POWER ELECTRONICS · MV TO 800 VDC

Smarter energy for homes and businesses.
Integrated power for data centers.

Explore solar and storage solutions, alongside advanced power architecture for critical digital infrastructure.

Singapore office · +65 6514 1618 · sales@lumivoltenergy.com

Own engineering and manufacturing Certification status published openly Acknowledged within one business day
Global operations

Coordinated from Singapore. Delivered by our own engineering team.

Our Singapore office handles commercial enquiries, partner onboarding and project coordination for international buyers. Design, testing and manufacturing stay in one technical team — so the engineer who answers your first question is the one accountable at shipment.

Regional office
Singapore

International sales, partner onboarding and project coordination.

Address18 Kaki Bukit Road 3, #05-17
Entrepreneur Business Centre
Singapore 415978
Time zoneGMT+8 · Asia/Singapore
Talk to the Singapore office →
What happens after you contact us
  1. Confirmed within one business dayYour enquiry goes to a named engineer, who reviews the application, target market and applicable standard.
  2. A scoped answer, in writingConfiguration, interface boundary and lead time — stated before you commit to anything.
  3. Proposal, and where it fits a validation unitFor pilots we ship a unit built to your operating envelope, not a brochure.

Markets: Southeast Asia · Europe · Middle East · North America

Shared engineering

Power systems designed to work together.

Integration is not a slogan here — it changes what a proposal has to define, and who is answerable for it.

Coordinated interfaces

Storage, conversion and distribution are specified against the same operating envelope, not assembled from separate catalogues.

Clear scope

The proposal states what we supply, what the partner supplies, and where the interface sits — before the project starts.

Application-led engineering

The starting point is the load profile and the site constraint. The product configuration follows.

Solid-State Transformer

Fewer conversion stages. One controllable device.

Our SST platform converts medium-voltage AC to 800 VDC through cascaded active rectification and isolated high-frequency DC/DC. Two ratings are available today: 10 kV / 2.5 MW and 13.8 kV / 3.5 MW. Certification status is published separately, item by item.

See SST architecture →

Built to be verified.

Certification status, test data, and supply chain traceability — published, not promised.

See Quality & Compliance →

Tell us what you are planning.

Quotations · OEM / ODM · Distribution partnerships. We acknowledge enquiries within one business day.

Explore a Partnership →
Home / Solutions

Solutions

We organise our work by application, not by part number. Find the scenario that matches your project — then talk to our engineers about the details.

Home / Solar Solutions

Make more of your solar energy.

Coordinated solar, storage and power management for homes and businesses.

How the pieces fit together

A solar system is not a list of boxes.

Generation, storage, conversion and distribution have to be specified against the same load — and against the same operating envelope.

PV generation Grid interface Hybrid inverter / PCS Conversion and control Battery storage LV distribution Protection and metering Loads Home or business

Swipe to see the full diagram →

Illustrative layout. The actual configuration depends on site conditions, the connection agreement and the agreed scope.

From assessment to delivery

A proposal built around your site.

Savings and resilience depend on configuration, operating conditions and the agreed scope. We assess first, then specify.

01

Assess

Load profile, tariff, existing electrical arrangement and critical loads. For residential: roof, consumption pattern and backup priorities.

02

Design

System size, storage duration, protection and interfaces — against the operating conditions of the site, not a template.

03

Validate

Approved configurations only. Ratings, compatibility and protection settings are checked against product evidence — not assumed.

04

Deliver

The proposal defines equipment, installation responsibilities, compatibility and support — including what the partner supplies.

What is in the scope

Know exactly what is included.

Your proposal defines equipment, installation responsibilities, compatibility and support. The table below states which parts we supply, which are optional and which sit with your installer or developer.

PV modules Partner-supplied If your project includes PV, it is supplied by you or your installer — or we can introduce a partner.
Inverter / PCS Included Hybrid inverter or PCS selected from approved models, matched to the storage configuration.
Battery system Included LFP modules with integrated BMS, enclosure and thermal design for the target market.
LV distribution & protection Optional Optional integrated low-voltage distribution, so storage and protection are specified together.
EMS & monitoring Included Energy management and monitoring, with data the household can read and the installer can act on.
Installation & commissioning Partner-supplied Carried out by your approved installer. We provide commissioning checklists and technical support.
Grid connection application Customer / developer Usually the customer’s or developer’s responsibility. We supply the technical documentation to support it.

Where a project crosses these boundaries, we document the interface rather than assuming it. Scope is confirmed per project in writing.

Tell us about your site.

We acknowledge enquiries within one business day. Technical assessment timing is confirmed after we have reviewed your requirements.

Request a Solar Assessment →
Home / Solar Solutions / Residential ESS

Use more of the energy your home generates.

Match solar generation, battery storage and backup priorities to the way your household uses power.

What changes at home

Three outcomes a coordinated system is designed to deliver.

Each one depends on the configuration and the conditions at your site — not on a brochure claim.

✓

More self-consumption

Store surplus daytime generation and use it in the evening, instead of exporting it at a low tariff. The usable share depends on load profile, tariff and battery size.

✓

Clear visibility

Monitoring shows generation, storage and consumption separately, so you can see what the system is doing rather than inferring it from a bill.

✓

Backup that is defined, not promised

We list which loads are backed up and for how long, then specify the transfer arrangement. Backup is a design decision, not a blanket claim.

Find a configuration that fits your home

Approved models are released market by market.

Every proposal states the exact model and the five figures below. If a figure is still under test, the proposal says so.

✓

Usable capacity (kWh)

Usable, not nameplate — stated at the agreed depth of discharge and end-of-life criterion.

✓

Continuous power (kW)

Continuous output at the stated ambient temperature; the overload window is stated separately.

✓

Phase and connection

Single-phase or three-phase, and the grid connection arrangement the model is approved for.

✓

Backup limit

Which loads can be backed up, the transfer time, and the maximum backed-up power.

✓

Market availability

The markets where the model is released, its certification status, and the lead-time basis.

✓

What we will not do

We will not quote a rating that is not approved for your market. If a figure is still under test, the proposal says so.

Typical Configuration
Usable capacityMultiple capacities (per project)
ChemistryLFP
InstallationWall-mounted / floor-standing
ConfigurationSingle-phase / three-phase
Certification Status

See our published Certification Roadmap — including what is still in progress.

What We Deliver
  • Battery modules and packs with integrated BMS
  • Hybrid inverter / PCS for grid-tied and backup operation
  • Optional integrated low-voltage distribution
  • Monitoring and energy management
  • Datasheets, installation documentation, and technical support
Who This Is For

Installers, distributors, and OEM partners serving residential markets.

Deep dive

What actually determines a residential storage outcome

Home energy storage has a marketing problem. On paper the pitch is simple: store the electricity you generate, use it when you need it, buy less from the grid. In practice, most homeowners who buy a battery system discover three things within the first month — it was harder to install than the brochure suggested, it does less than they expected, and nobody will tell them plainly what it will actually save.

For distributors and installers, the consequences are more concrete. Callback rates rise. Commissioning takes longer than quoted. And when something goes wrong, the installer is stuck mediating between a battery supplier, an inverter supplier, and whoever built the distribution panel — none of whom consider the problem theirs.

There is a structural reason for this. Residential storage is sold as a product but delivered as a system: cells, a converter, a distribution interface, a monitoring layer, and an installation. The product is chosen in a showroom and the system is commissioned in a garage. Most of what determines the outcome happens on the system side, where the buyer has the least visibility.

This page sets out what a residential storage project actually depends on, and where an integrated approach changes the arithmetic.

Read the detailed engineering discussion

The three failure modes we see most often

The interface problem.

Battery, inverter, and low-voltage distribution are typically sourced from three different manufacturers. Each works correctly on its own. The problems appear at the boundaries: communication protocol mismatches, conflicting protection settings, and coordination of charge and discharge limits. When these surface, each vendor can reasonably claim their product is behaving as specified.

The sizing problem.

Storage is often sized on a rule of thumb rather than on the household's actual load profile. A system that is too small cycles to its limits every day and degrades faster than expected; one that is too large never reaches an economical depth of discharge. Neither outcome is obvious from the specification sheet.

The service problem.

When a system is assembled from parts, warranty responsibility is fragmented. A fault in month fourteen means the homeowner, the installer, and three suppliers all need to agree on whose part failed before anything gets repaired.

What an integrated approach changes

One responsible party.

Storage, conversion, and low-voltage distribution come from one supplier, under one warranty, with one technical contact. The homeowner and the installer each have exactly one number to call.

Interfaces designed once.

Because the same engineering team specifies the battery, the converter, and the distribution stage, communication and protection coordination are resolved in design rather than in the field. Commissioning becomes a checklist rather than a negotiation.

Sizing based on the load profile.

We ask for twelve months of consumption data, or install monitoring first, before recommending a capacity. The objective is not the largest system the roof can support — it is the smallest system that delivers the outcome the household is actually paying for.

Honest performance expectations.

We will tell you when storage is not the right investment for a particular household — for example where consumption is low, the tariff is flat, or the roof orientation limits generation. A project that should not have been sold costs more in reputation than it earns in margin.

Typical configurations

Single-phase, 5–10 kWh

Apartment or small house with a balcony solar system. Wall-mounted, single-phase, sized for evening and overnight load shifting rather than full independence.

Three-phase, 10–20 kWh

Detached house with a rooftop array and an electric vehicle. Three-phase connection, higher continuous output, and integrated low-voltage distribution so the storage and the main panel are delivered as one coordinated package.

Retrofit onto an existing PV system

For households that already have panels but no storage. The critical question here is inverter compatibility — we ask for the existing inverter model and generation data before quoting, rather than after.

Technical read: the four parameters that decide whether the numbers hold

Depth of discharge, not nameplate capacity, sets cycle life.

A cell rated for thousands of cycles at eighty percent depth of discharge will deliver materially fewer at one hundred percent. This is why the usable capacity we quote is a design decision rather than a marketing figure, and why the reserve floor is set deliberately rather than left to the algorithm inside the inverter.

Temperature drives both calendar ageing and cycle ageing, and the two compound.

A pack held at thirty-five degrees ages several times faster than one held at twenty degrees, even at identical throughput. Installation location is therefore an electrical parameter, not a matter of convenience. We ask where the unit will live before we recommend a chemistry or a capacity.

Round-trip efficiency is quoted at the best point on the curve, not at the point your system will actually operate.

Real efficiency depends on part-load behaviour, stand-by consumption, and how much time the system spends at low state of charge. We publish the curve rather than a single peak figure, because the peak figure is the one that almost never occurs in service.

Backup changeover time has to be matched to the loads that matter.

A server rack, a sump pump, and a heating controller have entirely different tolerance to a supply interruption. Rather than claiming a single milliseconds figure, we map the critical loads first and then specify the transfer arrangement that actually protects them.

Integration considerations

Protection coordination.

Adding storage behind the meter changes fault current levels and protection requirements. This has to be evaluated at the design stage, not discovered during commissioning.

Thermal environment.

Where the system is installed matters as much as what is installed. A unit in an unheated garage in a cold climate will behave differently from one in a ventilated utility room — we ask about the installation location before recommending a configuration.

Grid connection rules.

Export limits, anti-islanding requirements, and registration obligations vary by country and frequently change. We confirm the applicable rules for your market before finalising a design.

Monitoring and data.

The system should produce data the household can understand and the installer can act on — not a dashboard only an engineer can read.

Common questions

Can a battery system work without solar panels?
Yes, but the economics change substantially. Without generation, storage only shifts consumption from expensive hours to cheap ones. That can be worthwhile on a dynamic tariff with a large peak-to-offpeak spread; it is rarely worthwhile on a flat tariff.
How long does installation take?
For a plug-in or wall-mounted configuration, typically half a day once the site is prepared. For three-phase installations with integrated distribution work, plan for a full day. We provide a commissioning checklist so the installer knows in advance what will be required.
What happens at end of life?
We publish an end-of-support policy covering spare parts availability and firmware support periods after the last shipment. We would rather state this now than have a partner discover it later.
Which markets do you support?
We confirm market-by-market, based on the certification status and grid connection rules applicable to each. Our certification roadmap is published on the Quality page and updated as statuses change.
Home / Solar Solutions / C&I ESS

Put your site’s energy to work.

Coordinate solar generation and storage around your operating profile, energy costs and critical loads.

Where it pays back

Three common starting points.

The assessment decides which one applies — and whether storage is the right answer at all.

Peak demand

Shift load away from the billing peak and hold the demand window below an agreed threshold.

Power quality and ride-through

Support voltage-sensitive processes through dips and short interruptions, within a defined operating envelope.

Capacity and expansion

Defer or avoid an upstream upgrade by adding storage at the constrained point, where the site supports it.

A proposal built around your site

We assess first, then specify.

Share your load data, tariff, electrical arrangement and project objectives. We will tell you what can be quoted and what needs a site assessment.

01

Assess

Interval load data, tariff, single-line diagram, protection settings and project objectives.

02

Design

System size, duration, protection coordination and interfaces against the site’s actual operating conditions.

03

Validate

Approved configurations only. Ratings and protection settings checked against product evidence.

04

Deliver

Scope table, installation responsibilities, commissioning checklist and support.

A proposal built around your site.

Savings and resilience depend on configuration, operating conditions and the agreed scope. We assess first, then specify.

Request a Site Assessment →
What the business case depends on

A documented assessment, not a headline savings figure.

Any number is stated with its inputs and assumptions.

Load profile

Interval data and operating hours — not a monthly bill.

Tariff structure

Energy, demand and export rates, including time bands.

Specific yield

Local irradiance, orientation, tilt and shading.

Degradation

Cell degradation and system availability over the assessment period.

Capex

Equipment, installation and grid-connection scope.

Maintenance

Routine service, replacement and monitoring costs.

No savings figure is guaranteed before a contract and a defined operating period are in place.

Capacity by duty

Savings only hold if the system is sized to the duty it actually runs.

The capacity range follows from what the storage has to do, not from the price list. Three common duties, and the checks we run behind each one before a return figure is quoted.

Duty Capacity range Typical application
Peak shaving 100 kWh – 1 MWh Manufacturing and logistics parks with a pronounced demand peak. Cabinetised, low-voltage connection, controlled from interval metering data.
Power quality and backup 200 kWh – 2 MWh Sites where one power-quality event stops production. Storage carries demand management plus dip and interruption ride-through.
Containerised storage 1 MWh and above Larger industrial sites and parks, typically medium-voltage connection with multiple load centres.
Engineering checks behind the return
  • 15-minute demand window
  • Rack balancing and circulating current
  • Cooling matched to climate and duty
  • Transformer and protection overload limits

Cooling selection includes temperature uniformity, pump and coolant maintenance, and local service capability.

Typical Configuration
Capacity rangekWh to MWh scale (per project)
EnclosureCabinetised / containerised
CoolingAir or liquid cooled (per project)
Grid connectionLow-voltage, optional MV integration
Certification Status

See our published Certification Roadmap — including what is still in progress.

What We Deliver
  • Cabinetised or containerised battery systems
  • PCS and energy management system
  • Low-voltage switchgear and distribution integration
  • Site-level monitoring and remote diagnostics
  • Commissioning and after-sales support
Who This Is For

EPCs, system integrators, and industrial end users.

Deep dive

Why commercial storage projects stall

Commercial and industrial storage has a stronger business case than residential storage — the loads are larger, the tariffs are more complex, and the savings are easier to quantify. It also has a longer list of ways to fail.

Most C&I projects do not fail because the battery was wrong. They fail in the space between disciplines: the electrical study that was never done properly, the protection settings nobody coordinated, the load profile that was estimated rather than measured, and the commissioning that revealed all three at once.

There is a pattern in how these projects are sold. The savings are modelled from the tariff schedule, a published document, rather than from the site's metered behaviour, which is not published and not always collected. A tariff-based model always produces a clean number. Whether that number survives contact with the real load profile is a separate question, and it is usually answered after the equipment has been ordered.

This page sets out where the risk actually sits in a C&I project, and how an integrated supply scope reduces it.

Read the detailed engineering discussion

Where C&I projects actually go wrong

Load profiles estimated rather than measured.

Peak demand determines both the value of the system and the sizing of every component behind it. When the profile comes from a utility bill and a guess, the resulting design is optimised for a site that does not exist. We ask for interval meter data before sizing anything.

Protection coordination treated as an afterthought.

Adding storage to an existing low-voltage installation changes fault levels and may require changes to upstream protection. If this is not analysed at design stage, it surfaces during commissioning — at which point the fix is expensive and the schedule is already lost.

Scope boundaries left undefined.

Who supplies the switchgear? Who configures the EMS? Who signs off the grid connection application? On a project with three or four suppliers, every boundary is a place where responsibility can be dropped. On a single-scope project, there is nowhere for it to be dropped.

Our approach

Electrical study first, equipment second.

We start from the site's actual load profile, fault level, and existing protection arrangement. The equipment list follows the study, not the other way round.

Storage and distribution from one scope.

Battery systems, PCS, and low-voltage switchgear come from a single supplier under a single warranty. This removes the most common boundary failure in C&I projects.

Defined interface documentation.

Where third-party equipment is involved — existing transformers, generators, building management systems — we document the interface explicitly: protocol, data points, responsibility for configuration.

Commissioning planned before shipment.

A commissioning checklist is prepared during design, not written on site. Issues found during the checklist are engineering problems; issues found after handover are warranty claims.

Typical configurations

Peak shaving, 100 kWh to 1 MWh

Manufacturing and logistics sites with a pronounced demand peak. Cabinetised, connected at low voltage, controlled against the site's interval meter data.

Power quality and backup, 200 kWh to 2 MWh

Sites where power quality events cause production losses. Storage provides both demand management and ride-through against voltage dips and short interruptions.

Containerised, 1 MWh and above

Larger industrial sites and campus installations, often with medium-voltage connection and multiple load centres.

Technical read: four things that quietly break a C&I business case

Demand charges are measured over a rolling window, not at an instantaneous peak.

A fifteen-minute demand window means the controller's objective is to hold the average below a threshold across the whole window, not to clip the tallest spike. Systems tuned to clip instantaneous peaks underperform on demand charge reduction, and the error stays invisible until the first utility bill arrives.

Parallel battery clusters need current sharing designed in.

Where several clusters sit on a common DC bus, small differences in internal resistance or state of charge produce circulating current that does not appear in the total power figure. Cluster-level management and per-cluster current limiting are what keep the array balanced; without them, the weakest cluster sets the life of the whole system.

Liquid cooling and air cooling trade different problems rather than solving the same one.

Air cooling is simpler and cheaper, but struggles to hold a tight temperature spread across a large pack in a hot climate. Liquid cooling holds cell-to-cell spread closer, at the cost of pumps, coolant circuits, and a maintenance item that field staff must be trained for. The choice should follow the duty cycle and the ambient condition, not the price list.

Converter overload capability and transformer capacity have to be sized together.

A converter that can carry one hundred and ten percent for ten seconds is useful only if the upstream transformer and protection can accommodate that current without tripping. Where the two are procured separately, the overload figure is often quoted by one supplier and quietly invalidated by the other.

Integration considerations

Grid connection and approval.

In most markets the connection application requires electrical drawings, protection settings, and sometimes a grid study. This is a schedule-critical path and should start early.

Existing protection arrangement.

Where the site already has discrimination settings in place, adding storage may require re-coordination. We map the existing arrangement before proposing a design.

Fire safety and separation.

Enclosure placement, separation distances, and detection requirements are determined by local code and by the system's chemistry and capacity. We confirm requirements for your jurisdiction rather than assuming.

Operations and monitoring.

A C&I system needs to be operable by the site's own staff. We specify what the operator will see and act on, and what escalates to us.

Common questions

What data do you need to size a system?
Interval meter data covering at least twelve months, the site's single-line diagram, existing protection settings, and the connection agreement. Without these, any sizing figure is an estimate and should be treated as one.
Can storage be added to a site with an existing generator?
Yes, but generator and storage control must be coordinated explicitly — otherwise they can fight each other during transitions. This is a control design question, and we address it at the specification stage.
How is performance measured?
Against an agreed baseline from the site's own meter data, with the calculation method documented before commissioning. If the baseline is not agreed in advance, the savings figure is not verifiable.
What about sites in multiple countries?
We confirm certification status and grid connection rules market by market. Our published certification roadmap shows what is complete and what is still in progress, so you can plan accordingly.
Home / Solutions / Microgrid & Off-grid

Microgrid & Off-grid Power

For sites where the grid is weak, expensive, or absent — we combine storage, power conversion, and distribution into a single coordinated system, delivered as one package with one point of responsibility.

Where This Is Used
Remote telecom sites—
Islands and coastal communities—
Agricultural and irrigation sites—
Mining and construction camps—
Backup power for critical facilities—
Certification Status

Grid-forming capability: please confirm your specific requirements with our engineering team.

What We Deliver
  • Battery storage systems
  • Power conversion, including grid-forming capability where applicable
  • Low-voltage distribution and protection
  • Energy management and remote monitoring
  • Configuration engineering for site-specific requirements
Who This Is For

Telecom operators, project developers, EPCs, and NGOs running off-grid programmes.

Deep dive

Designing for sites the grid does not reach

Off-grid and weak-grid projects are unlike anything else in the storage business. There is usually no utility to fall back on, no second attempt at commissioning, and no possibility of calling an engineer to site next week. The system either works in the conditions it was designed for, or the project fails visibly and expensively.

These projects also attract the most optimistic assumptions. Load growth is underestimated. Diesel consumption is understated. Ambient temperatures are taken from a regional average rather than from the equipment enclosure. Fuel logistics are planned for the first year and forgotten afterwards.

What makes this harder is that the feedback loop is long. On a grid-connected project, a design error shows up as an underperforming bill within a month. On a remote site, the same error may take two years to surface, by which time the commissioning team has moved on and the maintenance team is working with whatever documentation survived the handover.

This page sets out how we approach off-grid design, and where we say no.

Read the detailed engineering discussion

Where off-grid projects fail

Load assumptions that describe a site nobody has visited.

Off-grid loads are frequently estimated from a template — so many kWh per household, so many per telecom site. Real sites have seasonal variation, unexpected additions, and loads that run at times nobody anticipated. We insist on measured data or a monitored trial period before committing to a design.

Maintenance modelled for year one only.

A system designed for the commissioning year will be undersized by year four. Loads grow. Panels degrade. Batteries lose capacity. The design has to account for the site's trajectory, not its opening state.

No defined escalation path.

Many remote sites are hundreds of kilometres from the nearest qualified technician. If the design assumes a site visit can happen within a week, it is not an off-grid design — it is an on-grid design in a remote location. Remote diagnostics and guided local intervention have to be built in from the start.

Our approach

Measured before designed.

We prefer to instrument a site and collect data for a period before sizing anything. Where monitoring is genuinely impossible, we design with explicit margin and document the assumptions on the drawing.

Design for year five, commission for year one.

Capacity planning accounts for expected load growth and degradation. Where growth is uncertain, we design for modular expansion rather than over-sizing from the start.

One scope, one responsibility.

Storage, conversion, and distribution from a single supplier. On a remote site, the cost of a boundary dispute between two vendors is measured in months, not days.

Remote-first service model.

Diagnostics accessible without a site visit, clear guidance for local staff, and an honest statement of what can and cannot be resolved remotely.

We decline projects we cannot support.

If the logistics, the climate, or the service distance make a project one we cannot properly stand behind, we say so before the order rather than after.

Typical configurations

Telecom and remote infrastructure

Small-to-medium storage with solar, sized to replace a defined proportion of diesel runtime rather than all of it. Defined maintenance intervals and remote monitoring are part of the scope.

Island and coastal community systems

Larger systems where storage forms the grid. Load management, phased connection of users, and clear operator training matter as much as the equipment specification.

Agricultural and productive-use sites

Storage supporting irrigation, processing, or cold chain — where an outage has a direct cost in spoiled produce or lost output. Duty cycle and seasonal variation drive the sizing.

Technical read: the four control questions an off-grid design must answer

Grid-forming control is not grid-following with a different label.

A grid-forming converter establishes voltage and frequency and must supply the fault current the protection scheme expects; a grid-following unit measures an existing reference and follows it. Where storage forms the grid, the converter has to synthesise a stiff reference and remain stable when a large motor starts. Droop settings and virtual inertia are what make that possible.

Diesel displacement is a ratio, not a switch.

Where a generator remains, the useful question is what proportion of running hours storage can replace. Generator hours are usually dominated by light-load running, where the machine is inefficient and wears quickly. Targeting those hours first delivers most of the fuel saving for a fraction of the storage capacity.

State-of-charge operating windows are designed, not defaulted.

A system that charges to full and discharges to empty every day will not last the term of the service agreement. Reserving an upper band for solar absorption and a lower band for unexpected load keeps the battery inside a range that preserves life, at the cost of some usable capacity that was never reliably available in practice.

Black start is a specification, not an assumption.

If the system must restart after a full shutdown, the sequence has to be written down and tested: who energises what, in what order, and with which loads connected. A black start that only works while the sun is up is a limited capability, and the site operator should know that before relying on it.

Integration considerations

Forming the grid, not following it.

Where storage establishes the reference voltage and frequency, the control strategy is fundamentally different from a grid-tied system. Step loads, motor starting, and multiple source transitions all have to be analysed.

Source coordination.

Where diesel generation remains, the transition between generator and storage is where most failures occur. This must be tested in a controlled condition, not discovered on site.

Thermal and environmental conditions.

Enclosure temperature in direct tropical sun can exceed ambient by a wide margin. Designs based on regional weather averages will underperform.

Spares and consumables.

What parts should be held locally, and what can be shipped? This is a design decision, not an afterthought, and it affects the recommended configuration.

Operator competence.

The people running the site may not be electrical technicians. The system's interfaces and the documentation have to match their actual capability, not the capability we wish they had.

Common questions

Can you design a fully diesel-free system?
Often, yes — but it depends on the load profile, the solar resource, and the acceptable level of reliability. Where a site cannot tolerate any outage, retaining a generator as backup is usually the more honest engineering answer, even if it is a less appealing headline.
How do you handle sites with no reliable data?
We instrument the site and monitor for a period before finalising the design. This delays the project, and we would rather say that upfront than design against assumptions and discover them to be wrong after commissioning.
What is the realistic lead time?
Manufacturing is rarely the constraint on these projects. Logistics, customs, site preparation, and the availability of qualified commissioning personnel usually determine the schedule. We plan against the actual critical path.
How is maintenance handled?
Remote diagnostics first, with a defined escalation path and clear guidance for local staff. Site visits are planned rather than reactive. We publish what can and cannot be resolved remotely.
Home / Solutions / Power Distribution

Power Distribution

Low- and medium-voltage distribution and protection equipment engineered to sit alongside our storage systems — one supplier, one interface, one point of responsibility. For partners who are tired of coordinating three vendors to deliver one site.

Product Scope
Low-voltage switchgear and distribution panels—
Protection, metering, and control components—
Medium-voltage interface equipmentProject-specific
Custom configurations for OEM and projects—
Certification Status

Designed to the requirements of your target market — for example IEC 61439, GB 7251.

Why Integrate
  • Fewer suppliers to manage, fewer interfaces to debug
  • Factory-level coordination between storage and distribution
  • Single warranty and single technical contact
  • A clear upgrade path from LV switchgear to SST-based MV architecture
Who This Is For

EPCs, panel builders, system integrators, and OEM partners.

Deep dive

The case for buying storage and distribution from one supplier

On most projects, energy storage and low-voltage distribution are procured separately. It seems sensible: each is a specialised product, and each has its own qualified suppliers. The problems only become visible later, and they are always at the boundary between the two packages.

The battery system's protection settings must coordinate with the distribution board's. The communication interface has to be agreed by two engineering teams. The physical installation has to fit into a space neither party fully controls. And when commissioning reveals a mismatch, both suppliers can correctly point out that their own equipment performed to specification.

It is worth being precise about what is being compared. The question is not whether separate suppliers can each deliver a working product — they usually can. The question is who owns the joint that sits between them, and whether that ownership is written down somewhere before the equipment is ordered.

This page is not an argument that separate procurement is always wrong. It is an argument that the coordination cost is real, and that it should be counted.

Read the detailed engineering discussion

The coordination cost, itemised

Protection and discrimination studies.

Adding storage changes fault current levels at the point of connection. Someone has to re-check the upstream and downstream protection settings against the new conditions. When two suppliers are involved, this study is frequently assumed to be the other party's responsibility.

Interface agreement.

Protocol, data points, control signals, and responsibility for configuration must be agreed before design freeze. Every interface between two suppliers is a document that must be written and maintained by someone.

Schedule exposure.

Two supply chains mean two lead times, and the later one sets the date. It also means two opportunities for a delay that affects the other party's installation window.

Warranty and fault attribution.

When a fault occurs at the boundary, attribution requires agreement between suppliers before repair can proceed. On a single-scope project this step does not exist.

What we offer

Storage and distribution from one engineering team.

Battery systems, PCS, and low-voltage switchgear are specified together, so protection coordination and interface definition happen inside one team rather than across two organisations.

Interface documentation as a deliverable.

Where third-party equipment is involved, we produce the interface document rather than leaving it to be resolved on site.

A stated upgrade path.

From LV switchgear today to medium-voltage architecture based on solid-state transformers as it becomes available. Partners should be able to plan a trajectory, not just a purchase.

Honest scope boundaries.

Where something genuinely falls outside what we should supply — for example civil works, or a utility-side connection — we say so clearly rather than absorbing it ambiguously.

Typical configurations

Storage plus LV switchgear, integrated

Storage cabinets and the associated distribution board delivered as one coordinated package, with protection settings studied together.

Distribution board retrofit

Adding storage to a site with existing switchgear. The work here is as much about understanding the existing installation as about the new equipment.

Medium-voltage interface

Where the connection point is at medium voltage, the interface equipment and its coordination with the low-voltage side are specified as one design.

Technical read: four checks that live in the seam between packages

Fault level is calculated, not estimated.

Adding a storage converter at a point of connection changes the prospective short-circuit current at that busbar, which in turn changes whether the existing protection still discriminates correctly. A study to the IEC 60909 method takes hours when it is done at design stage, and weeks when it is done in response to a nuisance trip on site.

Temperature rise and internal arc are tested properties of an assembly.

IEC 61439 defines how a low-voltage assembly is verified for temperature rise at its rated current, and what the assembly is expected to withstand if an internal arc occurs. These are not qualities that can be inferred from the sum of the components used; they belong to the assembly as a whole, which is why the assembly has to have one owner.

Neutral current is not zero in a modern installation.

Non-linear loads such as LED lighting, variable-speed drives, and switched-mode supplies inject third-harmonic current that adds in the neutral rather than cancelling. A neutral sized on the assumption of balanced linear loads can run hot in a building whose load mix has changed since it was designed.

The point of connection decides the protection problem.

Connecting storage on the main busbar, on a sub-board, or on the load side of a specific feeder each produces a different coordination question. The location should be chosen together with the protection arrangement, because the two cannot be decided independently.

Integration considerations

Existing installation assessment.

Before proposing anything, the existing single-line diagram, protection settings, and spare capacity must be understood. A design that ignores what is already there is a design that will be modified on site.

Form factor and space.

Where the storage and the distribution equipment physically sit affects cable routing, thermal management, and access for maintenance. These are design decisions, not installation details.

Standards and approval.

Applicable standards differ by market and by the voltage class involved. We confirm the requirements for your destination market rather than applying a default.

Sequence and responsibility.

Who installs what, in what order, and who signs off each stage. On a single scope this is one schedule; on a multi-vendor project it is a negotiation.

Common questions

Does this mean we cannot use our existing panel builder?
Not at all. Many partners have established relationships they want to keep. What matters is that the interface is documented and the coordination is someone's explicit responsibility. We can supply storage only, distribution only, or both — but we will be clear about which boundaries we are and are not covering.
How do you handle standards in a new market?
We confirm the applicable standards for the destination market and reflect them in the specification. Where certification is still in progress, that is stated on our published certification roadmap rather than implied to be complete.
Can you work with our preferred equipment?
Often, yes — where the interface can be properly defined and the coordination responsibility is clear. We will tell you upfront if a particular combination creates a risk we cannot manage.
What about the utility connection?
Connection applications are usually the customer's or the project developer's responsibility, but we provide the technical documentation required to support them. Where a grid study is needed, it is a schedule-critical item and should start early.
Home / Solutions / Data Centre & Critical Power

Integrated power for the next generation of data centers.

Coordinate conversion, storage, distribution and controls around critical-load requirements — from the grid interface to the critical load.

Discuss Your Power Architecture →
Reference architecture

From the grid interface to the critical load.

Define the power path as one system. Conversion, storage, distribution and controls are specified against the same operating envelope — not assembled from separate packages.

01 · GRID INTERFACE Grid interface MV connection Available now
02 · CONVERSION Conversion SST option / isolation Available
03 · DISTRIBUTION Distribution DC bus + protection Project-specific
04 · CRITICAL LOAD Critical load Downstream interfaces Project-specific
Storage + DC/DC Energy buffering connected at the defined conversion stage. Available now
Controls + monitoring across the defined system scope

Illustrative architecture. The actual configuration depends on voltage class, isolation requirements and the target market’s certification path. Scope boundaries — LumiVolt supply, partner supply and third-party interfaces — are defined in the project documentation.

800 VDC and AI workloads

Planning for 800 VDC? Start with the system architecture.

800 VDC is an option, subject to interface, grounding and protection assessment. Evaluate conversion, energy buffering and controls against your load requirements before the bus voltage is fixed.

Concept Development Validated

Each project states which stage applies to which function — conversion, buffering, protection and recovery. No function is presented as validated before the test evidence exists.

Operating requirement What we discuss Status
Load transients Step size, repetition and recovery time against the conversion stage. Project-specific
Ride-through Duration, depth and the loads held up during a supply disturbance. Project-specific
Backup duration Critical load list, autonomy target and the transition between sources. Available now
Recovery sequence Restart order, source hand-back and who authorises each stage. Project-specific
Why the architecture matters

The bottleneck is conversion, not generation.

A conventional feed passes through a line-frequency transformer, an AC/DC stage, a DC/AC stage, and a distribution panel — each with losses, footprint, and its own failure modes. An SST replaces most of that chain with a single controllable power-electronic stage.

Smaller, lighter footprint

No line-frequency transformer core or oil tank. Meaningful where floor area and structural loading are the real constraint.

Precise control

Voltage, frequency, and power flow controlled electronically — not fixed by a transformer turns ratio.

Bidirectional by nature

Power flows both ways without a separate converter stage — relevant for storage integration and V2G-style applications.

Integrated LV distribution

The LV output stage is part of the same device — one enclosure instead of transformer plus switchgear cabinets.

DC-native where useful

A DC link at the SST output suits storage, EV fast charging, and increasingly DC-powered IT loads.

Grid support functions

Reactive power compensation, voltage regulation, and — in suitable configurations — grid-forming capability.

The load changed first

The rack went from 8 kW to 1 MW in six years.

Nothing upstream was redesigned for that. The power train is now the constraint on how much compute a building can hold.

Year GPU generation Power per rack Power per cabinet
2024 Blackwell ~130–250 kW ~40–100 kW
2025 Blackwell Ultra ~250–500 kW ~100–350 kW
2028 Rubin Ultra ~900–1000+ kW ~350–500 kW

Ranges cover air- and liquid-cooled configurations. Rack and cabinet are counted separately in the source roadmap — confirm both definitions with the vendor before committing a design. These are the roadmaps our customers are designing to, not our forecast.

150×rack power growth, 2024 → 2029
800 VDCdistribution voltage now being specified
1 MW+per rack where the power train allows it
6 yearsfrom 8 kW per rack to 1 MW
Why the old layout fails

Four things break at megawatt density.

Each one has a workaround at 100 kW and no workaround at 1 MW.

01

Floor area collapses

At 8 kW a rack needs half a square metre of power equipment. At 500 kW the power room grows faster than the compute hall — the building becomes a substation with servers in it.

02

Copper stops making sense

Low-voltage distribution at 800 A per rack means busbar measured in tonnes. The copper alone can outweigh the electronics it feeds, and it all has to be supported, cooled and paid for.

03

Conversion stages stack up

MV transformer, LV switchgear, UPS, PSU — every stage costs one to two points of efficiency and a cabinet of floor space. At 10 MW that is hundreds of kW of heat nobody planned for.

04

The load stops being predictable

AI training loads swing on a millisecond scale between idle and full draw. A grid connection designed around a smooth commercial load profile will read this as a fault, not as demand.

Raising the distribution voltage is the only move that removes copper, floor area and conversion stages at the same time.

Where we fit

Applications we serve around the SST.

AI & Hyperscale Data Centres

High-density racks need high-density power delivery. The SST shortens the conversion chain and reduces the electrical footprint per megawatt.

EV Charging Hubs

Direct MV connection with an integrated DC output — fewer conversion stages between the grid and the vehicle.

Critical & Industrial Facilities

Sites where power quality, redundancy, and physical footprint all matter at once.

⚠

Commercial record and development status — stated plainly

Our SST platform is not a prototype and not yet a volume product. Two ratings are quotable: 13.8 kV / 3.5 MW (Rev. A7) and 10 kV / 2.5 MW. Three 10 kV / 2.42 MVA / 800 VDC units have been in service at a data-centre campus since September 2023, four 13.8 kV units are in delivery on a 2026 export order, and a 750 V series is grid-connected at a park site. Certification is still open, and the Quality page states exactly which standards are pending. If your project requires a type-tested unit today, tell us and we will say whether we fit before a proposal is written.

See SST product details → Discuss a project
Deep dive

Why data centre power architecture is changing

Data centre power design has been stable for decades. Power arrives at medium voltage, a line-frequency transformer steps it down, an uninterruptible power supply conditions it, and it is distributed at low voltage to the racks. That architecture worked because the loads it served were predictable and the constraint was cost per megawatt.

That is no longer the situation. Rack density has increased by an order of magnitude. Loads are increasingly DC-native. Sites are constrained by available floor area and by grid connection capacity rather than by energy supply. And the electrical infrastructure now represents a significant share of the cost of a megawatt of IT capacity.

The change is being driven from the load side rather than the supply side. For as long as loads were AC and predictable, the conventional chain was an adequate answer to a solved problem. Once loads became dense and DC-native, the chain stopped being the cheapest way to answer the question, and alternative architectures started to be worth the engineering effort.

This page sets out why the conventional chain is becoming a constraint, and where solid-state transformer architecture changes the calculation.

Read the detailed engineering discussion

Where the conventional chain binds

Footprint.

A line-frequency transformer is a large, heavy, oil-filled device. For a given megawatt capacity it occupies space that could otherwise hold IT equipment — and in a dense facility, floor area is the scarce resource.

Conversion stages.

Power passes through AC/DC and DC/AC stages that each introduce losses. At data centre scale, a small efficiency improvement compounds into a large operating cost over the life of the facility.

Control granularity.

A transformer's output voltage is fixed by its turns ratio. It cannot regulate voltage dynamically, cannot control power flow direction, and cannot provide reactive power support without additional equipment.

DC-native loads.

Racks, storage, and fast charging increasingly operate natively on DC. The conventional chain converts AC to DC and back, when a DC bus would avoid those conversions entirely.

What SST architecture changes

Fewer stages, fewer cabinets.

A solid-state transformer replaces the line-frequency transformer, the separate power conversion stage, and the LV distribution stage with fewer, smaller, electronically controlled stages.

Active control.

Voltage, frequency, and power flow are controlled electronically rather than fixed by physical construction. This enables functions that would otherwise require separate equipment.

Bidirectional by default.

Power can flow in either direction without an additional converter, which matters both for storage integration and for any application where the site both consumes and exports.

A DC interface where it is useful.

Storage, fast charging, and DC-powered IT loads can connect to a DC link at the output stage, avoiding a conversion on each side.

A status we state plainly.

Two ratings are available and can be quoted, and units are in service — three 10 kV class AIDC units in service since 2023, plus a four-unit export order in delivery. Certification is not finished, and we publish that item by item rather than leaving you to find out. Alongside the product we offer architecture review, reference design, and a joint validation plan for the functions that still need evidence.

Where this applies

AI and high-density compute facilities

Where rack density is the binding constraint and electrical footprint per megawatt directly determines how much compute fits in the building.

EV charging hubs

Sites connecting directly at medium voltage with high aggregate charging demand, where avoiding conversion stages improves both efficiency and equipment count.

Critical facilities with DC infrastructure

Sites already operating DC bus infrastructure where an AC-based conversion chain is an avoidable inefficiency.

Technical read: four parameters that define an SST design

The topology is a chain of conversions, and the count is the point.

A typical solid-state transformer rectifies medium-voltage AC onto a DC link, transfers across an isolating medium-frequency transformer, and then either inverts back to low-frequency AC or presents a DC output directly. Each stage can be built on silicon-carbide devices, which permit higher switching frequency, which in turn shrinks the isolating transformer dramatically.

Frequency is what replaces iron.

The size of a transformer core falls roughly in proportion to the frequency it operates at. Raising the link from fifty hertz to tens of kilohertz is what allows a transformer that once filled a room to fit inside a cabinet — and that change in volume is the whole argument for the architecture, before any control benefit is counted.

Ride-through is a design parameter, not an inherent property.

Because the DC link carries stored energy, a solid-state transformer can hold up its output through a supply disturbance of a defined duration. How long it holds is set by the link capacitance and the load, and it has to be stated as a number in the specification rather than implied as a general guarantee.

Redundancy has to be architectural.

Replacing several passive devices with one active device concentrates failure modes. If the facility requires N plus one, that redundancy has to come from parallel units or from a bypass path designed in from the start; it cannot be added afterwards as an option. Reliability is argued at system level, not at device level.

Integration considerations

Control and protection philosophy.

Power-electronic conversion behaves differently from electromechanical transformation under fault conditions. Protection strategy and ride-through behaviour must be designed deliberately, not inherited from conventional practice.

Reliability and redundancy.

A single device replacing several must be assessed for failure modes at system level. Where redundancy is required, the architecture must provide it explicitly.

Certification pathway.

Power-electronic equipment at medium voltage follows a different certification path from conventional switchgear. This affects the timeline and should be planned early.

Thermal management at higher density.

Removing the transformer reduces footprint but concentrates losses in a smaller volume. Cooling design becomes more, not less, critical.

Common questions

Has the SST actually been deployed?
Yes. Three 10 kV / 2.42 MVA / 800 VDC units have been in service at a data-centre campus since September 2023, and four 13.8 kV units were ordered in 2026 for overseas AI campuses and are in delivery. What is not finished is certification: type testing against IEC 62477-1 and the target-market approvals are still open, and the Quality page lists each one. Commercially deployed and type-tested are different claims, and we keep them apart.
What can we do with you today?
For storage and power distribution requirements, we can quote and supply now. For SST, two ratings are quotable and one of them is already in service — we can share deployment references and type-test records under NDA, and we will tell you plainly which market approvals are still open. What we will not do is present a configuration as certified before it is.
How do I know if SST suits my site?
The usual test is whether the conventional chain is actually binding. If floor area, conversion losses, or control granularity are real constraints, the architecture is worth evaluating. If none of them are, the conventional approach may be the better answer economically — and we will say so.
What certifications do you expect?
Power electronic conversion equipment at medium voltage follows standards such as the IEC 62477 and IEC 61800 series, alongside the target market's grid connection requirements. Our certification roadmap page shows current status and is updated as things change.
Home / Products

Products

Every product below is documented in English with full specifications, certification status, and downloadable datasheets. If you need something not listed, ask — we build custom configurations.

Battery Modules & Packs

LFP modules and packs with integrated BMS for residential and commercial systems.

Battery Management Systems

Cell monitoring, balancing, protection, and communication.

PCS & Hybrid Inverters

Bi-directional power conversion for grid-tied and off-grid applications.

Energy Storage Cabinets

Integrated battery, conversion, thermal management, and protection in one enclosure.

LV Switchgear & Distribution

Distribution, protection, and metering equipment.

★ NEW

SST — Solid State Transformer

Medium-voltage power conversion that consolidates the conventional transformer, PCS and LV distribution chain into one controllable device — subject to isolation, protection and interface requirements.

Product documentation

The right configuration starts with clear specifications.

Every product page follows the same seven sections, in the same order. If a figure is not approved for your market, the page says so instead of leaving a gap you have to interpret.

ApplicationWhich applications and configurations the model is intended for.
RatingsUsable capacity, continuous power, voltage range and phase — approved figures only.
InterfacesElectrical, communication and mechanical interfaces, with the partner-side requirement stated.
EnvironmentInstallation location, ambient temperature range, IP rating and cooling.
AvailabilityWhich markets it is released in, lead time basis and order conditions.
CertificationStatus against every applicable standard, linked to the evidence register — including what is outstanding.
DownloadsDatasheet, installation manual, declaration documents — each with a revision date.
Home / Products / SST

Solid-State Transformer

A medium-voltage to DC conversion platform for AI data centres, EV charging, renewable integration and smart grids. Medium-voltage AC in, 800 VDC out, through one controllable power interface.

Discuss an SST project →
Product family

Four ratings. Two released — one of them running since 2023.

Ratings are released separately. A released rating means the design is frozen at the stated revision and can be quoted for a project — it does not by itself imply certification, which is tracked separately on the Quality page.

Available

13.8 kV · 3.5 MW

Rev. A7 product, 800 VDC output. The rating with a full published parameter set.

In service

10 kV · 2.5 MW

First deployment of this rating: three 10 kV / 2.42 MVA / 800 VDC AIDC units, in service since September 2023 and still running.

Planned

10 kV · 1 MW

Planned for a future release. Parameters are not frozen and are not quoted.

Planned · Jul 2027

34.5 / 35 kV · 10 MW

Planned timing, subject to product plan. Not a contractual delivery commitment.

Commercial record

Not a laboratory prototype. Units in service, and units in build.

The SST platform behind our product line has been through successive field generations since 2017. For a buyer assessing it today, three deployments matter: units that have run for years, an export order now in delivery, and a grid connection that proves the DC output class outside a data hall.

2023 · Data centre

3 × 10 kV / 2.42 MVA / 800 VDC

Three commercial AIDC units, energised at a data-centre campus in September 2023 and running since. As far as we are aware they are among the earliest commercial solid-state transformer deployments in an AI data centre — and they are still in service.

2026 · Export order

4 × 13.8 kV / 800 VDC

Four 13.8 kV units ordered in 2026 by an overseas AI computing developer for its own campuses. The first outbound order for this platform, currently in production and delivery.

Park grid connection

10 kV / 2 MVA / 750 V

A separate 750 V series, grid-connected at an integrated solar-storage-charging park. It is not an AI data centre, and we list it as what it is: proof that the same conversion platform also runs grid-tied outside a data hall.

2023first commercial AIDC units in service
2.42 MVAlargest unit in service
4 unitsexport order in delivery, 2026
750–800 VDC output classes proven in service

What this record does and does not mean

These are real units, real orders and a real supply chain, not a laboratory prototype. They are also not volume production. The platform is at demonstration and small-batch commercialisation: unit cost is still high, cloud operators have not yet put it into volume procurement, and industrialisation is early. We would rather you hear that from us now than discover it later.

Accountability

Four statuses kept separate. One company accountable for all of them.

Quotable, in service, in delivery and type-tested are different things, and suppliers blur them on purpose. Here is each one, and where this platform actually stands on it.

Status What it means Where this platform stands
Quotable Design frozen at a stated revision. We can price it, contract it and ship it. 13.8 kV / 3.5 MW (Rev. A7) · 10 kV / 2.5 MW
In service Energised on a customer site and running under load. Three units since September 2023 — 10 kV class, data centre
In delivery Ordered, in production, on its way to site. Four 13.8 kV units, 2026 export order
Type-tested A third-party certificate against the standard that applies to the market. Not yet — IEC 62477-1 remains open

A configuration can be quotable and in service without yet being type-tested. We do not let the second fact hide the third: the Quality page tracks certification item by item, with the evidence held for each.

What Lumivolt owns

One contract, one warranty and one named engineer. Application study, single-line diagram and protection settings. Market-specific documents, commissioning, remote diagnostics and spare parts held locally. If something goes wrong at the interface, there is one number to call.

What the platform we build on provides

Production history since 2017. Medium-voltage manufacturing and test infrastructure. SiC devices and high-frequency magnetics. Field generations in data centres and parks. Type-test records available to qualified buyers under NDA.

Platform capability and the certification status of a specific offered configuration are separate pieces of evidence, and we treat them that way.

Where the platform is used

Four applications, one power interface.

The same conversion chain, configured four ways. The port count and the control mode are what change.

AI data centres

10–35 kV in · 800 VDC out

Rack-level or row-level distribution. Removes the LV switchgear and UPS stages; the DC bus feeds the racks directly.

EV charging hubs

10–35 kV in · 800–1000 VDC out

Megawatt charging without a separate substation building. V2G and PV/storage integration on the same DC bus.

Renewable integration

PV and storage on a common DC bus

Large PV plants and storage connect at medium voltage through one conversion stage instead of two.

Grid interfaces

Grid-forming and ride-through

A controllable, bidirectional interface between medium-voltage AC and a DC network — including weak-grid and microgrid operation.

SST cabinet — light grey enclosure with dark doors and panel
Unified design language: light grey cabinets, dark grey doors, blue accent line. Marketing concept only — final appearance is subject to approved drawings.
Electrical architecture

Cascaded AFE, isolated high-frequency DC/DC, parallel DC output.

Medium-voltage AC is actively rectified in a cascaded arrangement, buffered per module, then isolated and converted at high frequency before the parallel low-voltage output stage. Control targets are regulated input current, stable output voltage, module voltage balance, and coordinated protection and bypass.

← Swipe to see the full diagram
13.8 kV AC Three-phase, 50/60 Hz MV input Cascaded AFE Active rectification Power factor and current control Module DC link Segmented buffering Condition monitoring DAB + HF transformer Isolated high-frequency DC/DC Galvanic isolation and ratio 800 VDC · 4375 A Low-voltage rectification Parallel output Rated operating point (Rev. A7) Core control variables Input current · power factor · module voltage balance · output voltage · protection and bypass

Simplified for clarity, based on the Rev. A7 block diagram. Topology, switching frequency and control parameters depend on the project and the product revision.

Main electrical parameters

13.8 kV / 3.5 MW, Rev. A7

Rated power / voltage / current3.5 MW / 800 V / 4375 A
Steady-state accuracy / transient deviation±1% / ±5%
Voltage regulationRipple ≤0.5% / static ≤1% / dynamic ≤3%
Phases / frequency / input voltageThree-phase / 50–60 Hz (±3 Hz) / 13.8 kV
Permissible voltage variation−10% ~ +10%
Peak efficiency / THDi / power factor98.5% peak / <3% above 50% load / >0.98
Output overload105% continuous / 110% 60 min / 125% 10 min / 150% 0.2 s
Short-circuit fault clearing150% / 180 ms
Insulation level (BIL)>95 kV
Partial discharge<10 pC
Ambient temperature−30 °C to +50 °C
Altitude≤2000 m
Cooling / ingress protectionAir cooled / IP20 (main unit)
Container ratingNEMA 3R / C5
CommunicationRS485 / Ethernet · Modbus RTU/TCP · IEC 104 · IEC 61850

Values are nominal. 98.5% is the peak efficiency figure. Efficiency at part load is lower, and the figure to use in a savings calculation is the one read off the efficiency curve for the offered unit at your operating point, not this peak. Harmonics, overload and fault ride-through require testing under agreed conditions, and fault ride-through requires coordination with the energy storage system. Unlisted parameters should not be assumed compliant.

Protection and monitoring
Protection functions Overcurrent · overvoltage · undervoltage · short circuit · overtemperature
Surge protection Both AC input and DC output
Operating mode Voltage source mode
Monitoring Voltage, current, module faults, bus voltage
Certification status
IEC 62477-1 In progress
IEC 61800 series Not started
Target-market approval Not started

A released rating can be quoted before certification is complete. Where a project requires a certified unit, we say so in the proposal rather than afterwards.

Modular configuration

Built from modules, with one spare in every string.

Each phase is a chain of nine two-in-one modules, each containing two identical submodules — 18 submodules per phase, one of them redundant. Per-phase cascading is what lets a single failed module be bypassed instead of taking the unit offline.

17 + 1 per phase

18 submodules per phase including one redundant module. Redundancy is a module count, not a claim about availability — actual availability depends on the redundancy strategy in your design.

Two-in-one modules

Nine two-in-one modules per phase, each containing two identical submodules. Fewer connectors and a shorter power path than discrete modules.

Online bypass

The design aims to reduce the effect of a module fault on delivery. Bypass conditions, derating and protection logic must be validated per project.

SST cabinet — dark grey enclosure variant
Dark door variant of the same enclosure family. Appearance is subject to approved drawings.
Formats and dimensions
Indoor core cabinet4700 × 1450 × 2300 mm · approx. 6 t · IP20
20-foot container solution6058 × 2438 × 2591 mm · NEMA 3R / C5
Container contentsSST, fire protection, HVAC cooling
Derating above 40 °C−0.5 MW per further 5 °C

Final enclosure, weight, lifting points and interfaces follow approved customer drawings.

AIDC system application

The SST is one layer, not the whole answer.

In an AI data centre the SST handles primary conversion, while storage, static var generation, high-voltage drives and an EMS coordinate around it. Each function sits in its own layer with its own protection boundary.

SST — primary conversion

MV AC to 800 VDC, with voltage regulation, power factor control and modular protection.

Energy storage PCS / BESS

Dynamic buffering and backup support. Capacity and connection point configured per project — and required for fault ride-through.

SVG — power quality

Campus-level reactive power and voltage support at the point of common coupling.

Drives + EMS

Energy efficiency for chiller pumps and fans, plus unified monitoring and energy dispatch.

Solution boundary: this layered view is a concept, not a standard scope of supply. Protection zones, the 2N strategy, storage connection points and emergency power logic require joint design with the customer.

Deployment models

Three ways to place an SST in a live facility.

The choice follows your POD design, redundancy strategy and retrofit scope — not a vendor preference. These are discussion models; the final architecture depends on your reliability target and site conditions.

01 · Distributed PODs

One SST per POD

Dedicated conversion close to the load. Smaller fault domain, and capacity can be added POD by POD as phases come online.

02 · High-density campus

Several SSTs, one DC bus

Multiple units feed a centralised DC bus. Requires parallel operation, coordinated protection and an availability design that is agreed up front.

03 · Existing 2N retrofit

Keep one path conventional

Retain one side of the existing 2N pair and add SST on the other. Limits the risk of a one-time retrofit while the new path proves itself.

EV charging hubs

Medium-voltage charging, without the substation between.

The SST takes 10–35 kV directly and puts out adjustable DC. The line-frequency transformer and its building disappear from the layout.

1–2.5 MWcharging power per SST unit
60%+floor-space reduction vs. an LV architecture
800–1000 VDC output voltage
1,500 Amaximum output current

Direct MV connection

10 kV or 35 kV in, adjustable high-voltage DC out. No step-down transformer, no separate LV room.

Bidirectional by design

Vehicle-to-grid is a control mode, not extra hardware. Energy flows back during peak hours.

PV and storage on the DC bus

Solar and batteries connect to the same DC ports, so the site runs as one energy hub rather than three systems with three meters.

Typical megawatt charging configuration. Actual power, voltage and port count are set per site.

Programme history

One platform, in the field since 2017.

The SST we supply is not a new design. It is a platform that has been through successive field generations, each one now shipping.

2017

First MV SST
National R&D programme prototype, ±10 kV / ±375 V / 1 MW

2019

DC transformer
±10 kV / ±375 V / 2 MW, demonstration grid

2022

Multi-port router
3 MW IGCT-based DC transformer, park deployment

2023

Data centre SST
3 × 10 kV / 2.42 MVA / 800 VDC, in service since September 2023

2025

SiC generation
10 kV SiC devices, higher switching frequency

2026

800 VDC platform
MW-class cabinets for AI data centres · first export order: four 13.8 kV units, in delivery

How to read this
  • Every entry is programme history of the platform behind our SST range.
  • Our own engineering, warranty, commissioning and service sit in front of that platform; the record above is why we can stand behind it.
  • Deployment references and type-test records are available under NDA to qualified projects.
  • Which ratings we can quote today is stated earlier on this page, revision by revision.
System configurations

How the pieces connect.

Three reference configurations. Each is a starting point for a system study, not a catalogue item.

AIDC

Data centre

MV grid 10–35 kV
↓
SST cabinet
↓
DC 800 V bus
↓
Rack power + BBU
PV + storage

Renewable plant

PV arrays at 1.5 kV DC
↓
SST / DC collection
↓
MV grid 10–35 kV
↓
Storage on DC bus
Charging hub

EV + PV + storage

MV grid 10–35 kV
↓
SST multi-port
↓
Chargers 800–1000 VDC
↓
PV + BESS on DC ports

Port counts, voltage classes and protection settings are fixed by the system study. We do not quote a combination before that study is done.

Evidence chain

Six steps from design target to operating data.

A new platform closes reliability risk step by step. We publish which step each item has reached, so you can see where a claim is backed by a test report and where it is still a design target.

01

Design & failure analysis

Failure modes identified at design level, before hardware exists.

02

Component / module testing

Critical components and the module itself validated on the bench.

03

System-level testing

Full converter behaviour: control, protection, thermal path and bypass.

04

Third-party validation

Type testing against the standard that applies to the target market.

05

Demonstration data

Operating record from a live site, over a defined period and load profile.

06

Failure closure & consistency

Field failures closed out, and production consistency demonstrated across units.

Before deployment
  • Voltage and short-circuit capacity at the point of connection
  • Load profile, including the transient envelope
  • POD and redundancy strategy
  • Storage interface and control coordination
  • Communication points and protocol list
  • Environmental and fire protection requirements
  • Certification path and acceptance criteria
How we engage
  • Feasibility discussion — whether the architecture suits your site
  • Reference design — system configuration, interfaces and protection zones
  • Joint validation plan — agreed milestones where evidence is still missing
  • Or an honest "not yet" — if the timing does not work, we say so

A note on where this product actually stands

Two ratings are released and can be quoted, and the platform has units in service and an export order in delivery. What it does not yet have is a type-test certificate, or a place in a cloud operator's volume procurement. We would rather state both halves in the same paragraph than let you discover the second one after the first. If your project needs a type-tested SST for delivery this quarter, we will tell you that we are not there yet.

Home / Quality & Compliance

Quality & Compliance

We publish our certification status, testing capability, and supply chain practices openly. Where we are not yet certified, we say so — and we tell you when we expect to be.

We believe a new supplier should be judged on what it can prove, not on what it claims.

Certification Roadmap

Certification Roadmap

The table below lists every standard relevant to our products, our current status against each, and our expected completion date. We update it as things change.

← Swipe to see the full table

Register last reviewed 11 November 2026. A revision date is added to each row when supporting evidence is issued.

Standard Description Model / applies to Target market Status Evidence held Revision
IEC 62619 Safety requirements for industrial lithium batteries ESS EU · UK · AU In Progress No certificate held — test report pending —
UN 38.3 Transport testing for lithium batteries ESS All export markets Not started No test summary held —
IEC 62477-1 Safety of power electronic converter systems PCS · SST EU · UK In progress No certificate held — type testing under way for 13.8 kV / 3.5 MW and 10 kV / 2.5 MW —
IEC 61439 Low-voltage switchgear and controlgear assemblies LV Switchgear EU · UK · MENA Designed to No certificate held — assemblies designed to IEC 61439 / GB 7251; verification per project —
CE Marking European conformity All EU · EEA Not started No declaration of conformity issued —
ISO 9001 Quality management system Company Company-wide Not started No certificate held —
Certified  Certificate obtained. Number and scan available in Downloads or on request. In Progress  Testing or application underway with a named third-party laboratory. Planned  Scheduled; timing follows the certification plan for each target market. Not started  尚未排期。目标市场需求确认后,我们会公布时间。

Documents are published here as they are issued. Until a certificate exists, the register says so rather than leaving the row blank — a blank cell is the most common way a supplier implies a certification it does not hold. To request the documents available for a specific model and market, contact us.

Test & Validation

We validate our products against the conditions our customers actually operate in — not only the conditions that are easy to pass.

  • In-house test capability —— test equipment configured per product line
  • Third-party laboratories —— named laboratories selected per certification project
  • Validation items — cycle life, capacity retention, thermal behaviour, EMC, dielectric strength, protection and fault isolation

Quality Management

Quality is controlled at every stage — incoming, in-process, and outgoing — with records retained so that any unit can be traced back to its component batch.

ISO 9001Not started
Field defect targetSet per customer requirement
Outgoing pass rateUnit-by-unit outgoing inspection
Record retentionPer customer and regulatory requirement

Supply & Warranty

Our partners need to plan around us. This page states what we can commit to, so you can plan accurately.

Monthly capacityScheduled against confirmed orders
Sourcing strategyCritical components dual-sourced wherever viable
Standard lead timeConfirmed per order
WarrantyAgreed per product and project
End-of-support policySpare parts and firmware support are provided for each product line, with the duration agreed per product.

If we discontinue a product line, we commit to supplying spare parts and firmware support after the last shipment, for the period agreed per product. We would rather state this now than leave our partners exposed later.

Reference projects

How a project is documented — and what we can share today.

We have no named customer case studies yet. The platform behind our SST line does have units in service and an export order in delivery — those are described on the SST page, without customer names. Rather than fill this page with stock imagery and anonymous logos, we describe the structure every project file follows, and we will publish documented cases here as soon as customers agree to be named.

01Requirement

The load, the site and the constraint that makes the project worth doing.

02Scope

What LumiVolt supplies, what the partner supplies, and where the interface sits.

03Architecture

The power path, drawn against the operating envelope rather than a catalogue.

04Validation

Which items are type-tested, which are project-specific, and what evidence exists.

05Result

Measured against an agreed baseline, with the calculation method documented first.

Diagrams on this site are illustrative architectures, not photographs of commissioned installations. Any figure in a proposal states its conditions.

How a project is evidenced

Illustrative project path, not a customer case.

We publish a case only with the customer’s permission and the measured result attached.

Requirement → Scope → Architecture → Validation → Measured result

No customer name, site or outcome is presented here. The path shows what evidence a case would need to contain.

Home / About Us

About Us

Lumivolt Energy was founded in 2026. We build energy storage, power distribution, and power electronics — and we build them to work as one system.

Our Story

We are an export-first company. Commercial coordination runs from our Singapore office, which puts us in the same time zone as most of our buyers and one working day closer to them than a mainland-only setup would be. Engineering, testing and manufacturing sit with our own team, so the people who answer your first question are the people accountable at shipment.

Focused engineering. Clear responsibility. We bring storage, conversion and distribution expertise together around each application — and we say plainly where we are on the path, because our partners will find out anyway.

What we bring is not history. It is a focused team, a clear product direction, and a commitment to telling you exactly where we stand — including the parts that are not finished yet.

We are building for international partners who value responsiveness and straight answers over scale. If that describes how you like to work, we should talk.

Team & Capabilities

Our founding team brings hands-on experience across the disciplines that matter for this product:

  • Battery systems and BMS development
  • Power electronics and conversion
  • Medium-voltage power conversion and SST architecture
  • Low- and medium-voltage electrical distribution
  • International project delivery and export operations
  • Quality management and certification

Our core functions are organised as: R&D · Quality · Supply Chain · Export Sales. Engineering decisions are made by engineers, and technical questions reach them directly.

Mission & vision

Our mission is to make energy systems easier to adopt, integrate and operate — from solar-powered buildings to critical digital infrastructure.

Our vision is a future where clean energy and critical infrastructure are connected through efficient, adaptable power systems.

SIMPLIFY

Integration

VALIDATE

Performance

BUILD

Partnerships

SUPPORT

Long-term operation

How We Build

From requirement to shipment, in five stages

This is the sequence every project follows. It is short on purpose — each stage has one owner and one output, and nothing moves forward until the previous stage is signed off.

01

Requirement

Target market, applicable standard, operating envelope, and delivery boundary are agreed before design starts.

02

Architecture

Electrical topology, thermal path, and control strategy are decided together, not one after another.

03

Prototype

Critical components are validated first, then the prototype is assembled — so defects surface in the lab, not in the field.

04

Validation

Bench testing first, then type testing at an accredited laboratory against the standard that applies to your market.

05

Delivery

Production is scheduled against confirmed orders, and every shipment leaves with its documentation, labelling, and technical handover.

3Product lines on one engineering platform
1 dayEnquiry acknowledgement, business days
IEC · GBDesign basis, applied per target market
2×Sourcing on critical components where viable
Milestones
2026.09

Lumivolt Energy founded

2026.10

Website launched and export channels opened

This list will keep growing. We update it as milestones are reached.

How We Work

1. We say what we can do — and what we cannot.

2. We acknowledge enquiries within one business day.

3. We never commit to a lead time we cannot hold.

4. We publish our certification status, including what is still missing.

5. We label development-stage products as development-stage.

Home / News & Insights

News & Insights

Company updates, certification progress, exhibitions, and technical notes on energy storage, power distribution, and solid-state transformer architecture.

Home  /  News & Insights  /  Technical Note

Why replacing the line-frequency transformer changes data centre power design

The transformer is not failing. It simply does nothing except change voltage, and at modern rack densities that is no longer enough.

A device that has been correct for a century

The line-frequency transformer does exactly one thing: it changes voltage by the ratio of its turns. It has no control loop, no firmware, no cooling fan. It is passive, extremely robust, and — measured against what it does — remarkably cheap. Any argument for replacing it has to begin by admitting that. The case is not that the transformer fails. The case is that everything around it has changed.

What changed is the load. A rack that drew five kilowatts now draws sixty. Loads that were uniformly AC are increasingly DC-native. And the constraint on a new facility is less often the energy supply than the floor area available for electrical equipment and the capacity the utility is willing to connect. When the binding constraint moves from cost to volume, the arithmetic changes.

Counting the conversions

Conventional data centre power passes through a chain: medium-voltage AC is stepped down to low-voltage AC by the transformer, converted to DC by the UPS rectifier, stored and re-inverted to AC at the UPS output, distributed as AC to the racks, and converted back to DC inside each server's power supply. That is three AC/DC conversions between medium-voltage AC and the DC the silicon actually consumes; the transformer is a fourth stage, but it only changes voltage.

Each conversion costs two to three percent. Multiplied across the chain, three stages at a nominal ninety-six percent each yield roughly eighty-eight percent, before the transformer, cabling and cooling are counted. At ten megawatts of IT load, every percentage point of system efficiency is worth hundreds of kilowatt-hours per day, continuously, for the life of the facility.

A DC link in the middle of the chain removes two of those three conversions. That is the substance of the argument, and it is independent of any question about the transformer itself.

Frequency is what replaces iron

A transformer's core area scales roughly inversely with the frequency it operates at. That single relationship is the whole reason a solid-state transformer can be small. Raise the link frequency from fifty hertz to twenty kilohertz — a factor of four hundred — and the isolating transformer shrinks from a device occupying a room to one occupying a shelf.

What makes the high frequency possible is the switching device. Silicon carbide MOSFETs tolerate higher voltages, higher temperatures, and higher switching frequencies than silicon IGBTs, with lower switching loss. Without wide-bandgap devices, the topology exists on paper but does not pay for itself; with them, the trade becomes favourable.

It is worth being precise about the sequence of benefits. The transformer gets smaller first, because physics forces it. The control benefits come afterwards, because the conversion is now done by electronics that can be told what to do.

What the architecture does not solve

Replacing several passive devices with one active device concentrates failure modes. A transformer fails loudly and rarely; a power-electronic converter has more ways to fail, and some of them are silent. Redundancy therefore has to be architectural: if the facility requires N plus one, that has to come from parallel units or a designed bypass path, not from a hope that the device is reliable enough.

Protection philosophy changes as well. A power-electronic converter limits its fault current deliberately, which means the protection scheme upstream cannot assume the fault currents it was designed around. This is a design task, not a commissioning detail.

And the certification path differs. Medium-voltage power-electronic conversion equipment is assessed under different standards from conventional switchgear, and that assessment takes time. A project that plans for it late will find the equipment ready before the paperwork.

Where it pays, and where it does not

The useful test is whether the conventional chain is actually binding. If floor area is scarce, if conversion losses are a material operating cost, or if the site needs to control power flow in ways a fixed-ratio device cannot — the architecture is worth evaluating on its numbers.

If none of those are true, the conventional chain is likely the cheaper answer, and a supplier who tells you otherwise is selling architecture rather than solving a problem. There is no virtue in a more modern topology that costs more and solves nothing.

Key points

  • The transformer is reliable; its limitation is that it cannot be controlled.
  • Three AC/DC conversions separate medium-voltage AC from the DC silicon consumes; a DC link removes two.
  • Core size scales inversely with frequency, so the isolating transformer's size follows the switching device, not the topology alone.
  • Reliability, protection philosophy, and certification all have to be redesigned, not inherited.

What this means for partners

This is the architecture behind our SST platform. Two ratings are available today — 13.8 kV / 3.5 MW (Rev. A7) and 10 kV / 2.5 MW — and the article describes the engineering they share. Certification is a separate track and is not complete; the Quality page lists each standard and its status.

If your facility does not yet feel the constraint described above, the conventional chain is probably the right answer for you now. We would rather say that than sell architecture into a problem that does not exist.

Home  /  News & Insights  /  Technical Note

Grid-forming and grid-following: the distinction that decides what a converter can be trusted to do

The two terms describe control behaviour, not marketing tiers. The difference shows up at the point of connection, under conditions the grid does not announce in advance.

What each one actually does

A grid-following converter treats the grid as a reference. It measures the voltage waveform, locks onto its phase with a phase-locked loop, and injects current in step with it. It behaves, electrically, like a current source that has been told what current to produce. Almost all grid-tied solar inverters and most storage PCS units operate this way, and on a strong grid they work extremely well.

A grid-forming converter does the opposite. It synthesises its own voltage and frequency reference and behaves like a voltage source behind a defined impedance. It does not need to be told what the grid is doing; it defines what the local grid is. This is what allows a converter to operate when there is no grid to follow.

The distinction is often introduced as an off-grid topic. It is not. It matters on any connection where the grid is weak, where a high proportion of generation is inverter-based, or where the site has to ride through a disturbance.

Where grid-following runs into trouble

The phase-locked loop is the weak point, and its weakness is proportional to how weak the grid is. A useful measure is the short-circuit ratio: the ratio of available fault current to the rated current of the converter. When that ratio falls — because the grid is remote, or because inverters have displaced the synchronous machines that used to supply fault current — the phase-locked loop has less to lock onto, and stability margins narrow.

In a system where many inverters are following the same weakening grid, the problem compounds. Units that individually behave correctly can interact through the grid impedance and oscillate together at frequencies that no single unit's control was tuned for. This is a system-level phenomenon, and it is not resolved by improving one converter.

The practical consequence is that as inverter-based generation grows, the grid-following assumption — that there is always a strong reference to follow — becomes less safe to rely on.

Fault current is the part nobody plans for

A synchronous machine delivers several times its rated current into a fault, which is exactly what protection relays are built to detect. A grid-following inverter does not. It is a current-limited source: it will hold its output close to rated current and no more, because exceeding its rating would destroy it. To a protection relay set for conventional fault levels, a fault fed only by inverters can look like a mild overload.

A grid-forming converter can be designed to supply a defined fault current contribution — a multiple of rated current for a defined duration — because it is controlling voltage rather than current. That makes protection coordination possible in a way it is not with current-limited sources alone.

This is why the question is asked at design stage and not later. Protection settings, cable sizing, and the choice of converter control all depend on the answer, and changing the answer after the equipment is ordered means changing the equipment.

Inertia, and what it is a proxy for

Rotating machines store kinetic energy in their mass, which resists sudden frequency change. As synchronous generation is displaced by inverters, that natural inertia falls, and the rate of change of frequency after a disturbance rises. Grid-forming converters can emulate inertia by releasing stored DC-link energy in proportion to the frequency derivative, which slows the fall.

The honest caveat is that emulated inertia is bounded by stored energy. It can slow a frequency excursion; it cannot substitute indefinitely for the kinetic energy a large machine would have supplied. Where the requirement is a defined ride-through duration, that has to be stated as a number and matched to the DC-link capacitance, not assumed as a general property.

What to ask a supplier

Ask what the converter does when the grid disappears, not what it is called. Ask for the fault current contribution in multiples of rated current and for how long. Ask whether the unit can form a reference with no other source present, and under what conditions it hands back to the generator or the grid. Ask what the control does when two units disagree about frequency.

A supplier who answers these in numbers is describing a product. A supplier who answers them in adjectives is describing a brochure.

Key points

  • Grid-following = current source following a measured reference; grid-forming = voltage source creating the reference.
  • The weaker the grid (lower short-circuit ratio), the less safe the grid-following assumption becomes.
  • Current-limited inverters can hide faults from protection set for conventional fault levels.
  • Emulated inertia can slow a frequency excursion but is bounded by stored energy — state it as a number.

What this means for partners

Our storage and power distribution scope means the converter control choice and the protection coordination are decided by the same team. That matters here specifically, because the two cannot be decided independently — the answer to one constrains the other.

If you are specifying a microgrid, a weak-grid site, or a facility with a high share of inverter-based generation, this is the conversation to have at the beginning rather than at the commissioning checklist.

Home  /  News & Insights  /  Technical Note

Depth of discharge: the number that decides whether a storage business case holds

Cycle life quoted on a datasheet is measured at a defined depth of discharge. Change that depth and the number changes — which is why the usable capacity in a proposal is a design decision, not a marketing figure.

The datasheet number has a condition attached

A lithium iron phosphate cell advertised at six thousand cycles is not claiming six thousand cycles under all conditions. It is claiming six thousand cycles at a stated depth of discharge, a stated temperature, a stated charge and discharge rate, and a stated end-of-life criterion — typically a residual capacity of eighty percent of beginning of life. Remove any one of those conditions and the number stops being valid.

This is not a trick. It is how cycle life is defined and tested. The difficulty is that the datasheet number travels into proposals and business cases on its own, detached from the conditions it depends on.

Depth of discharge and cycle life are not linearly related

For a typical LFP cell, cycling to a hundred percent depth of discharge might yield something in the region of three to four thousand cycles, while cycling to eighty percent might yield five to six thousand, and to sixty percent considerably more. The relationship is not proportional: each additional percentage point of depth costs more life than the one before it.

The practical consequence is that two systems with identical nameplate capacity can deliver very different total energy throughput over their lives, depending on where the operating window is set. Since throughput is what the business case is actually paying for, the operating window is a financial parameter, not a technical detail.

A system designed to squeeze out maximum daily throughput will cycle deeper and replace sooner. A system designed for longevity cycles shallower and delivers fewer kilowatt-hours per day from the same hardware. Neither is wrong; they are different products being sold under the same capacity label.

Calendar ageing runs in parallel, not in sequence

Cycle ageing is only half of the picture. A cell also ages with time, whether or not it is being cycled, and calendar ageing proceeds faster at higher state of charge and higher temperature. A battery held at full charge in a warm room loses capacity to calendar ageing even if it never cycles.

This matters for residential systems in particular, where the duty cycle is often light. A household that consumes little may cycle the battery only partially each day, yet still lose several percent of capacity a year to calendar ageing alone. The proposal that models purely on cycles will overstate the life of exactly the systems that cycle least.

The honest way to present this is a life estimate bounded by both mechanisms, with the temperature and state-of-charge assumptions stated. A single cycle count is not an estimate; it is a component of one.

Temperature compounds both

Temperature accelerates both cycle ageing and calendar ageing, and the effect is steeper than most people assume. Roughly speaking, each ten degrees of additional cell temperature can halve the calendar life, and it also degrades cycle life. The two effects apply at the same time, so a hot cell does not merely age twice as fast as a cool one in a single respect — it ages faster along two axes at once.

This is why installation location is an electrical parameter. A ventilated utility room and an unheated summer garage differ by far more than ten degrees for much of the year. The same pack, the same duty cycle, and the same capacity can produce very different service lives purely because of where the cabinet was bolted.

A design that does not ask about the installation location is not a design that has accounted for temperature. It has just left it out.

Reserve bands are designed, not leftover

Not all of a battery's capacity should be available for daily cycling. A band at the top is worth reserving so that unexpected solar generation can be absorbed rather than curtailed, and a band at the bottom is worth reserving so that backup capability remains available when it is needed. Both reduce daily throughput and both extend life.

The point is that these bands should be chosen deliberately, as part of the design, rather than left to whatever the inverter's built-in algorithm happens to do. A default state-of-charge window is a decision that was made by someone, for someone; it is worth knowing who and for what.

What to put in a contract

The measurable commitments are operating window, temperature, and end-of-life criterion. A warranty that guarantees a capacity percentage without stating the state-of-charge window and the temperature range it applies to is guaranteeing something the supplier cannot control and the buyer cannot verify.

The better arrangement states all three, and states what happens when the site's measured temperature or duty cycle falls outside the assumed range. That is not a hostile question. It is the question that separates a warranty designed to be claimed from one designed never to be paid.

Key points

  • Datasheet cycle life is valid only at a stated depth of discharge, temperature, rate, and end-of-life criterion.
  • Cycle life falls faster than linearly as depth of discharge increases; shallower cycling buys disproportionately more life.
  • Calendar ageing and temperature operate at the same time as cycle ageing, not after it.
  • Reserve bands reduce daily throughput and extend life — they are a design choice, not a leftover.

What this means for partners

Because storage and distribution come from one scope, the operating window, the thermal design of the enclosure, and the protection coordination are set by the same team that has to stand behind the warranty. That is what makes it possible to quote a capacity figure that is actually achievable in the installation the customer has.

For a distributor, the practical difference is this: a system sized on a realistic depth of discharge may carry a lower headline capacity than a competitor's, and will still be delivering that capacity in year eight while the competitor's has been derated or replaced.

Home / Contact

Contact Us

Tell us what you are planning. International enquiries are handled by our Singapore office, and we will help define the next step.

Tell us what you are planning. We will help define the next step.

Enquiry Form

By submitting, you agree to our Privacy Policy.

Other Ways to Reach Us
Regional office
Singapore

International sales, partner onboarding and project coordination.

Address18 Kaki Bukit Road 3, #05-17
Entrepreneur Business Centre
Singapore 415978
Time zoneGMT+8 · Asia/Singapore
✉
Sales & quotations sales@lumivoltenergy.com Quotations, samples, distributor and OEM enquiries.
⚙
Technical tech@lumivoltenergy.com Certification, datasheets and engineering questions.
Markets We Serve
  • Southeast AsiaSingapore · Malaysia · Vietnam · Indonesia · Thailand · Philippines
  • EuropeGermany · Netherlands · Belgium · Austria · Switzerland · United Kingdom
  • Middle EastUnited Arab Emirates · Saudi Arabia · Qatar · Kuwait · Oman · Bahrain
  • North AmericaUnited States · Canada · Mexico
Four ways to work with us

We are export-first and building long-term brand partnerships, not one-off shipments. All four start the same way: one document that states what is in scope.

For defined projects

Project quotation

Send the load profile, site constraints and target market. You get a configured quotation with model numbers and stated assumptions.

For brand owners and distributors

OEM / ODM

Hardware built to your specification and labelling, with the documentation set your market requires.

For regional partners

Channel distribution

Territory agreement, technical training and joint project support. Certification status disclosed per market.

For new applications

Pilot validation

A validation unit tested under your real operating conditions, with a joint evaluation plan and recorded results.

Home / Imprint

Imprint

Company information provided pursuant to § 5 DDG (formerly § 5 TMG).

Home / Privacy Policy

Privacy Policy

How we handle personal data when you visit this website or send us an enquiry, under the EU General Data Protection Regulation (GDPR).

This website uses only technically necessary cookies by default. No analytics or marketing cookies are set without your consent.