Smarter energy for homes and businesses.
Integrated power for data centers.
Explore solar and storage solutions, alongside advanced power architecture for critical digital infrastructure.
Singapore office · +65 6514 1618 · sales@lumivoltenergy.com
Coordinated from Singapore. Delivered by our own engineering team.
Our Singapore office handles commercial enquiries, partner onboarding and project coordination for international buyers. Design, testing and manufacturing stay in one technical team — so the engineer who answers your first question is the one accountable at shipment.
International sales, partner onboarding and project coordination.
Entrepreneur Business Centre
Singapore 415978
- Confirmed within one business dayYour enquiry goes to a named engineer, who reviews the application, target market and applicable standard.
- A scoped answer, in writingConfiguration, interface boundary and lead time — stated before you commit to anything.
- Proposal, and where it fits a validation unitFor pilots we ship a unit built to your operating envelope, not a brochure.
Markets: Southeast Asia · Europe · Middle East · North America
Different loads. The same engineering discipline.
Choose the route that matches your project. Both draw on the same storage, conversion, distribution and control engineering.
Generate. Store. Take control.
For homes and businesses that want to use more of the energy they generate, with storage and power management coordinated around how the site actually runs.
Power critical loads. Plan for what comes next.
For operators, EPCs and consultants designing around load transients, ride-through, protection and the conversion path from the grid interface to the critical load.
Power systems designed to work together.
Integration is not a slogan here — it changes what a proposal has to define, and who is answerable for it.
Coordinated interfaces
Storage, conversion and distribution are specified against the same operating envelope, not assembled from separate catalogues.
Clear scope
The proposal states what we supply, what the partner supplies, and where the interface sits — before the project starts.
Application-led engineering
The starting point is the load profile and the site constraint. The product configuration follows.
Fewer conversion stages. One controllable device.
Our SST platform converts medium-voltage AC to 800 VDC through cascaded active rectification and isolated high-frequency DC/DC. Two ratings are available today: 10 kV / 2.5 MW and 13.8 kV / 3.5 MW. Certification status is published separately, item by item.
Built to be verified.
Certification status, test data, and supply chain traceability — published, not promised.
News & Insights
Why replacing the line-frequency transformer changes data centre power design
The transformer is not failing. It simply does nothing except change voltage.
Grid-forming and grid-following: the distinction that decides what a converter can be trusted to do
The two terms describe control behaviour, not marketing tiers.
Depth of discharge: the number that decides whether a storage business case holds
Cycle life quoted on a datasheet is measured at a defined depth of discharge.
Tell us what you are planning.
Quotations · OEM / ODM · Distribution partnerships. We acknowledge enquiries within one business day.
Solutions
We organise our work by application, not by part number. Find the scenario that matches your project — then talk to our engineers about the details.
Residential ESS
Storage and power distribution for homes pursuing energy independence. Battery packs, hybrid inverters, and integrated low-voltage distribution — designed as one package.
View solution →C&I ESS
Storage systems for factories, commercial buildings, and industrial sites — built to shave peak demand, improve power quality, and connect directly to existing low-voltage distribution.
View solution →Microgrid & Off-grid
Coordinated storage, conversion, and distribution for sites where the grid is weak, expensive, or absent.
View solution →Power Distribution
Low- and medium-voltage distribution and protection equipment — engineered to sit alongside our storage systems under one point of responsibility.
View solution →Data Centre & Critical Power
Solid-state transformer architecture for AI data centres, EV charging hubs, and facilities where power quality and density are the binding constraints.
View solution →Something else?
If your application does not fit any of the above, describe it to us. Custom configurations are a normal part of what we do.
Talk to an engineer →Make more of your solar energy.
Coordinated solar, storage and power management for homes and businesses.
Use more of the energy your home generates.
Match solar generation, battery storage and backup priorities to the way your household actually uses power.
Explore home energy solutions →Put your site's energy to work.
Coordinate solar generation and storage around your operating profile, energy costs and critical loads.
Explore commercial solutions →A solar system is not a list of boxes.
Generation, storage, conversion and distribution have to be specified against the same load — and against the same operating envelope.
Swipe to see the full diagram →
Illustrative layout. The actual configuration depends on site conditions, the connection agreement and the agreed scope.
A proposal built around your site.
Savings and resilience depend on configuration, operating conditions and the agreed scope. We assess first, then specify.
Assess
Load profile, tariff, existing electrical arrangement and critical loads. For residential: roof, consumption pattern and backup priorities.
Design
System size, storage duration, protection and interfaces — against the operating conditions of the site, not a template.
Validate
Approved configurations only. Ratings, compatibility and protection settings are checked against product evidence — not assumed.
Deliver
The proposal defines equipment, installation responsibilities, compatibility and support — including what the partner supplies.
Know exactly what is included.
Your proposal defines equipment, installation responsibilities, compatibility and support. The table below states which parts we supply, which are optional and which sit with your installer or developer.
Where a project crosses these boundaries, we document the interface rather than assuming it. Scope is confirmed per project in writing.
Tell us about your site.
We acknowledge enquiries within one business day. Technical assessment timing is confirmed after we have reviewed your requirements.
Use more of the energy your home generates.
Match solar generation, battery storage and backup priorities to the way your household uses power.
Three outcomes a coordinated system is designed to deliver.
Each one depends on the configuration and the conditions at your site — not on a brochure claim.
More self-consumption
Store surplus daytime generation and use it in the evening, instead of exporting it at a low tariff. The usable share depends on load profile, tariff and battery size.
Clear visibility
Monitoring shows generation, storage and consumption separately, so you can see what the system is doing rather than inferring it from a bill.
Backup that is defined, not promised
We list which loads are backed up and for how long, then specify the transfer arrangement. Backup is a design decision, not a blanket claim.
Approved models are released market by market.
Every proposal states the exact model and the five figures below. If a figure is still under test, the proposal says so.
Usable capacity (kWh)
Usable, not nameplate — stated at the agreed depth of discharge and end-of-life criterion.
Continuous power (kW)
Continuous output at the stated ambient temperature; the overload window is stated separately.
Phase and connection
Single-phase or three-phase, and the grid connection arrangement the model is approved for.
Backup limit
Which loads can be backed up, the transfer time, and the maximum backed-up power.
Market availability
The markets where the model is released, its certification status, and the lead-time basis.
What we will not do
We will not quote a rating that is not approved for your market. If a figure is still under test, the proposal says so.
| Usable capacity | Multiple capacities (per project) |
| Chemistry | LFP |
| Installation | Wall-mounted / floor-standing |
| Configuration | Single-phase / three-phase |
See our published Certification Roadmap — including what is still in progress.
- Battery modules and packs with integrated BMS
- Hybrid inverter / PCS for grid-tied and backup operation
- Optional integrated low-voltage distribution
- Monitoring and energy management
- Datasheets, installation documentation, and technical support
Installers, distributors, and OEM partners serving residential markets.
What actually determines a residential storage outcome
Home energy storage has a marketing problem. On paper the pitch is simple: store the electricity you generate, use it when you need it, buy less from the grid. In practice, most homeowners who buy a battery system discover three things within the first month — it was harder to install than the brochure suggested, it does less than they expected, and nobody will tell them plainly what it will actually save.
For distributors and installers, the consequences are more concrete. Callback rates rise. Commissioning takes longer than quoted. And when something goes wrong, the installer is stuck mediating between a battery supplier, an inverter supplier, and whoever built the distribution panel — none of whom consider the problem theirs.
There is a structural reason for this. Residential storage is sold as a product but delivered as a system: cells, a converter, a distribution interface, a monitoring layer, and an installation. The product is chosen in a showroom and the system is commissioned in a garage. Most of what determines the outcome happens on the system side, where the buyer has the least visibility.
This page sets out what a residential storage project actually depends on, and where an integrated approach changes the arithmetic.
Read the detailed engineering discussion
The three failure modes we see most often
Battery, inverter, and low-voltage distribution are typically sourced from three different manufacturers. Each works correctly on its own. The problems appear at the boundaries: communication protocol mismatches, conflicting protection settings, and coordination of charge and discharge limits. When these surface, each vendor can reasonably claim their product is behaving as specified.
Storage is often sized on a rule of thumb rather than on the household's actual load profile. A system that is too small cycles to its limits every day and degrades faster than expected; one that is too large never reaches an economical depth of discharge. Neither outcome is obvious from the specification sheet.
When a system is assembled from parts, warranty responsibility is fragmented. A fault in month fourteen means the homeowner, the installer, and three suppliers all need to agree on whose part failed before anything gets repaired.
What an integrated approach changes
Storage, conversion, and low-voltage distribution come from one supplier, under one warranty, with one technical contact. The homeowner and the installer each have exactly one number to call.
Because the same engineering team specifies the battery, the converter, and the distribution stage, communication and protection coordination are resolved in design rather than in the field. Commissioning becomes a checklist rather than a negotiation.
We ask for twelve months of consumption data, or install monitoring first, before recommending a capacity. The objective is not the largest system the roof can support — it is the smallest system that delivers the outcome the household is actually paying for.
We will tell you when storage is not the right investment for a particular household — for example where consumption is low, the tariff is flat, or the roof orientation limits generation. A project that should not have been sold costs more in reputation than it earns in margin.
Typical configurations
Apartment or small house with a balcony solar system. Wall-mounted, single-phase, sized for evening and overnight load shifting rather than full independence.
Detached house with a rooftop array and an electric vehicle. Three-phase connection, higher continuous output, and integrated low-voltage distribution so the storage and the main panel are delivered as one coordinated package.
For households that already have panels but no storage. The critical question here is inverter compatibility — we ask for the existing inverter model and generation data before quoting, rather than after.
Technical read: the four parameters that decide whether the numbers hold
A cell rated for thousands of cycles at eighty percent depth of discharge will deliver materially fewer at one hundred percent. This is why the usable capacity we quote is a design decision rather than a marketing figure, and why the reserve floor is set deliberately rather than left to the algorithm inside the inverter.
A pack held at thirty-five degrees ages several times faster than one held at twenty degrees, even at identical throughput. Installation location is therefore an electrical parameter, not a matter of convenience. We ask where the unit will live before we recommend a chemistry or a capacity.
Real efficiency depends on part-load behaviour, stand-by consumption, and how much time the system spends at low state of charge. We publish the curve rather than a single peak figure, because the peak figure is the one that almost never occurs in service.
A server rack, a sump pump, and a heating controller have entirely different tolerance to a supply interruption. Rather than claiming a single milliseconds figure, we map the critical loads first and then specify the transfer arrangement that actually protects them.
Integration considerations
Adding storage behind the meter changes fault current levels and protection requirements. This has to be evaluated at the design stage, not discovered during commissioning.
Where the system is installed matters as much as what is installed. A unit in an unheated garage in a cold climate will behave differently from one in a ventilated utility room — we ask about the installation location before recommending a configuration.
Export limits, anti-islanding requirements, and registration obligations vary by country and frequently change. We confirm the applicable rules for your market before finalising a design.
The system should produce data the household can understand and the installer can act on — not a dashboard only an engineer can read.
Common questions
Can a battery system work without solar panels?
How long does installation take?
What happens at end of life?
Which markets do you support?
Put your site’s energy to work.
Coordinate solar generation and storage around your operating profile, energy costs and critical loads.
Three common starting points.
The assessment decides which one applies — and whether storage is the right answer at all.
Peak demand
Shift load away from the billing peak and hold the demand window below an agreed threshold.
Power quality and ride-through
Support voltage-sensitive processes through dips and short interruptions, within a defined operating envelope.
Capacity and expansion
Defer or avoid an upstream upgrade by adding storage at the constrained point, where the site supports it.
We assess first, then specify.
Share your load data, tariff, electrical arrangement and project objectives. We will tell you what can be quoted and what needs a site assessment.
Assess
Interval load data, tariff, single-line diagram, protection settings and project objectives.
Design
System size, duration, protection coordination and interfaces against the site’s actual operating conditions.
Validate
Approved configurations only. Ratings and protection settings checked against product evidence.
Deliver
Scope table, installation responsibilities, commissioning checklist and support.
A proposal built around your site.
Savings and resilience depend on configuration, operating conditions and the agreed scope. We assess first, then specify.
Request a Site Assessment →A documented assessment, not a headline savings figure.
Any number is stated with its inputs and assumptions.
Load profile
Interval data and operating hours — not a monthly bill.
Tariff structure
Energy, demand and export rates, including time bands.
Specific yield
Local irradiance, orientation, tilt and shading.
Degradation
Cell degradation and system availability over the assessment period.
Capex
Equipment, installation and grid-connection scope.
Maintenance
Routine service, replacement and monitoring costs.
No savings figure is guaranteed before a contract and a defined operating period are in place.
Savings only hold if the system is sized to the duty it actually runs.
The capacity range follows from what the storage has to do, not from the price list. Three common duties, and the checks we run behind each one before a return figure is quoted.
| Duty | Capacity range | Typical application |
|---|---|---|
| Peak shaving | 100 kWh – 1 MWh | Manufacturing and logistics parks with a pronounced demand peak. Cabinetised, low-voltage connection, controlled from interval metering data. |
| Power quality and backup | 200 kWh – 2 MWh | Sites where one power-quality event stops production. Storage carries demand management plus dip and interruption ride-through. |
| Containerised storage | 1 MWh and above | Larger industrial sites and parks, typically medium-voltage connection with multiple load centres. |
- 15-minute demand window
- Rack balancing and circulating current
- Cooling matched to climate and duty
- Transformer and protection overload limits
Cooling selection includes temperature uniformity, pump and coolant maintenance, and local service capability.
| Capacity range | kWh to MWh scale (per project) |
| Enclosure | Cabinetised / containerised |
| Cooling | Air or liquid cooled (per project) |
| Grid connection | Low-voltage, optional MV integration |
See our published Certification Roadmap — including what is still in progress.
- Cabinetised or containerised battery systems
- PCS and energy management system
- Low-voltage switchgear and distribution integration
- Site-level monitoring and remote diagnostics
- Commissioning and after-sales support
EPCs, system integrators, and industrial end users.
Why commercial storage projects stall
Commercial and industrial storage has a stronger business case than residential storage — the loads are larger, the tariffs are more complex, and the savings are easier to quantify. It also has a longer list of ways to fail.
Most C&I projects do not fail because the battery was wrong. They fail in the space between disciplines: the electrical study that was never done properly, the protection settings nobody coordinated, the load profile that was estimated rather than measured, and the commissioning that revealed all three at once.
There is a pattern in how these projects are sold. The savings are modelled from the tariff schedule, a published document, rather than from the site's metered behaviour, which is not published and not always collected. A tariff-based model always produces a clean number. Whether that number survives contact with the real load profile is a separate question, and it is usually answered after the equipment has been ordered.
This page sets out where the risk actually sits in a C&I project, and how an integrated supply scope reduces it.
Read the detailed engineering discussion
Where C&I projects actually go wrong
Peak demand determines both the value of the system and the sizing of every component behind it. When the profile comes from a utility bill and a guess, the resulting design is optimised for a site that does not exist. We ask for interval meter data before sizing anything.
Adding storage to an existing low-voltage installation changes fault levels and may require changes to upstream protection. If this is not analysed at design stage, it surfaces during commissioning — at which point the fix is expensive and the schedule is already lost.
Who supplies the switchgear? Who configures the EMS? Who signs off the grid connection application? On a project with three or four suppliers, every boundary is a place where responsibility can be dropped. On a single-scope project, there is nowhere for it to be dropped.
Our approach
We start from the site's actual load profile, fault level, and existing protection arrangement. The equipment list follows the study, not the other way round.
Battery systems, PCS, and low-voltage switchgear come from a single supplier under a single warranty. This removes the most common boundary failure in C&I projects.
Where third-party equipment is involved — existing transformers, generators, building management systems — we document the interface explicitly: protocol, data points, responsibility for configuration.
A commissioning checklist is prepared during design, not written on site. Issues found during the checklist are engineering problems; issues found after handover are warranty claims.
Typical configurations
Manufacturing and logistics sites with a pronounced demand peak. Cabinetised, connected at low voltage, controlled against the site's interval meter data.
Sites where power quality events cause production losses. Storage provides both demand management and ride-through against voltage dips and short interruptions.
Larger industrial sites and campus installations, often with medium-voltage connection and multiple load centres.
Technical read: four things that quietly break a C&I business case
A fifteen-minute demand window means the controller's objective is to hold the average below a threshold across the whole window, not to clip the tallest spike. Systems tuned to clip instantaneous peaks underperform on demand charge reduction, and the error stays invisible until the first utility bill arrives.
Where several clusters sit on a common DC bus, small differences in internal resistance or state of charge produce circulating current that does not appear in the total power figure. Cluster-level management and per-cluster current limiting are what keep the array balanced; without them, the weakest cluster sets the life of the whole system.
Air cooling is simpler and cheaper, but struggles to hold a tight temperature spread across a large pack in a hot climate. Liquid cooling holds cell-to-cell spread closer, at the cost of pumps, coolant circuits, and a maintenance item that field staff must be trained for. The choice should follow the duty cycle and the ambient condition, not the price list.
A converter that can carry one hundred and ten percent for ten seconds is useful only if the upstream transformer and protection can accommodate that current without tripping. Where the two are procured separately, the overload figure is often quoted by one supplier and quietly invalidated by the other.
Integration considerations
In most markets the connection application requires electrical drawings, protection settings, and sometimes a grid study. This is a schedule-critical path and should start early.
Where the site already has discrimination settings in place, adding storage may require re-coordination. We map the existing arrangement before proposing a design.
Enclosure placement, separation distances, and detection requirements are determined by local code and by the system's chemistry and capacity. We confirm requirements for your jurisdiction rather than assuming.
A C&I system needs to be operable by the site's own staff. We specify what the operator will see and act on, and what escalates to us.
Common questions
What data do you need to size a system?
Can storage be added to a site with an existing generator?
How is performance measured?
What about sites in multiple countries?
Microgrid & Off-grid Power
For sites where the grid is weak, expensive, or absent — we combine storage, power conversion, and distribution into a single coordinated system, delivered as one package with one point of responsibility.
| Remote telecom sites | — |
| Islands and coastal communities | — |
| Agricultural and irrigation sites | — |
| Mining and construction camps | — |
| Backup power for critical facilities | — |
Grid-forming capability: please confirm your specific requirements with our engineering team.
- Battery storage systems
- Power conversion, including grid-forming capability where applicable
- Low-voltage distribution and protection
- Energy management and remote monitoring
- Configuration engineering for site-specific requirements
Telecom operators, project developers, EPCs, and NGOs running off-grid programmes.
Designing for sites the grid does not reach
Off-grid and weak-grid projects are unlike anything else in the storage business. There is usually no utility to fall back on, no second attempt at commissioning, and no possibility of calling an engineer to site next week. The system either works in the conditions it was designed for, or the project fails visibly and expensively.
These projects also attract the most optimistic assumptions. Load growth is underestimated. Diesel consumption is understated. Ambient temperatures are taken from a regional average rather than from the equipment enclosure. Fuel logistics are planned for the first year and forgotten afterwards.
What makes this harder is that the feedback loop is long. On a grid-connected project, a design error shows up as an underperforming bill within a month. On a remote site, the same error may take two years to surface, by which time the commissioning team has moved on and the maintenance team is working with whatever documentation survived the handover.
This page sets out how we approach off-grid design, and where we say no.
Read the detailed engineering discussion
Where off-grid projects fail
Off-grid loads are frequently estimated from a template — so many kWh per household, so many per telecom site. Real sites have seasonal variation, unexpected additions, and loads that run at times nobody anticipated. We insist on measured data or a monitored trial period before committing to a design.
A system designed for the commissioning year will be undersized by year four. Loads grow. Panels degrade. Batteries lose capacity. The design has to account for the site's trajectory, not its opening state.
Many remote sites are hundreds of kilometres from the nearest qualified technician. If the design assumes a site visit can happen within a week, it is not an off-grid design — it is an on-grid design in a remote location. Remote diagnostics and guided local intervention have to be built in from the start.
Our approach
We prefer to instrument a site and collect data for a period before sizing anything. Where monitoring is genuinely impossible, we design with explicit margin and document the assumptions on the drawing.
Capacity planning accounts for expected load growth and degradation. Where growth is uncertain, we design for modular expansion rather than over-sizing from the start.
Storage, conversion, and distribution from a single supplier. On a remote site, the cost of a boundary dispute between two vendors is measured in months, not days.
Diagnostics accessible without a site visit, clear guidance for local staff, and an honest statement of what can and cannot be resolved remotely.
If the logistics, the climate, or the service distance make a project one we cannot properly stand behind, we say so before the order rather than after.
Typical configurations
Small-to-medium storage with solar, sized to replace a defined proportion of diesel runtime rather than all of it. Defined maintenance intervals and remote monitoring are part of the scope.
Larger systems where storage forms the grid. Load management, phased connection of users, and clear operator training matter as much as the equipment specification.
Storage supporting irrigation, processing, or cold chain — where an outage has a direct cost in spoiled produce or lost output. Duty cycle and seasonal variation drive the sizing.
Technical read: the four control questions an off-grid design must answer
A grid-forming converter establishes voltage and frequency and must supply the fault current the protection scheme expects; a grid-following unit measures an existing reference and follows it. Where storage forms the grid, the converter has to synthesise a stiff reference and remain stable when a large motor starts. Droop settings and virtual inertia are what make that possible.
Where a generator remains, the useful question is what proportion of running hours storage can replace. Generator hours are usually dominated by light-load running, where the machine is inefficient and wears quickly. Targeting those hours first delivers most of the fuel saving for a fraction of the storage capacity.
A system that charges to full and discharges to empty every day will not last the term of the service agreement. Reserving an upper band for solar absorption and a lower band for unexpected load keeps the battery inside a range that preserves life, at the cost of some usable capacity that was never reliably available in practice.
If the system must restart after a full shutdown, the sequence has to be written down and tested: who energises what, in what order, and with which loads connected. A black start that only works while the sun is up is a limited capability, and the site operator should know that before relying on it.
Integration considerations
Where storage establishes the reference voltage and frequency, the control strategy is fundamentally different from a grid-tied system. Step loads, motor starting, and multiple source transitions all have to be analysed.
Where diesel generation remains, the transition between generator and storage is where most failures occur. This must be tested in a controlled condition, not discovered on site.
Enclosure temperature in direct tropical sun can exceed ambient by a wide margin. Designs based on regional weather averages will underperform.
What parts should be held locally, and what can be shipped? This is a design decision, not an afterthought, and it affects the recommended configuration.
The people running the site may not be electrical technicians. The system's interfaces and the documentation have to match their actual capability, not the capability we wish they had.
Common questions
Can you design a fully diesel-free system?
How do you handle sites with no reliable data?
What is the realistic lead time?
How is maintenance handled?
Power Distribution
Low- and medium-voltage distribution and protection equipment engineered to sit alongside our storage systems — one supplier, one interface, one point of responsibility. For partners who are tired of coordinating three vendors to deliver one site.
| Low-voltage switchgear and distribution panels | — |
| Protection, metering, and control components | — |
| Medium-voltage interface equipment | Project-specific |
| Custom configurations for OEM and projects | — |
Designed to the requirements of your target market — for example IEC 61439, GB 7251.
- Fewer suppliers to manage, fewer interfaces to debug
- Factory-level coordination between storage and distribution
- Single warranty and single technical contact
- A clear upgrade path from LV switchgear to SST-based MV architecture
EPCs, panel builders, system integrators, and OEM partners.
The case for buying storage and distribution from one supplier
On most projects, energy storage and low-voltage distribution are procured separately. It seems sensible: each is a specialised product, and each has its own qualified suppliers. The problems only become visible later, and they are always at the boundary between the two packages.
The battery system's protection settings must coordinate with the distribution board's. The communication interface has to be agreed by two engineering teams. The physical installation has to fit into a space neither party fully controls. And when commissioning reveals a mismatch, both suppliers can correctly point out that their own equipment performed to specification.
It is worth being precise about what is being compared. The question is not whether separate suppliers can each deliver a working product — they usually can. The question is who owns the joint that sits between them, and whether that ownership is written down somewhere before the equipment is ordered.
This page is not an argument that separate procurement is always wrong. It is an argument that the coordination cost is real, and that it should be counted.
Read the detailed engineering discussion
The coordination cost, itemised
Adding storage changes fault current levels at the point of connection. Someone has to re-check the upstream and downstream protection settings against the new conditions. When two suppliers are involved, this study is frequently assumed to be the other party's responsibility.
Protocol, data points, control signals, and responsibility for configuration must be agreed before design freeze. Every interface between two suppliers is a document that must be written and maintained by someone.
Two supply chains mean two lead times, and the later one sets the date. It also means two opportunities for a delay that affects the other party's installation window.
When a fault occurs at the boundary, attribution requires agreement between suppliers before repair can proceed. On a single-scope project this step does not exist.
What we offer
Battery systems, PCS, and low-voltage switchgear are specified together, so protection coordination and interface definition happen inside one team rather than across two organisations.
Where third-party equipment is involved, we produce the interface document rather than leaving it to be resolved on site.
From LV switchgear today to medium-voltage architecture based on solid-state transformers as it becomes available. Partners should be able to plan a trajectory, not just a purchase.
Where something genuinely falls outside what we should supply — for example civil works, or a utility-side connection — we say so clearly rather than absorbing it ambiguously.
Typical configurations
Storage cabinets and the associated distribution board delivered as one coordinated package, with protection settings studied together.
Adding storage to a site with existing switchgear. The work here is as much about understanding the existing installation as about the new equipment.
Where the connection point is at medium voltage, the interface equipment and its coordination with the low-voltage side are specified as one design.
Technical read: four checks that live in the seam between packages
Adding a storage converter at a point of connection changes the prospective short-circuit current at that busbar, which in turn changes whether the existing protection still discriminates correctly. A study to the IEC 60909 method takes hours when it is done at design stage, and weeks when it is done in response to a nuisance trip on site.
IEC 61439 defines how a low-voltage assembly is verified for temperature rise at its rated current, and what the assembly is expected to withstand if an internal arc occurs. These are not qualities that can be inferred from the sum of the components used; they belong to the assembly as a whole, which is why the assembly has to have one owner.
Non-linear loads such as LED lighting, variable-speed drives, and switched-mode supplies inject third-harmonic current that adds in the neutral rather than cancelling. A neutral sized on the assumption of balanced linear loads can run hot in a building whose load mix has changed since it was designed.
Connecting storage on the main busbar, on a sub-board, or on the load side of a specific feeder each produces a different coordination question. The location should be chosen together with the protection arrangement, because the two cannot be decided independently.
Integration considerations
Before proposing anything, the existing single-line diagram, protection settings, and spare capacity must be understood. A design that ignores what is already there is a design that will be modified on site.
Where the storage and the distribution equipment physically sit affects cable routing, thermal management, and access for maintenance. These are design decisions, not installation details.
Applicable standards differ by market and by the voltage class involved. We confirm the requirements for your destination market rather than applying a default.
Who installs what, in what order, and who signs off each stage. On a single scope this is one schedule; on a multi-vendor project it is a negotiation.
Common questions
Does this mean we cannot use our existing panel builder?
How do you handle standards in a new market?
Can you work with our preferred equipment?
What about the utility connection?
Integrated power for the next generation of data centers.
Coordinate conversion, storage, distribution and controls around critical-load requirements — from the grid interface to the critical load.
Discuss Your Power Architecture →From the grid interface to the critical load.
Define the power path as one system. Conversion, storage, distribution and controls are specified against the same operating envelope — not assembled from separate packages.
Illustrative architecture. The actual configuration depends on voltage class, isolation requirements and the target market’s certification path. Scope boundaries — LumiVolt supply, partner supply and third-party interfaces — are defined in the project documentation.
Planning for 800 VDC? Start with the system architecture.
800 VDC is an option, subject to interface, grounding and protection assessment. Evaluate conversion, energy buffering and controls against your load requirements before the bus voltage is fixed.
Each project states which stage applies to which function — conversion, buffering, protection and recovery. No function is presented as validated before the test evidence exists.
The bottleneck is conversion, not generation.
A conventional feed passes through a line-frequency transformer, an AC/DC stage, a DC/AC stage, and a distribution panel — each with losses, footprint, and its own failure modes. An SST replaces most of that chain with a single controllable power-electronic stage.
Smaller, lighter footprint
No line-frequency transformer core or oil tank. Meaningful where floor area and structural loading are the real constraint.
Precise control
Voltage, frequency, and power flow controlled electronically — not fixed by a transformer turns ratio.
Bidirectional by nature
Power flows both ways without a separate converter stage — relevant for storage integration and V2G-style applications.
Integrated LV distribution
The LV output stage is part of the same device — one enclosure instead of transformer plus switchgear cabinets.
DC-native where useful
A DC link at the SST output suits storage, EV fast charging, and increasingly DC-powered IT loads.
Grid support functions
Reactive power compensation, voltage regulation, and — in suitable configurations — grid-forming capability.
The rack went from 8 kW to 1 MW in six years.
Nothing upstream was redesigned for that. The power train is now the constraint on how much compute a building can hold.
| Year | GPU generation | Power per rack | Power per cabinet |
|---|---|---|---|
| 2024 | Blackwell | ~130–250 kW | ~40–100 kW |
| 2025 | Blackwell Ultra | ~250–500 kW | ~100–350 kW |
| 2028 | Rubin Ultra | ~900–1000+ kW | ~350–500 kW |
Ranges cover air- and liquid-cooled configurations. Rack and cabinet are counted separately in the source roadmap — confirm both definitions with the vendor before committing a design. These are the roadmaps our customers are designing to, not our forecast.
Four things break at megawatt density.
Each one has a workaround at 100 kW and no workaround at 1 MW.
Floor area collapses
At 8 kW a rack needs half a square metre of power equipment. At 500 kW the power room grows faster than the compute hall — the building becomes a substation with servers in it.
Copper stops making sense
Low-voltage distribution at 800 A per rack means busbar measured in tonnes. The copper alone can outweigh the electronics it feeds, and it all has to be supported, cooled and paid for.
Conversion stages stack up
MV transformer, LV switchgear, UPS, PSU — every stage costs one to two points of efficiency and a cabinet of floor space. At 10 MW that is hundreds of kW of heat nobody planned for.
The load stops being predictable
AI training loads swing on a millisecond scale between idle and full draw. A grid connection designed around a smooth commercial load profile will read this as a fault, not as demand.
Raising the distribution voltage is the only move that removes copper, floor area and conversion stages at the same time.
Applications we serve around the SST.
AI & Hyperscale Data Centres
High-density racks need high-density power delivery. The SST shortens the conversion chain and reduces the electrical footprint per megawatt.
EV Charging Hubs
Direct MV connection with an integrated DC output — fewer conversion stages between the grid and the vehicle.
Critical & Industrial Facilities
Sites where power quality, redundancy, and physical footprint all matter at once.
Commercial record and development status — stated plainly
Our SST platform is not a prototype and not yet a volume product. Two ratings are quotable: 13.8 kV / 3.5 MW (Rev. A7) and 10 kV / 2.5 MW. Three 10 kV / 2.42 MVA / 800 VDC units have been in service at a data-centre campus since September 2023, four 13.8 kV units are in delivery on a 2026 export order, and a 750 V series is grid-connected at a park site. Certification is still open, and the Quality page states exactly which standards are pending. If your project requires a type-tested unit today, tell us and we will say whether we fit before a proposal is written.
Why data centre power architecture is changing
Data centre power design has been stable for decades. Power arrives at medium voltage, a line-frequency transformer steps it down, an uninterruptible power supply conditions it, and it is distributed at low voltage to the racks. That architecture worked because the loads it served were predictable and the constraint was cost per megawatt.
That is no longer the situation. Rack density has increased by an order of magnitude. Loads are increasingly DC-native. Sites are constrained by available floor area and by grid connection capacity rather than by energy supply. And the electrical infrastructure now represents a significant share of the cost of a megawatt of IT capacity.
The change is being driven from the load side rather than the supply side. For as long as loads were AC and predictable, the conventional chain was an adequate answer to a solved problem. Once loads became dense and DC-native, the chain stopped being the cheapest way to answer the question, and alternative architectures started to be worth the engineering effort.
This page sets out why the conventional chain is becoming a constraint, and where solid-state transformer architecture changes the calculation.
Read the detailed engineering discussion
Where the conventional chain binds
A line-frequency transformer is a large, heavy, oil-filled device. For a given megawatt capacity it occupies space that could otherwise hold IT equipment — and in a dense facility, floor area is the scarce resource.
Power passes through AC/DC and DC/AC stages that each introduce losses. At data centre scale, a small efficiency improvement compounds into a large operating cost over the life of the facility.
A transformer's output voltage is fixed by its turns ratio. It cannot regulate voltage dynamically, cannot control power flow direction, and cannot provide reactive power support without additional equipment.
Racks, storage, and fast charging increasingly operate natively on DC. The conventional chain converts AC to DC and back, when a DC bus would avoid those conversions entirely.
What SST architecture changes
A solid-state transformer replaces the line-frequency transformer, the separate power conversion stage, and the LV distribution stage with fewer, smaller, electronically controlled stages.
Voltage, frequency, and power flow are controlled electronically rather than fixed by physical construction. This enables functions that would otherwise require separate equipment.
Power can flow in either direction without an additional converter, which matters both for storage integration and for any application where the site both consumes and exports.
Storage, fast charging, and DC-powered IT loads can connect to a DC link at the output stage, avoiding a conversion on each side.
Two ratings are available and can be quoted, and units are in service — three 10 kV class AIDC units in service since 2023, plus a four-unit export order in delivery. Certification is not finished, and we publish that item by item rather than leaving you to find out. Alongside the product we offer architecture review, reference design, and a joint validation plan for the functions that still need evidence.
Where this applies
Where rack density is the binding constraint and electrical footprint per megawatt directly determines how much compute fits in the building.
Sites connecting directly at medium voltage with high aggregate charging demand, where avoiding conversion stages improves both efficiency and equipment count.
Sites already operating DC bus infrastructure where an AC-based conversion chain is an avoidable inefficiency.
Technical read: four parameters that define an SST design
A typical solid-state transformer rectifies medium-voltage AC onto a DC link, transfers across an isolating medium-frequency transformer, and then either inverts back to low-frequency AC or presents a DC output directly. Each stage can be built on silicon-carbide devices, which permit higher switching frequency, which in turn shrinks the isolating transformer dramatically.
The size of a transformer core falls roughly in proportion to the frequency it operates at. Raising the link from fifty hertz to tens of kilohertz is what allows a transformer that once filled a room to fit inside a cabinet — and that change in volume is the whole argument for the architecture, before any control benefit is counted.
Because the DC link carries stored energy, a solid-state transformer can hold up its output through a supply disturbance of a defined duration. How long it holds is set by the link capacitance and the load, and it has to be stated as a number in the specification rather than implied as a general guarantee.
Replacing several passive devices with one active device concentrates failure modes. If the facility requires N plus one, that redundancy has to come from parallel units or from a bypass path designed in from the start; it cannot be added afterwards as an option. Reliability is argued at system level, not at device level.
Integration considerations
Power-electronic conversion behaves differently from electromechanical transformation under fault conditions. Protection strategy and ride-through behaviour must be designed deliberately, not inherited from conventional practice.
A single device replacing several must be assessed for failure modes at system level. Where redundancy is required, the architecture must provide it explicitly.
Power-electronic equipment at medium voltage follows a different certification path from conventional switchgear. This affects the timeline and should be planned early.
Removing the transformer reduces footprint but concentrates losses in a smaller volume. Cooling design becomes more, not less, critical.
Common questions
Has the SST actually been deployed?
What can we do with you today?
How do I know if SST suits my site?
What certifications do you expect?
Products
Every product below is documented in English with full specifications, certification status, and downloadable datasheets. If you need something not listed, ask — we build custom configurations.
Battery Modules & Packs
LFP modules and packs with integrated BMS for residential and commercial systems.
Battery Management Systems
Cell monitoring, balancing, protection, and communication.
PCS & Hybrid Inverters
Bi-directional power conversion for grid-tied and off-grid applications.
Energy Storage Cabinets
Integrated battery, conversion, thermal management, and protection in one enclosure.
LV Switchgear & Distribution
Distribution, protection, and metering equipment.
SST — Solid State Transformer
Medium-voltage power conversion that consolidates the conventional transformer, PCS and LV distribution chain into one controllable device — subject to isolation, protection and interface requirements.
The right configuration starts with clear specifications.
Every product page follows the same seven sections, in the same order. If a figure is not approved for your market, the page says so instead of leaving a gap you have to interpret.
Solid-State Transformer
A medium-voltage to DC conversion platform for AI data centres, EV charging, renewable integration and smart grids. Medium-voltage AC in, 800 VDC out, through one controllable power interface.
Discuss an SST project →Four ratings. Two released — one of them running since 2023.
Ratings are released separately. A released rating means the design is frozen at the stated revision and can be quoted for a project — it does not by itself imply certification, which is tracked separately on the Quality page.
13.8 kV · 3.5 MW
Rev. A7 product, 800 VDC output. The rating with a full published parameter set.
10 kV · 2.5 MW
First deployment of this rating: three 10 kV / 2.42 MVA / 800 VDC AIDC units, in service since September 2023 and still running.
10 kV · 1 MW
Planned for a future release. Parameters are not frozen and are not quoted.
34.5 / 35 kV · 10 MW
Planned timing, subject to product plan. Not a contractual delivery commitment.
Not a laboratory prototype. Units in service, and units in build.
The SST platform behind our product line has been through successive field generations since 2017. For a buyer assessing it today, three deployments matter: units that have run for years, an export order now in delivery, and a grid connection that proves the DC output class outside a data hall.
3 × 10 kV / 2.42 MVA / 800 VDC
Three commercial AIDC units, energised at a data-centre campus in September 2023 and running since. As far as we are aware they are among the earliest commercial solid-state transformer deployments in an AI data centre — and they are still in service.
4 × 13.8 kV / 800 VDC
Four 13.8 kV units ordered in 2026 by an overseas AI computing developer for its own campuses. The first outbound order for this platform, currently in production and delivery.
10 kV / 2 MVA / 750 V
A separate 750 V series, grid-connected at an integrated solar-storage-charging park. It is not an AI data centre, and we list it as what it is: proof that the same conversion platform also runs grid-tied outside a data hall.
What this record does and does not mean
These are real units, real orders and a real supply chain, not a laboratory prototype. They are also not volume production. The platform is at demonstration and small-batch commercialisation: unit cost is still high, cloud operators have not yet put it into volume procurement, and industrialisation is early. We would rather you hear that from us now than discover it later.
Four statuses kept separate. One company accountable for all of them.
Quotable, in service, in delivery and type-tested are different things, and suppliers blur them on purpose. Here is each one, and where this platform actually stands on it.
| Status | What it means | Where this platform stands |
|---|---|---|
| Quotable | Design frozen at a stated revision. We can price it, contract it and ship it. | 13.8 kV / 3.5 MW (Rev. A7) · 10 kV / 2.5 MW |
| In service | Energised on a customer site and running under load. | Three units since September 2023 — 10 kV class, data centre |
| In delivery | Ordered, in production, on its way to site. | Four 13.8 kV units, 2026 export order |
| Type-tested | A third-party certificate against the standard that applies to the market. | Not yet — IEC 62477-1 remains open |
A configuration can be quotable and in service without yet being type-tested. We do not let the second fact hide the third: the Quality page tracks certification item by item, with the evidence held for each.
One contract, one warranty and one named engineer. Application study, single-line diagram and protection settings. Market-specific documents, commissioning, remote diagnostics and spare parts held locally. If something goes wrong at the interface, there is one number to call.
Production history since 2017. Medium-voltage manufacturing and test infrastructure. SiC devices and high-frequency magnetics. Field generations in data centres and parks. Type-test records available to qualified buyers under NDA.
Platform capability and the certification status of a specific offered configuration are separate pieces of evidence, and we treat them that way.
Four applications, one power interface.
The same conversion chain, configured four ways. The port count and the control mode are what change.
10–35 kV in · 800 VDC out
Rack-level or row-level distribution. Removes the LV switchgear and UPS stages; the DC bus feeds the racks directly.
10–35 kV in · 800–1000 VDC out
Megawatt charging without a separate substation building. V2G and PV/storage integration on the same DC bus.
PV and storage on a common DC bus
Large PV plants and storage connect at medium voltage through one conversion stage instead of two.
Grid-forming and ride-through
A controllable, bidirectional interface between medium-voltage AC and a DC network — including weak-grid and microgrid operation.
Cascaded AFE, isolated high-frequency DC/DC, parallel DC output.
Medium-voltage AC is actively rectified in a cascaded arrangement, buffered per module, then isolated and converted at high frequency before the parallel low-voltage output stage. Control targets are regulated input current, stable output voltage, module voltage balance, and coordinated protection and bypass.
Simplified for clarity, based on the Rev. A7 block diagram. Topology, switching frequency and control parameters depend on the project and the product revision.
13.8 kV / 3.5 MW, Rev. A7
| Rated power / voltage / current | 3.5 MW / 800 V / 4375 A |
| Steady-state accuracy / transient deviation | ±1% / ±5% |
| Voltage regulation | Ripple ≤0.5% / static ≤1% / dynamic ≤3% |
| Phases / frequency / input voltage | Three-phase / 50–60 Hz (±3 Hz) / 13.8 kV |
| Permissible voltage variation | −10% ~ +10% |
| Peak efficiency / THDi / power factor | 98.5% peak / <3% above 50% load / >0.98 |
| Output overload | 105% continuous / 110% 60 min / 125% 10 min / 150% 0.2 s |
| Short-circuit fault clearing | 150% / 180 ms |
| Insulation level (BIL) | >95 kV |
| Partial discharge | <10 pC |
| Ambient temperature | −30 °C to +50 °C |
| Altitude | ≤2000 m |
| Cooling / ingress protection | Air cooled / IP20 (main unit) |
| Container rating | NEMA 3R / C5 |
| Communication | RS485 / Ethernet · Modbus RTU/TCP · IEC 104 · IEC 61850 |
Values are nominal. 98.5% is the peak efficiency figure. Efficiency at part load is lower, and the figure to use in a savings calculation is the one read off the efficiency curve for the offered unit at your operating point, not this peak. Harmonics, overload and fault ride-through require testing under agreed conditions, and fault ride-through requires coordination with the energy storage system. Unlisted parameters should not be assumed compliant.
A released rating can be quoted before certification is complete. Where a project requires a certified unit, we say so in the proposal rather than afterwards.
Built from modules, with one spare in every string.
Each phase is a chain of nine two-in-one modules, each containing two identical submodules — 18 submodules per phase, one of them redundant. Per-phase cascading is what lets a single failed module be bypassed instead of taking the unit offline.
17 + 1 per phase
18 submodules per phase including one redundant module. Redundancy is a module count, not a claim about availability — actual availability depends on the redundancy strategy in your design.
Two-in-one modules
Nine two-in-one modules per phase, each containing two identical submodules. Fewer connectors and a shorter power path than discrete modules.
Online bypass
The design aims to reduce the effect of a module fault on delivery. Bypass conditions, derating and protection logic must be validated per project.
| Indoor core cabinet | 4700 × 1450 × 2300 mm · approx. 6 t · IP20 |
| 20-foot container solution | 6058 × 2438 × 2591 mm · NEMA 3R / C5 |
| Container contents | SST, fire protection, HVAC cooling |
| Derating above 40 °C | −0.5 MW per further 5 °C |
Final enclosure, weight, lifting points and interfaces follow approved customer drawings.
The SST is one layer, not the whole answer.
In an AI data centre the SST handles primary conversion, while storage, static var generation, high-voltage drives and an EMS coordinate around it. Each function sits in its own layer with its own protection boundary.
SST — primary conversion
MV AC to 800 VDC, with voltage regulation, power factor control and modular protection.
Energy storage PCS / BESS
Dynamic buffering and backup support. Capacity and connection point configured per project — and required for fault ride-through.
SVG — power quality
Campus-level reactive power and voltage support at the point of common coupling.
Drives + EMS
Energy efficiency for chiller pumps and fans, plus unified monitoring and energy dispatch.
Solution boundary: this layered view is a concept, not a standard scope of supply. Protection zones, the 2N strategy, storage connection points and emergency power logic require joint design with the customer.
Three ways to place an SST in a live facility.
The choice follows your POD design, redundancy strategy and retrofit scope — not a vendor preference. These are discussion models; the final architecture depends on your reliability target and site conditions.
One SST per POD
Dedicated conversion close to the load. Smaller fault domain, and capacity can be added POD by POD as phases come online.
Several SSTs, one DC bus
Multiple units feed a centralised DC bus. Requires parallel operation, coordinated protection and an availability design that is agreed up front.
Keep one path conventional
Retain one side of the existing 2N pair and add SST on the other. Limits the risk of a one-time retrofit while the new path proves itself.
Medium-voltage charging, without the substation between.
The SST takes 10–35 kV directly and puts out adjustable DC. The line-frequency transformer and its building disappear from the layout.
Direct MV connection
10 kV or 35 kV in, adjustable high-voltage DC out. No step-down transformer, no separate LV room.
Bidirectional by design
Vehicle-to-grid is a control mode, not extra hardware. Energy flows back during peak hours.
PV and storage on the DC bus
Solar and batteries connect to the same DC ports, so the site runs as one energy hub rather than three systems with three meters.
Typical megawatt charging configuration. Actual power, voltage and port count are set per site.
One platform, in the field since 2017.
The SST we supply is not a new design. It is a platform that has been through successive field generations, each one now shipping.
First MV SST
National R&D programme prototype, ±10 kV / ±375 V / 1 MW
DC transformer
±10 kV / ±375 V / 2 MW, demonstration grid
Multi-port router
3 MW IGCT-based DC transformer, park deployment
Data centre SST
3 × 10 kV / 2.42 MVA / 800 VDC, in service since September 2023
SiC generation
10 kV SiC devices, higher switching frequency
800 VDC platform
MW-class cabinets for AI data centres · first export order: four 13.8 kV units, in delivery
- Every entry is programme history of the platform behind our SST range.
- Our own engineering, warranty, commissioning and service sit in front of that platform; the record above is why we can stand behind it.
- Deployment references and type-test records are available under NDA to qualified projects.
- Which ratings we can quote today is stated earlier on this page, revision by revision.
How the pieces connect.
Three reference configurations. Each is a starting point for a system study, not a catalogue item.
Data centre
Renewable plant
EV + PV + storage
Port counts, voltage classes and protection settings are fixed by the system study. We do not quote a combination before that study is done.
Six steps from design target to operating data.
A new platform closes reliability risk step by step. We publish which step each item has reached, so you can see where a claim is backed by a test report and where it is still a design target.
Design & failure analysis
Failure modes identified at design level, before hardware exists.
Component / module testing
Critical components and the module itself validated on the bench.
System-level testing
Full converter behaviour: control, protection, thermal path and bypass.
Third-party validation
Type testing against the standard that applies to the target market.
Demonstration data
Operating record from a live site, over a defined period and load profile.
Failure closure & consistency
Field failures closed out, and production consistency demonstrated across units.
- Voltage and short-circuit capacity at the point of connection
- Load profile, including the transient envelope
- POD and redundancy strategy
- Storage interface and control coordination
- Communication points and protocol list
- Environmental and fire protection requirements
- Certification path and acceptance criteria
- Feasibility discussion — whether the architecture suits your site
- Reference design — system configuration, interfaces and protection zones
- Joint validation plan — agreed milestones where evidence is still missing
- Or an honest "not yet" — if the timing does not work, we say so
A note on where this product actually stands
Two ratings are released and can be quoted, and the platform has units in service and an export order in delivery. What it does not yet have is a type-test certificate, or a place in a cloud operator's volume procurement. We would rather state both halves in the same paragraph than let you discover the second one after the first. If your project needs a type-tested SST for delivery this quarter, we will tell you that we are not there yet.
Quality & Compliance
We publish our certification status, testing capability, and supply chain practices openly. Where we are not yet certified, we say so — and we tell you when we expect to be.
We believe a new supplier should be judged on what it can prove, not on what it claims.
Certification Roadmap
The table below lists every standard relevant to our products, our current status against each, and our expected completion date. We update it as things change.
Register last reviewed 11 November 2026. A revision date is added to each row when supporting evidence is issued.
| Standard | Description | Model / applies to | Target market | Status | Evidence held | Revision |
|---|---|---|---|---|---|---|
| IEC 62619 | Safety requirements for industrial lithium batteries | ESS | EU · UK · AU | In Progress | No certificate held — test report pending | — |
| UN 38.3 | Transport testing for lithium batteries | ESS | All export markets | Not started | No test summary held | — |
| IEC 62477-1 | Safety of power electronic converter systems | PCS · SST | EU · UK | In progress | No certificate held — type testing under way for 13.8 kV / 3.5 MW and 10 kV / 2.5 MW | — |
| IEC 61439 | Low-voltage switchgear and controlgear assemblies | LV Switchgear | EU · UK · MENA | Designed to | No certificate held — assemblies designed to IEC 61439 / GB 7251; verification per project | — |
| CE Marking | European conformity | All | EU · EEA | Not started | No declaration of conformity issued | — |
| ISO 9001 | Quality management system | Company | Company-wide | Not started | No certificate held | — |
Documents are published here as they are issued. Until a certificate exists, the register says so rather than leaving the row blank — a blank cell is the most common way a supplier implies a certification it does not hold. To request the documents available for a specific model and market, contact us.
Test & Validation
We validate our products against the conditions our customers actually operate in — not only the conditions that are easy to pass.
- In-house test capability —— test equipment configured per product line
- Third-party laboratories —— named laboratories selected per certification project
- Validation items — cycle life, capacity retention, thermal behaviour, EMC, dielectric strength, protection and fault isolation
Quality Management
Quality is controlled at every stage — incoming, in-process, and outgoing — with records retained so that any unit can be traced back to its component batch.
| ISO 9001 | Not started |
| Field defect target | Set per customer requirement |
| Outgoing pass rate | Unit-by-unit outgoing inspection |
| Record retention | Per customer and regulatory requirement |
Supply & Warranty
Our partners need to plan around us. This page states what we can commit to, so you can plan accurately.
| Monthly capacity | Scheduled against confirmed orders |
| Sourcing strategy | Critical components dual-sourced wherever viable |
| Standard lead time | Confirmed per order |
| Warranty | Agreed per product and project |
| End-of-support policy | Spare parts and firmware support are provided for each product line, with the duration agreed per product. |
If we discontinue a product line, we commit to supplying spare parts and firmware support after the last shipment, for the period agreed per product. We would rather state this now than leave our partners exposed later.
How a project is documented — and what we can share today.
We have no named customer case studies yet. The platform behind our SST line does have units in service and an export order in delivery — those are described on the SST page, without customer names. Rather than fill this page with stock imagery and anonymous logos, we describe the structure every project file follows, and we will publish documented cases here as soon as customers agree to be named.
The load, the site and the constraint that makes the project worth doing.
What LumiVolt supplies, what the partner supplies, and where the interface sits.
The power path, drawn against the operating envelope rather than a catalogue.
Which items are type-tested, which are project-specific, and what evidence exists.
Measured against an agreed baseline, with the calculation method documented first.
Diagrams on this site are illustrative architectures, not photographs of commissioned installations. Any figure in a proposal states its conditions.
Illustrative project path, not a customer case.
We publish a case only with the customer’s permission and the measured result attached.
No customer name, site or outcome is presented here. The path shows what evidence a case would need to contain.
About Us
Lumivolt Energy was founded in 2026. We build energy storage, power distribution, and power electronics — and we build them to work as one system.
We are an export-first company. Commercial coordination runs from our Singapore office, which puts us in the same time zone as most of our buyers and one working day closer to them than a mainland-only setup would be. Engineering, testing and manufacturing sit with our own team, so the people who answer your first question are the people accountable at shipment.
Focused engineering. Clear responsibility. We bring storage, conversion and distribution expertise together around each application — and we say plainly where we are on the path, because our partners will find out anyway.
What we bring is not history. It is a focused team, a clear product direction, and a commitment to telling you exactly where we stand — including the parts that are not finished yet.
We are building for international partners who value responsiveness and straight answers over scale. If that describes how you like to work, we should talk.
Our founding team brings hands-on experience across the disciplines that matter for this product:
- Battery systems and BMS development
- Power electronics and conversion
- Medium-voltage power conversion and SST architecture
- Low- and medium-voltage electrical distribution
- International project delivery and export operations
- Quality management and certification
Our core functions are organised as: R&D · Quality · Supply Chain · Export Sales. Engineering decisions are made by engineers, and technical questions reach them directly.
Our mission is to make energy systems easier to adopt, integrate and operate — from solar-powered buildings to critical digital infrastructure.
Our vision is a future where clean energy and critical infrastructure are connected through efficient, adaptable power systems.
Integration
Performance
Partnerships
Long-term operation
From requirement to shipment, in five stages
This is the sequence every project follows. It is short on purpose — each stage has one owner and one output, and nothing moves forward until the previous stage is signed off.
Requirement
Target market, applicable standard, operating envelope, and delivery boundary are agreed before design starts.
Architecture
Electrical topology, thermal path, and control strategy are decided together, not one after another.
Prototype
Critical components are validated first, then the prototype is assembled — so defects surface in the lab, not in the field.
Validation
Bench testing first, then type testing at an accredited laboratory against the standard that applies to your market.
Delivery
Production is scheduled against confirmed orders, and every shipment leaves with its documentation, labelling, and technical handover.
Lumivolt Energy founded
Website launched and export channels opened
This list will keep growing. We update it as milestones are reached.
1. We say what we can do — and what we cannot.
2. We acknowledge enquiries within one business day.
3. We never commit to a lead time we cannot hold.
4. We publish our certification status, including what is still missing.
5. We label development-stage products as development-stage.
News & Insights
Company updates, certification progress, exhibitions, and technical notes on energy storage, power distribution, and solid-state transformer architecture.
Full technical notes
Longer pieces for engineers evaluating an architecture, a control strategy, or a sizing assumption. Each states its own caveats and does not oversell.
Why replacing the line-frequency transformer changes data centre power design
The transformer is not failing. It simply does nothing except change voltage, and at modern rack densities that is no longer enough.
Read the full noteGrid-forming and grid-following: the distinction that decides what a converter can be trusted to do
The two terms describe control behaviour, not marketing tiers. The difference shows up at the point of connection, under conditions the grid does not announce in advance.
Read the full noteDepth of discharge: the number that decides whether a storage business case holds
Cycle life quoted on a datasheet is measured at a defined depth of discharge. Change that depth and the number changes — which is why the usable capacity in a proposal is a design decision, not a marketing figure.
Read the full noteEvery article follows this structure
Specific and honest. No hype words.
One sentence stating what changed.
2–4 short paragraphs. Facts and numbers.
What this means for partners. Then a CTA.
Why replacing the line-frequency transformer changes data centre power design
The transformer is not failing. It simply does nothing except change voltage, and at modern rack densities that is no longer enough.
A device that has been correct for a century
The line-frequency transformer does exactly one thing: it changes voltage by the ratio of its turns. It has no control loop, no firmware, no cooling fan. It is passive, extremely robust, and — measured against what it does — remarkably cheap. Any argument for replacing it has to begin by admitting that. The case is not that the transformer fails. The case is that everything around it has changed.
What changed is the load. A rack that drew five kilowatts now draws sixty. Loads that were uniformly AC are increasingly DC-native. And the constraint on a new facility is less often the energy supply than the floor area available for electrical equipment and the capacity the utility is willing to connect. When the binding constraint moves from cost to volume, the arithmetic changes.
Counting the conversions
Conventional data centre power passes through a chain: medium-voltage AC is stepped down to low-voltage AC by the transformer, converted to DC by the UPS rectifier, stored and re-inverted to AC at the UPS output, distributed as AC to the racks, and converted back to DC inside each server's power supply. That is three AC/DC conversions between medium-voltage AC and the DC the silicon actually consumes; the transformer is a fourth stage, but it only changes voltage.
Each conversion costs two to three percent. Multiplied across the chain, three stages at a nominal ninety-six percent each yield roughly eighty-eight percent, before the transformer, cabling and cooling are counted. At ten megawatts of IT load, every percentage point of system efficiency is worth hundreds of kilowatt-hours per day, continuously, for the life of the facility.
A DC link in the middle of the chain removes two of those three conversions. That is the substance of the argument, and it is independent of any question about the transformer itself.
Frequency is what replaces iron
A transformer's core area scales roughly inversely with the frequency it operates at. That single relationship is the whole reason a solid-state transformer can be small. Raise the link frequency from fifty hertz to twenty kilohertz — a factor of four hundred — and the isolating transformer shrinks from a device occupying a room to one occupying a shelf.
What makes the high frequency possible is the switching device. Silicon carbide MOSFETs tolerate higher voltages, higher temperatures, and higher switching frequencies than silicon IGBTs, with lower switching loss. Without wide-bandgap devices, the topology exists on paper but does not pay for itself; with them, the trade becomes favourable.
It is worth being precise about the sequence of benefits. The transformer gets smaller first, because physics forces it. The control benefits come afterwards, because the conversion is now done by electronics that can be told what to do.
What the architecture does not solve
Replacing several passive devices with one active device concentrates failure modes. A transformer fails loudly and rarely; a power-electronic converter has more ways to fail, and some of them are silent. Redundancy therefore has to be architectural: if the facility requires N plus one, that has to come from parallel units or a designed bypass path, not from a hope that the device is reliable enough.
Protection philosophy changes as well. A power-electronic converter limits its fault current deliberately, which means the protection scheme upstream cannot assume the fault currents it was designed around. This is a design task, not a commissioning detail.
And the certification path differs. Medium-voltage power-electronic conversion equipment is assessed under different standards from conventional switchgear, and that assessment takes time. A project that plans for it late will find the equipment ready before the paperwork.
Where it pays, and where it does not
The useful test is whether the conventional chain is actually binding. If floor area is scarce, if conversion losses are a material operating cost, or if the site needs to control power flow in ways a fixed-ratio device cannot — the architecture is worth evaluating on its numbers.
If none of those are true, the conventional chain is likely the cheaper answer, and a supplier who tells you otherwise is selling architecture rather than solving a problem. There is no virtue in a more modern topology that costs more and solves nothing.
Key points
- The transformer is reliable; its limitation is that it cannot be controlled.
- Three AC/DC conversions separate medium-voltage AC from the DC silicon consumes; a DC link removes two.
- Core size scales inversely with frequency, so the isolating transformer's size follows the switching device, not the topology alone.
- Reliability, protection philosophy, and certification all have to be redesigned, not inherited.
What this means for partners
This is the architecture behind our SST platform. Two ratings are available today — 13.8 kV / 3.5 MW (Rev. A7) and 10 kV / 2.5 MW — and the article describes the engineering they share. Certification is a separate track and is not complete; the Quality page lists each standard and its status.
If your facility does not yet feel the constraint described above, the conventional chain is probably the right answer for you now. We would rather say that than sell architecture into a problem that does not exist.
Grid-forming and grid-following: the distinction that decides what a converter can be trusted to do
The two terms describe control behaviour, not marketing tiers. The difference shows up at the point of connection, under conditions the grid does not announce in advance.
What each one actually does
A grid-following converter treats the grid as a reference. It measures the voltage waveform, locks onto its phase with a phase-locked loop, and injects current in step with it. It behaves, electrically, like a current source that has been told what current to produce. Almost all grid-tied solar inverters and most storage PCS units operate this way, and on a strong grid they work extremely well.
A grid-forming converter does the opposite. It synthesises its own voltage and frequency reference and behaves like a voltage source behind a defined impedance. It does not need to be told what the grid is doing; it defines what the local grid is. This is what allows a converter to operate when there is no grid to follow.
The distinction is often introduced as an off-grid topic. It is not. It matters on any connection where the grid is weak, where a high proportion of generation is inverter-based, or where the site has to ride through a disturbance.
Where grid-following runs into trouble
The phase-locked loop is the weak point, and its weakness is proportional to how weak the grid is. A useful measure is the short-circuit ratio: the ratio of available fault current to the rated current of the converter. When that ratio falls — because the grid is remote, or because inverters have displaced the synchronous machines that used to supply fault current — the phase-locked loop has less to lock onto, and stability margins narrow.
In a system where many inverters are following the same weakening grid, the problem compounds. Units that individually behave correctly can interact through the grid impedance and oscillate together at frequencies that no single unit's control was tuned for. This is a system-level phenomenon, and it is not resolved by improving one converter.
The practical consequence is that as inverter-based generation grows, the grid-following assumption — that there is always a strong reference to follow — becomes less safe to rely on.
Fault current is the part nobody plans for
A synchronous machine delivers several times its rated current into a fault, which is exactly what protection relays are built to detect. A grid-following inverter does not. It is a current-limited source: it will hold its output close to rated current and no more, because exceeding its rating would destroy it. To a protection relay set for conventional fault levels, a fault fed only by inverters can look like a mild overload.
A grid-forming converter can be designed to supply a defined fault current contribution — a multiple of rated current for a defined duration — because it is controlling voltage rather than current. That makes protection coordination possible in a way it is not with current-limited sources alone.
This is why the question is asked at design stage and not later. Protection settings, cable sizing, and the choice of converter control all depend on the answer, and changing the answer after the equipment is ordered means changing the equipment.
Inertia, and what it is a proxy for
Rotating machines store kinetic energy in their mass, which resists sudden frequency change. As synchronous generation is displaced by inverters, that natural inertia falls, and the rate of change of frequency after a disturbance rises. Grid-forming converters can emulate inertia by releasing stored DC-link energy in proportion to the frequency derivative, which slows the fall.
The honest caveat is that emulated inertia is bounded by stored energy. It can slow a frequency excursion; it cannot substitute indefinitely for the kinetic energy a large machine would have supplied. Where the requirement is a defined ride-through duration, that has to be stated as a number and matched to the DC-link capacitance, not assumed as a general property.
What to ask a supplier
Ask what the converter does when the grid disappears, not what it is called. Ask for the fault current contribution in multiples of rated current and for how long. Ask whether the unit can form a reference with no other source present, and under what conditions it hands back to the generator or the grid. Ask what the control does when two units disagree about frequency.
A supplier who answers these in numbers is describing a product. A supplier who answers them in adjectives is describing a brochure.
Key points
- Grid-following = current source following a measured reference; grid-forming = voltage source creating the reference.
- The weaker the grid (lower short-circuit ratio), the less safe the grid-following assumption becomes.
- Current-limited inverters can hide faults from protection set for conventional fault levels.
- Emulated inertia can slow a frequency excursion but is bounded by stored energy — state it as a number.
What this means for partners
Our storage and power distribution scope means the converter control choice and the protection coordination are decided by the same team. That matters here specifically, because the two cannot be decided independently — the answer to one constrains the other.
If you are specifying a microgrid, a weak-grid site, or a facility with a high share of inverter-based generation, this is the conversation to have at the beginning rather than at the commissioning checklist.
Depth of discharge: the number that decides whether a storage business case holds
Cycle life quoted on a datasheet is measured at a defined depth of discharge. Change that depth and the number changes — which is why the usable capacity in a proposal is a design decision, not a marketing figure.
The datasheet number has a condition attached
A lithium iron phosphate cell advertised at six thousand cycles is not claiming six thousand cycles under all conditions. It is claiming six thousand cycles at a stated depth of discharge, a stated temperature, a stated charge and discharge rate, and a stated end-of-life criterion — typically a residual capacity of eighty percent of beginning of life. Remove any one of those conditions and the number stops being valid.
This is not a trick. It is how cycle life is defined and tested. The difficulty is that the datasheet number travels into proposals and business cases on its own, detached from the conditions it depends on.
Depth of discharge and cycle life are not linearly related
For a typical LFP cell, cycling to a hundred percent depth of discharge might yield something in the region of three to four thousand cycles, while cycling to eighty percent might yield five to six thousand, and to sixty percent considerably more. The relationship is not proportional: each additional percentage point of depth costs more life than the one before it.
The practical consequence is that two systems with identical nameplate capacity can deliver very different total energy throughput over their lives, depending on where the operating window is set. Since throughput is what the business case is actually paying for, the operating window is a financial parameter, not a technical detail.
A system designed to squeeze out maximum daily throughput will cycle deeper and replace sooner. A system designed for longevity cycles shallower and delivers fewer kilowatt-hours per day from the same hardware. Neither is wrong; they are different products being sold under the same capacity label.
Calendar ageing runs in parallel, not in sequence
Cycle ageing is only half of the picture. A cell also ages with time, whether or not it is being cycled, and calendar ageing proceeds faster at higher state of charge and higher temperature. A battery held at full charge in a warm room loses capacity to calendar ageing even if it never cycles.
This matters for residential systems in particular, where the duty cycle is often light. A household that consumes little may cycle the battery only partially each day, yet still lose several percent of capacity a year to calendar ageing alone. The proposal that models purely on cycles will overstate the life of exactly the systems that cycle least.
The honest way to present this is a life estimate bounded by both mechanisms, with the temperature and state-of-charge assumptions stated. A single cycle count is not an estimate; it is a component of one.
Temperature compounds both
Temperature accelerates both cycle ageing and calendar ageing, and the effect is steeper than most people assume. Roughly speaking, each ten degrees of additional cell temperature can halve the calendar life, and it also degrades cycle life. The two effects apply at the same time, so a hot cell does not merely age twice as fast as a cool one in a single respect — it ages faster along two axes at once.
This is why installation location is an electrical parameter. A ventilated utility room and an unheated summer garage differ by far more than ten degrees for much of the year. The same pack, the same duty cycle, and the same capacity can produce very different service lives purely because of where the cabinet was bolted.
A design that does not ask about the installation location is not a design that has accounted for temperature. It has just left it out.
Reserve bands are designed, not leftover
Not all of a battery's capacity should be available for daily cycling. A band at the top is worth reserving so that unexpected solar generation can be absorbed rather than curtailed, and a band at the bottom is worth reserving so that backup capability remains available when it is needed. Both reduce daily throughput and both extend life.
The point is that these bands should be chosen deliberately, as part of the design, rather than left to whatever the inverter's built-in algorithm happens to do. A default state-of-charge window is a decision that was made by someone, for someone; it is worth knowing who and for what.
What to put in a contract
The measurable commitments are operating window, temperature, and end-of-life criterion. A warranty that guarantees a capacity percentage without stating the state-of-charge window and the temperature range it applies to is guaranteeing something the supplier cannot control and the buyer cannot verify.
The better arrangement states all three, and states what happens when the site's measured temperature or duty cycle falls outside the assumed range. That is not a hostile question. It is the question that separates a warranty designed to be claimed from one designed never to be paid.
Key points
- Datasheet cycle life is valid only at a stated depth of discharge, temperature, rate, and end-of-life criterion.
- Cycle life falls faster than linearly as depth of discharge increases; shallower cycling buys disproportionately more life.
- Calendar ageing and temperature operate at the same time as cycle ageing, not after it.
- Reserve bands reduce daily throughput and extend life — they are a design choice, not a leftover.
What this means for partners
Because storage and distribution come from one scope, the operating window, the thermal design of the enclosure, and the protection coordination are set by the same team that has to stand behind the warranty. That is what makes it possible to quote a capacity figure that is actually achievable in the installation the customer has.
For a distributor, the practical difference is this: a system sized on a realistic depth of discharge may carry a lower headline capacity than a competitor's, and will still be delivering that capacity in year eight while the competitor's has been derated or replaced.
Contact Us
Tell us what you are planning. International enquiries are handled by our Singapore office, and we will help define the next step.
Tell us what you are planning. We will help define the next step.International sales, partner onboarding and project coordination.
Entrepreneur Business Centre
Singapore 415978
- Southeast AsiaSingapore · Malaysia · Vietnam · Indonesia · Thailand · Philippines
- EuropeGermany · Netherlands · Belgium · Austria · Switzerland · United Kingdom
- Middle EastUnited Arab Emirates · Saudi Arabia · Qatar · Kuwait · Oman · Bahrain
- North AmericaUnited States · Canada · Mexico
We are export-first and building long-term brand partnerships, not one-off shipments. All four start the same way: one document that states what is in scope.
Project quotation
Send the load profile, site constraints and target market. You get a configured quotation with model numbers and stated assumptions.
OEM / ODM
Hardware built to your specification and labelling, with the documentation set your market requires.
Channel distribution
Territory agreement, technical training and joint project support. Certification status disclosed per market.
Pilot validation
A validation unit tested under your real operating conditions, with a joint evaluation plan and recorded results.
Company details
| Company | Shenzhen Lumivolt Energy Co., Ltd. 深圳曜驰能源有限公司 |
|---|---|
| Registered address | Room 903, Yinglong Business Building, No. 11 Shangbao East Road, Zijing Community, Lianhua Subdistrict, Futian District, Shenzhen, Guangdong, China 深圳市福田区莲花街道紫荆社区商报东路11号英龙商务大厦903 |
| Office (Singapore) | 18 Kaki Bukit Road 3, #05-17, Entrepreneur Business Centre, Singapore 415978 +65 6514 1618 sales@lumivoltenergy.com |
| Legal representative | Huang Ronghuang(黄荣煌) |
| Registration number | 91440300MAKLU9457E Unified Social Credit Code, registered with the Administration for Market Regulation of Shenzhen |
| Contact | Sales: sales@lumivoltenergy.com · Singapore Technical: tech@lumivoltenergy.com Enquiry form: Contact page |
Responsibility for content
Huang Ronghuang, at the address above.
Consumer dispute resolution
We sell business-to-business and are not obliged, nor do we agree, to participate in dispute resolution proceedings before a consumer arbitration board.
Liability for links
Our website contains no third-party content beyond the external services named in our Privacy Policy. We have no influence over the content of external websites and accept no liability for it. The respective provider is responsible for the content of linked pages.
Copyright
The content and works on these pages are protected by copyright. Reproduction, editing, distribution, and any form of use beyond the limits of copyright law require our written consent.
Last updated: 21 October 2026
Privacy Policy
How we handle personal data when you visit this website or send us an enquiry, under the EU General Data Protection Regulation (GDPR).
1. Controller
The controller responsible for processing personal data on this website is:
Shenzhen Lumivolt Energy Co., Ltd.
Room 903, Yinglong Business Building, No. 11 Shangbao East Road, Zijing Community, Lianhua Subdistrict, Futian District, Shenzhen, Guangdong, China
Email: tech@lumivoltenergy.com
2. What data we process
Enquiry form and email
When you use our enquiry form or write to us, we process the information you provide: the enquiry route and product line you select (solar, data centers or partnership), company name (optional), country or region, your role, application, expected annual volume, target market, and your message, together with your name and the email address or contact details you give us.
Server log data
Our hosting provider records technical data each time the site is accessed: IP address, date and time of the request, the page requested, the amount of data transferred, browser and operating system, and referring page. This data is used to deliver the website and to detect and prevent attacks.
3. Purposes and legal bases
- Answering enquiries and preparing a quotation or contract: Art. 6(1)(b) GDPR (pre-contractual measures).
- Operating the website securely and preventing abuse: Art. 6(1)(f) GDPR (legitimate interest in a secure, functioning website).
- Optional features you actively choose: Art. 6(1)(a) GDPR (consent), which you may withdraw at any time.
4. Cookies and local storage
This website sets no analytics, advertising, or tracking cookies, and embeds no third-party fonts, videos, or maps. We store two values in your browser's local storage:
lumivolt-cookie— records that you have answered the cookie notice.lumivolt-lang— records your language choice.
Both are technically necessary to remember your choice and are not transmitted to us. You can delete them at any time in your browser settings.
5. Recipients and international transfers
We do not sell personal data. Data is processed by the following service providers strictly as needed:
- Alibaba Cloud (Object Storage Service, Hong Kong) — website hosting and server logs.
- Tencent Exmail — receiving and storing business email.
- Web3Forms (Web3Creative, India) — receiving and forwarding enquiry-form submissions to our mailbox; submissions are handled through its servers before delivery.
Our company and these providers are located outside the European Economic Area — in mainland China, Hong Kong, Singapore and India. Where personal data originating in the EEA is transferred, we rely on appropriate safeguards under Art. 46 GDPR, including standard contractual clauses, or on your consent or the necessity of the transfer for the performance of a contract.
6. Retention
Enquiry data is kept for as long as needed to handle your request and any resulting business relationship, and afterwards only as long as statutory retention obligations require. Enquiry-form submissions are also held by our form-processing provider for no longer than three years, after which they are deleted automatically. Server logs are kept for a short period for security purposes and then deleted or anonymised.
7. Your rights
You have the right to:
- access the personal data we hold about you (Art. 15 GDPR);
- have inaccurate data corrected (Art. 16 GDPR);
- have your data erased (Art. 17 GDPR);
- restrict processing (Art. 18 GDPR);
- data portability (Art. 20 GDPR);
- object to processing based on legitimate interests (Art. 21 GDPR);
- withdraw consent at any time, without affecting the lawfulness of processing before withdrawal (Art. 7(3) GDPR);
- lodge a complaint with a supervisory authority in your country of residence (Art. 77 GDPR).
To exercise any of these rights, email us at tech@lumivoltenergy.com. We respond within one month.
8. No automated decision-making
We do not use your data for automated decision-making, including profiling, within the meaning of Art. 22 GDPR.
9. Changes to this policy
We update this policy when our processing changes. The version published here applies.
Last updated: 21 October 2026



