量能减缓频率偏移,但受储能限制——要写成具体数字。

这对合作伙伴意味着什么

我们的「储能+配电」同一供货范围,意味着变流器控制方式的选择与保护配合由同一个团队决定。这一点在这里尤其重要,因为这两件事无法各自独立决定——其中一个的答案会约束另外一个。

如果你正在为微网、弱电网现场、或逆变器电源占比很高的设施做规格定义,那么这场对话应该放在一开始,而不是放到调试检查表上。

首页  /  新闻与洞察  /  技术札记

放电深度:决定储能收益账能否成立的那个数字

规格书上标称的循环寿命是在确定的放电深度下测得的。改变放电深度,这个数字就会变——这也是为什么方案里的可用容量是一个设计决策,而不是宣传数字。

规格书上的数字附带有条件

一款标称六千次循环的磷酸铁锂电芯,并不是说在任何条件下都能循环六千次。它说的是在确定的放电深度、确定的温度、确定的充放电倍率、以及确定的寿命终止判据下——通常是剩余容量降到初始容量的百分之八十——能达到六千次。去掉其中任何一个条件,这个数字就不再成立。

这不是什么花招,这就是循环寿命的定义和测试方式。问题在于,这个规格书数字往往脱离它所依赖的条件,独自跑进了方案书和收益测算里。

放电深度与循环寿命不是线性关系

对典型磷酸铁锂电芯而言,按 100% 放电深度循环可能得到三千到四千次左右;按 80% 循环可能得到五千到六千次;按 60% 则可能明显更多。这个关系不是成比例的:放电深度每多一个百分点,付出的寿命代价比上一个百分点更大。

实际后果是:两套标称容量完全相同的系统,其全生命周期可交付的总吞吐电量可能差异很大,取决于运行窗口怎么设定。既然收益账真正买的就是吞吐量,那么运行窗口就是一个财务参数,而不是技术细节。

按榨取最大日吞吐量设计的系统,循环更深、更换更早。按长寿命设计的系统循环更浅,用同样的硬件每天少交付一些电量。两者都算不上错——它们是贴着同一个容量标签卖出去的两种不同产品。

日历老化是并行发生的,不是先后发生

循环老化只是图景的一半。电芯还会随时间老化,无论是否在循环,而且日历老化在高荷电状态和高温下更快。一块满电存放在温暖房间里的电池,即使从不循环,也会因日历老化掉容量。

这对户用系统尤其重要,因为其工作制往往很轻。一个用电量不大的家庭,可能每天只有部分循环,但仅仅日历老化每年就要掉几个百分点的容量。纯粹按循环次数建模的方案,恰恰会在那些循环最少的系统上高估寿命。

诚实的呈现方式,是给出同时受这两种机制约束的寿命估算,并写明温度与荷电状态的假设。单独一个循环次数算不上估算,它只是估算的一部分。

温度会放大这两种老化

温度会同时加速循环老化与日历老化,而且效果比多数人以为的更陡。大致而言,电芯温度每高出十度,日历寿命可能减半,循环寿命也会下降。两种效应同时作用,所以高温电芯并不是只在某一方面老化得比低温电芯快一倍,而是在两个方向上同时加快。

这也是为什么安装位置是一个电气参数。一个通风的设备间,和一个夏天不降温的车库,一年中大部分时间的温差远不止十度。同一个电池包、同样的工作制、同样的容量,仅仅因为柜子固定在哪里不同,服务寿命就可能差别很大。

一个不问安装位置的设计,并不是已经把温度考虑了进去——它只是漏掉了。

预留区间是设计出来的,不是剩下的

电池容量不应全部留给日常循环。顶部预留一个区间,是为了让意外的光伏发电能被吸纳而不是被限发;底部预留一个区间,是为了在需要时仍保有备电能力。两者都会降低日吞吐量,也都会延长寿命。

关键在于,这些区间应该作为设计的一部分被刻意选定,而不是交给逆变器内置算法碰巧设定的那个默认值。一个默认的荷电状态窗口也是一个决定,只是做决定的人另有其人;值得弄清楚是谁、为了什么做的。

合同里该写什么

可衡量的承诺有三项:运行窗口、温度、以及寿命终止判据。一份只保证容量百分比、却不写明所适用的荷电状态窗口与温度范围的质保,等于在保证一件供应商控制不了、买方也验证不了的事。

更好的做法是三项全部写明,并写明当现场实测温度或工作制超出假设范围时会怎么处理。这不是一个刁难的问题,而是一个能把「设计成可以索赔的质保」和「设计成永远不必赔付的质保」分开的问题。

要点

  • 规格书循环寿命只在标明的放电深度、温度、倍率与寿命判据下有效。
  • 循环寿命随放电深度下降的速度快于线性;浅循环换来的寿命增益是不成比例地大。
  • 日历老化与温度作用与循环老化同时发生,而不是在其之后。
  • 预留区间降低日吞吐、延长寿命——这是设计选择,不是剩余。

这对合作伙伴意味着什么

由于储能与配电出自同一供货范围,运行窗口、柜体热设计与保护配合由同一个团队确定,而这个团队也必须为质保负责。正是这一点,让报出的容量数字在客户实际的安装条件下真正可达到。

对经销商而言,实际差别在于:按真实放电深度定容的系统,标称容量可能低于竞争对手,但到第八年它仍在交付这个容量,而对手那套已经被降额或更换了。

首页 / 联系我们

联系我们

Tell us what you are planning. International enquiries are handled by our Singapore office, and we will help define the next step.

询价表单

提交即表示你同意我们的隐私政策。

Other Ways to Reach Us
Regional office
Singapore

International sales, partner onboarding and project coordination.

Address18 Kaki Bukit Road 3, #05-17
Entrepreneur Business Centre
Singapore 415978
Time zoneGMT+8 · Asia/Singapore
✉
Sales & quotations sales@lumivoltenergy.com Quotations, samples, distributor and OEM enquiries.
⚙
Technical tech@lumivoltenergy.com Certification, datasheets and engineering questions.
服务市场
  • 东南亚新加坡 · 马来西亚 · 越南 · 印尼 · 泰国 · 菲律宾
  • 欧洲德国 · 荷兰 · 比利时 · 奥地利 · 瑞士 · 英国
  • 中东阿联酋 · 沙特 · 卡塔尔 · 科威特 · 阿曼 · 巴林
  • 北美美国 · 加拿大 · 墨西哥
四种合作方式

我们以出口为先,做长期品牌合作,而不是一次性发货。四种方式都从同一件事开始:一份写清范围的文档。

面向已明确的项目

项目报价

提供负荷曲线、现场约束与目标市场,你会收到一份带型号与明确假设条件的配置化报价。

面向品牌方与经销商

OEM / ODM 代工

按你的规格与标识生产硬件,并提供目标市场所需的文件包。

面向区域伙伴

渠道分销

区域授权、技术培训与联合项目支持。认证状态按市场如实披露。

面向新应用

试点验证

一台在你的真实现场工况下运行的验证机组,配合联合评估计划与完整记录。

Home / Imprint

Imprint

Company information provided pursuant to § 5 DDG (formerly § 5 TMG).

Home / Privacy Policy

Privacy Policy

How we handle personal data when you visit this website or send us an enquiry, under the EU General Data Protection Regulation (GDPR).

本网站默认仅使用技术必需 Cookie。未经你同意,不设置任何分析或营销 Cookie。