Home / Solar Solutions / C&I ESS

Put your site’s energy to work.

Coordinate solar generation and storage around your operating profile, energy costs and critical loads.

Where it pays back

Three common starting points.

The assessment decides which one applies — and whether storage is the right answer at all.

Peak demand

Shift load away from the billing peak and hold the demand window below an agreed threshold.

Power quality and ride-through

Support voltage-sensitive processes through dips and short interruptions, within a defined operating envelope.

Capacity and expansion

Defer or avoid an upstream upgrade by adding storage at the constrained point, where the site supports it.

A proposal built around your site

We assess first, then specify.

Share your load data, tariff, electrical arrangement and project objectives. We will tell you what can be quoted and what needs a site assessment.

01

Assess

Interval load data, tariff, single-line diagram, protection settings and project objectives.

02

Design

System size, duration, protection coordination and interfaces against the site’s actual operating conditions.

03

Validate

Approved configurations only. Ratings and protection settings checked against product evidence.

04

Deliver

Scope table, installation responsibilities, commissioning checklist and support.

A proposal built around your site.

Savings and resilience depend on configuration, operating conditions and the agreed scope. We assess first, then specify.

Request a Site Assessment →
What the business case depends on

A documented assessment, not a headline savings figure.

Any number is stated with its inputs and assumptions.

Load profile

Interval data and operating hours — not a monthly bill.

Tariff structure

Energy, demand and export rates, including time bands.

Specific yield

Local irradiance, orientation, tilt and shading.

Degradation

Cell degradation and system availability over the assessment period.

Capex

Equipment, installation and grid-connection scope.

Maintenance

Routine service, replacement and monitoring costs.

No savings figure is guaranteed before a contract and a defined operating period are in place.

Capacity by duty

Savings only hold if the system is sized to the duty it actually runs.

The capacity range follows from what the storage has to do, not from the price list. Three common duties, and the checks we run behind each one before a return figure is quoted.

Duty Capacity range Typical application
Peak shaving 100 kWh – 1 MWh Manufacturing and logistics parks with a pronounced demand peak. Cabinetised, low-voltage connection, controlled from interval metering data.
Power quality and backup 200 kWh – 2 MWh Sites where one power-quality event stops production. Storage carries demand management plus dip and interruption ride-through.
Containerised storage 1 MWh and above Larger industrial sites and parks, typically medium-voltage connection with multiple load centres.
Engineering checks behind the return
  • 15-minute demand window
  • Rack balancing and circulating current
  • Cooling matched to climate and duty
  • Transformer and protection overload limits

Cooling selection includes temperature uniformity, pump and coolant maintenance, and local service capability.

Typical Configuration
Capacity rangekWh to MWh scale (per project)
EnclosureCabinetised / containerised
CoolingAir or liquid cooled (per project)
Grid connectionLow-voltage, optional MV integration
Certification Status

See our published Certification Roadmap — including what is still in progress.

What We Deliver
  • Cabinetised or containerised battery systems
  • PCS and energy management system
  • Low-voltage switchgear and distribution integration
  • Site-level monitoring and remote diagnostics
  • Commissioning and after-sales support
Who This Is For

EPCs, system integrators, and industrial end users.

Deep dive

Why commercial storage projects stall

Commercial and industrial storage has a stronger business case than residential storage — the loads are larger, the tariffs are more complex, and the savings are easier to quantify. It also has a longer list of ways to fail.

Most C&I projects do not fail because the battery was wrong. They fail in the space between disciplines: the electrical study that was never done properly, the protection settings nobody coordinated, the load profile that was estimated rather than measured, and the commissioning that revealed all three at once.

There is a pattern in how these projects are sold. The savings are modelled from the tariff schedule, a published document, rather than from the site's metered behaviour, which is not published and not always collected. A tariff-based model always produces a clean number. Whether that number survives contact with the real load profile is a separate question, and it is usually answered after the equipment has been ordered.

This page sets out where the risk actually sits in a C&I project, and how an integrated supply scope reduces it.

Read the detailed engineering discussion

Where C&I projects actually go wrong

Load profiles estimated rather than measured.

Peak demand determines both the value of the system and the sizing of every component behind it. When the profile comes from a utility bill and a guess, the resulting design is optimised for a site that does not exist. We ask for interval meter data before sizing anything.

Protection coordination treated as an afterthought.

Adding storage to an existing low-voltage installation changes fault levels and may require changes to upstream protection. If this is not analysed at design stage, it surfaces during commissioning — at which point the fix is expensive and the schedule is already lost.

Scope boundaries left undefined.

Who supplies the switchgear? Who configures the EMS? Who signs off the grid connection application? On a project with three or four suppliers, every boundary is a place where responsibility can be dropped. On a single-scope project, there is nowhere for it to be dropped.

Our approach

Electrical study first, equipment second.

We start from the site's actual load profile, fault level, and existing protection arrangement. The equipment list follows the study, not the other way round.

Storage and distribution from one scope.

Battery systems, PCS, and low-voltage switchgear come from a single supplier under a single warranty. This removes the most common boundary failure in C&I projects.

Defined interface documentation.

Where third-party equipment is involved — existing transformers, generators, building management systems — we document the interface explicitly: protocol, data points, responsibility for configuration.

Commissioning planned before shipment.

A commissioning checklist is prepared during design, not written on site. Issues found during the checklist are engineering problems; issues found after handover are warranty claims.

Typical configurations

Peak shaving, 100 kWh to 1 MWh

Manufacturing and logistics sites with a pronounced demand peak. Cabinetised, connected at low voltage, controlled against the site's interval meter data.

Power quality and backup, 200 kWh to 2 MWh

Sites where power quality events cause production losses. Storage provides both demand management and ride-through against voltage dips and short interruptions.

Containerised, 1 MWh and above

Larger industrial sites and campus installations, often with medium-voltage connection and multiple load centres.

Technical read: four things that quietly break a C&I business case

Demand charges are measured over a rolling window, not at an instantaneous peak.

A fifteen-minute demand window means the controller's objective is to hold the average below a threshold across the whole window, not to clip the tallest spike. Systems tuned to clip instantaneous peaks underperform on demand charge reduction, and the error stays invisible until the first utility bill arrives.

Parallel battery clusters need current sharing designed in.

Where several clusters sit on a common DC bus, small differences in internal resistance or state of charge produce circulating current that does not appear in the total power figure. Cluster-level management and per-cluster current limiting are what keep the array balanced; without them, the weakest cluster sets the life of the whole system.

Liquid cooling and air cooling trade different problems rather than solving the same one.

Air cooling is simpler and cheaper, but struggles to hold a tight temperature spread across a large pack in a hot climate. Liquid cooling holds cell-to-cell spread closer, at the cost of pumps, coolant circuits, and a maintenance item that field staff must be trained for. The choice should follow the duty cycle and the ambient condition, not the price list.

Converter overload capability and transformer capacity have to be sized together.

A converter that can carry one hundred and ten percent for ten seconds is useful only if the upstream transformer and protection can accommodate that current without tripping. Where the two are procured separately, the overload figure is often quoted by one supplier and quietly invalidated by the other.

Integration considerations

Grid connection and approval.

In most markets the connection application requires electrical drawings, protection settings, and sometimes a grid study. This is a schedule-critical path and should start early.

Existing protection arrangement.

Where the site already has discrimination settings in place, adding storage may require re-coordination. We map the existing arrangement before proposing a design.

Fire safety and separation.

Enclosure placement, separation distances, and detection requirements are determined by local code and by the system's chemistry and capacity. We confirm requirements for your jurisdiction rather than assuming.

Operations and monitoring.

A C&I system needs to be operable by the site's own staff. We specify what the operator will see and act on, and what escalates to us.

Common questions

What data do you need to size a system?
Interval meter data covering at least twelve months, the site's single-line diagram, existing protection settings, and the connection agreement. Without these, any sizing figure is an estimate and should be treated as one.
Can storage be added to a site with an existing generator?
Yes, but generator and storage control must be coordinated explicitly — otherwise they can fight each other during transitions. This is a control design question, and we address it at the specification stage.
How is performance measured?
Against an agreed baseline from the site's own meter data, with the calculation method documented before commissioning. If the baseline is not agreed in advance, the savings figure is not verifiable.
What about sites in multiple countries?
We confirm certification status and grid connection rules market by market. Our published certification roadmap shows what is complete and what is still in progress, so you can plan accordingly.